HomeMy WebLinkAbout20220522 Ver 1_SAW-2021-02629-PN_20220504US Army Corps
Of Engineers
Wilmington District
PUBLIC NOTICE
Issue Date: May 4, 2022
Comment Deadline: June 3, 2022
Corps Action ID Number: SAW-2021-02629
The Wilmington District, Corps of Engineers (Corps) received an application from NorthPoint
Development, LLC seeking Department of the Army authorization to impact, 1,610 linear feet
(1f) of jurisdictional streams, 0.19-acre of a jurisdictional wetland, and 1.58 acre of a
jurisdictional pond which contribute hydrology to Fourth Creek associated with the construction
of five distribution warehouse facilities near the intersection of I-77 and I-40, near Statesville,
Iredell County, North Carolina.
Specific plans and location information are described below and shown on the attached plans.
This Public Notice and all attached plans are also available on the Wilmington District Web Site
at: https://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Public-Notices/
Applicant: NorthPoint Development, LLC
Michael Johnston
4805 Montgomery Road, Suite 310
Cincinnati, Ohio 45212
mjohnston@northpointkc.com
AGENT (if applicable): Kimley-Horn and Associates, Inc
Chris Tinklenberg
200 South Tryon Street, Suite 200
Charlotte, North Carolina 28202
Chris.tinklenberg@kimely-horn.com
Authority
The Corps evaluates this application and decides whether to issue, conditionally issue, or deny
the proposed work pursuant to applicable procedures of the following Statutory Authorities:
® Section 404 of the Clean Water Act (33 U.S.C. 1344)
❑ Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403)
❑ Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33
U.S.C. 1413)
Version 6.15.2017 Page 1
Location
Location Description: The project site is located off Crawford Road, Northeast of the
intersection of I-77 N and I-40 E near the municipality of Statesville, in Iredell County, North
Carolina.
Project Area (acres): 428.2 Nearest Town: Statesville
Nearest Waterway: Fourth Creek River Basin: Yadkin-PeeDee
Latitude and Longitude: 35.819623N,-80.850758W
Existing Site Conditions
Facility Site
The 427-acre site is located in the Yadkin-PeeDee River Basin (030401020402) and consists of
undeveloped forested land, agricultural fields and a single-family residence. The project site is
bound by agricultural and undeveloped forestland to the north, Crawford Road to the East,
undeveloped forestland and commercial development to the south, and cleared and undeveloped
forestland to the west.
The vegetation community consists predominately of winged elm (Ulmus alata), willow oak
(Quercus phellos), sweetgum (Liquidambar styraciflua), red maple (Acer rubrum), tulip poplar
(Liriodendron tulipifera) and pawpaw (Asimina triloba) which covers the majority of the site.
The USDA Web Soil Survey of Iredell County identifies the following soil mapping units within
the project area:
Table 1. Project Area Soils
Soil Type
Soil Description
Rating
Acres in
AOI
Percent
of AOI
CmC2
Clifford sandy clay loam, 6 to 10 percent
slopes, moderately eroded
0
2.8
0.7%
CsA
Codorus Loam, 0 to 2 percent slopes,
frequently flooded
5
19.5
4.6%
DAM
Dam
0
1.9
0.4%
FaE
Fairview sandy loam, 15 to 25 percent slopes
0
7.3
1.7 %
FrB2
Fairview sandy clay loam, 2 to 6 percent
slopes, moderately eroded
0
4.9
1.1%
FrC2
Fairview sandy clay loam, 6 to 10 percent
slopes, moderately eroded
0
12.5
2.9%
FrD2
Fairview sandy clay loam, 10 to 15 percent
slopes, moderately eroded
0
15.7
3.7%
FwE2
Fairview sandy clay loam, 15 to 25 percent
slopes, moderately eroded
0
16.4
3.8%
Version 6.15.2017
Page 2
PxD4
Poplar Forest- Udorthents complex, 2 to 15
percent slopes, gullied
0
7.7
1.8%
ToB2
Tomlin sandy clay loam, 2 to 6 percent
slopes, moderately eroded
0
110.7
25.9%
ToC2
Tomlin sandy clay loam, 6 to 10 percent
slopes
0
131.0
30.6 %
ToD2
Tomlin sandy clay loam, 10 to 15 percent
slopes, moderately eroded
0
64.7
15.1 %
ToE2
Tomlin sandy clay loam, 15 to 25 percent
slopes, moderately eroded
0
11.9
2.8%
UdE
Udorthents, loamy, 0 to 25 percent slopes
0
0.1
0.0 %
UmF
Udorthents-Urban land complex, 0 to 45
percent slopes
0
1.0
0.2%
Ur
Urban Land
0
0.1
0.0 %
W
Water
0
19.9
4.6 %
Total for Area of Interest (AOI)
428.3
100%
404/401 Permit History
An aquatic resources delineation was completed within the project site and was verified by the
U.S. Army Corps of Engineers (USACE) on January 19, 2022. The project area contains 13,783
LF of streams, 7.4-acres of wetlands, and 19.3-acres of open waters.
No permits are currently existing within the project boundary.
Applicant's Stated Purpose
Basic: The basic purpose is to provide warehousing and supply -chain distribution space to
service the Charlotte MSA.
Overall: The overall purpose is to construct a large-scale, master -planned industrial logistics
complex to provide warehousing and supply -chain distribution space to meet current and future
demands of consumers within the southeastern United States.
Project Description
According to the applicant, their preferred project alternative involves impacts to aquatic
resources totaling 1,610 LF of streams, 0.19-acre of wetlands and 1.58 -acres of open waters.
The proposed fill and project include the construction of access roads, parking, utilities, and
stormwater management facilities. The proposed project seeks to construct five (5) distribution
warehouse buildings, totaling + 3,856,680 SF. Trailer and employee parking are required. While
the stormwater plan has not been finalized, it is anticipated that nine ponds will be required to
satisfy the stormwater management needs of the stie and are strategically positioned without
additional stream, wetlands and open water impacts. Permit drawings are attached to this Public
Notice.
Version 6.15.2017 Page 3
Due to the size of the warehouse buildings and the north/south orientation of the project site, the
location and layout of the facilities were limited to the eastern portion of the property where a
larger, contiguous development cluster could be created. The applicant chose the eastern portion
of the property to maximize the use of uplands and minimize impacts to streams, wetlands and
open waters to the greatest extent practicable.
The project proposes to be constructed in two phases. Phase I is in the northwestern portion of
the site and includes the construction of Building 4. Phase II encompasses the remaining portions
of the project site and includes Buildings 1, 2, 3, and 5. No impacts are associated with the
construction of phase I. Construction access will be provided via Jane Sowers Road. The
anticipated build -out of all phases of construction is approximately five years. Considering the
project area of Phase I is geographically separated from Phase II, the location and layout of
Building 4 is not dependent upon Phase II. (Phase II is not dependent on Phase I), and there are
no impacts to aquatic resources associated with Phase I. The applicant seeks to move forward on
construction of Phase I, while permit authorization is sought for Phase II.
Avoidance and Minimization
The applicant provided the following information in support of efforts to avoid and/or minimize
impacts to the aquatic environment:
As part of the overall project, the applicant completed a thorough alternatives analysis. A
review of the 404(b)(1) guidelines indicates that "(a) Except as provided under section
404(b)(2), no discharge of dredged or fill material shall be permitted if there is a practicable
alternative to the proposed discharge which would have less adverse impact on the aquatic
ecosystem, so long as the alternative does not have other significant adverse environmental
consequences." The guidelines define practicable alternatives as "(q) The term practicable
means available and capable of being constructed after taking into consideration cost, existing
technology, and logistics in light of overall project purposes."
The guidelines outline further consideration of practicable alternatives:
"(1) For the purpose of this requirement, practicable alternatives include, but are not limited to:
(i) Activities which do not involve a discharge of dredged or fill material into the waters of the
United States or ocean waters.
(ii) Discharges of dredged or fill material at other locations in waters of the United States or
ocean waters.
(2) An alternative is practicable if it is available and capable of being constructed after taking
into consideration cost, existing technology, and logistics in light of overall project purposes. If
it is otherwise a practicable alternative, an area not presently owned by the applicant which could
reasonably be obtained, utilized, expanded, or managed to fulfill the basic purpose of the
proposed activity may be considered."
Considering the guidelines above and having identified Iredell County as the most advantageous
location for the proposed industrial park, the applicant evaluated a No Action Alternative and
six alternative sites including the applicant's preferred site. In addition, three on -site
Version 6.15.2017 Page 4
configurations were evaluated including the applicant's preferred on -site configuration. As part
of this alternative evaluation, the following "Practicability/Reasonability Screening Selection
Criteria" were applied to each alternative to confirm whether the particular alternative and/or
on -site configuration was practicable:
• Capable of being constructed considering cost (e.g., Is the cost reasonable considering
scope and type of project considering total cost, funding source, profit margin, etc.)
• Capable of being constructed considering logistics (e.g., Must consider existing
infrastructure, traffic patterns, etc.)
• Property can be reasonably obtained (e.g., Must consider availability, liens, etc.)
• Proximity to workforce
• Meets basic project purpose
• Meets overall project purpose
No Action Alternative
A No Action Alternative must be considered, and complete avoidance of aquatic resources was
the first alternative considered for this project. Due to the location of aquatic resources and
proposed land use (industrial warehousing), it was determined that complete avoidance of
stream and wetland impacts was not feasible. Unlike many development activities (i.e.,
residential, recreational, or light commercial), little flexibility is afforded in warehouse design.
Industry standards dictate building widths and lengths; and access, parking, and docking
requirements associated with semi -trailer truck traffic greatly limit design flexibility. For these
reasons, major modifications to the facility footprint beyond a reduction in square footage to
the minimum square feet are not feasible. While this option would result in no impacts to
jurisdictional features, it would not fulfill the need for warehousing distribution space in the
Charlotte MSA. Because the No Action Alternative and complete avoidance of impacts
prohibits the construction of the proposed logistics park, this alternative was determined to be
unreasonable and not practicable.
Off -Site Alternatives
In addition to the six general Practicability/ Reasonability Screening Selection Criteria
evaluated, specific criteria including geographic location, size, zoning, utilities, access, and
availability were considered. The following provides a summary of each criterion.
• Size: The potential site must be 350 acres or more to accommodate the required minimum
size of the development.
• Geographic Location: The proposed project will provide warehousing and logistics
services to the Charlotte MSA. Sites considered for this project were limited to the I-77
corridor with connectivity to I-40. Additionally, potential sites within the Lake Norman
Water Supply Watershed (WSW) area were excluded to avoid high -density development
within the environmentally sensitive watershed.
Version 6.15.2017 Page 5
• Land Use/Zoning: Land use restrictions associated with current zoning are a major
consideration in all industrial projects. Truck traffic, equipment operation, adjoining land
use, buffers, etc. make the location of the project and the current zoning a critical
component. For this site screening criterion, tracts that are currently zoned for the intended
use or that could be reasonably re -zoned to accommodate the proposed project were
considered.
• Utilities: Utility services or access to utility services (e.g., water, sewer, electrical, gas,
phone, cable) are required. For this reason, the location of existing utilities and the cost
associated with servicing the project site if those utilities were not already available was
considered in the site screening criteria.
• Availability: Sites listed for sale and/or known to be available for purchase were
considered.
• Access: Access to a warehousing and distribution facility requires the continual operation
of large semi -trailer trucks. For this project, three access criteria were established. First,
the site must provide suitable access to a major interstate. Suitable access to a major
interstate would be defined as direct access to the site from a paved road suitable to
support truck traffic associated with the proposed facility. Second, the site must be located
adjacent to or within three miles of an interstate interchange. For this project, alternative
sites were limited to major interchanges along I-77 and I-40.
On -Site Configurations
In addition to considering off -site alternatives, the applicant considered on -site alternatives.
Alternatives Not Practicable or Reasonable
Following reviews of off -site alternatives and on -site configurations, the applicant completed a
comparison of alternatives to the practicability/reasonability screening criteria. Table 1 on the
following page summarizes a comparison of each alternative discussed above to the screening
criteria for practicability and reasonableness.
Practicability/
Reasonability
Screening
Selection
Criteria
Alt
1
Alt
2
Alt
3
Alt
4
Alt
5
Alt
6
On -site
Configuration
Alt 1
On -Site
Configuration
Alt 2
On -Site
Configuration
Alt 3
(Applicant's
preferred)
No
Action
General
Screening
Criteria
No
No
Yes
Yes
No
Yes
Yes
Yes
Yes
No
Size
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Geographic
Location
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Land
use/Zoning
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Version 6.15.2017
Page 6
Utilities
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Availability
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Access
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Practicable
Site (Y or N)
No
No
Yes
Yes
No
Yes
Yes
Yes
Yes
No
Table 1: Summary Table for Practicability and Reasonableness Screening Selection
Criteria 6.1
Compensatory Mitigation
The applicant offered the following compensatory mitigation plan to offset unavoidable
functional loss to the aquatic environment:
Compensatory mitigation will be met by the purchase of credits through NC Division of
Mitigation Services (NCDMS) in -lieu fee program. 1,610 LF of streams will be mitigated
through the purchase of stream mitigation credits. 0.19-acres of wetland impacts will be
mitigated through the purchase of wetland mitigation credits.
Table 3 provides a summary of the stream and wetland impacts, NCSAM/NCWAM rating, and
the proposed mitigation ratio.
Table 3:
Impact
(LF/Acre)
NCSAM/NCWAM rating
Ratio
Credit Amount
Stream 1
(Perennial)
85
Medium
2:1
170
Stream 2
(Perennial)
85
Low
1.75:1
149
Stream 4
(Perennial)
1,055
Medium
2:1
2,110
Stream 5
(Intermittent)
81
Medium
1.75:1
142
Stream 6
(Perennial)
247
Medium
2:1
494
Stream 11
(Intermittent)
57
Low
1.5:1
86
Wetland 5
0.19
Low
2:1
0.38
Total Stream Credits
3,151
Total Wetland Credits
0.38
In total 3,151 stream mitigation credits and 0.38 wetland mitigation credits will be purchased
from NCDMS to offset impacts associated with this project. Quality assessment results and
NCDMS mitigation acceptance are included in Appendix A.
Version 6.15.2017
Page 7
Upon completion and implementation of practical avoidance and minimization efforts, a total of
1.58 acres of permanent impacts to open water is associated with fill and grading are
unavoidable. The Corps does not required mitigation for open water impacts to man-made
impoundments. Therefore, the applicant does not offer compensatory mitigation for the open
water impacts.
Essential Fish Habitat
Pursuant to the Magnuson -Stevens Fishery Conservation and Management Act, this Public
Notice initiates the Essential Fish Habitat (EFH) consultation requirements. The Corps' initial
determination is that the proposed project would not effect EFH or associated fisheries managed
by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine
Fisheries Service.
Cultural Resources
Pursuant to Section 106 of the National Historic Preservation Act of 1966, Appendix C of 33
CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the
District Engineer consulted district files and records and the latest published version of the
National Register of Historic Places and initially determines that:
❑ Should historic properties, or properties eligible for inclusion in the National Register, be
present within the Corps' permit area; the proposed activity requiring the DA permit (the
undertaking) is a type of activity that will have no potential to cause an effect to an
historic property.
❑ No historic properties, nor properties eligible for inclusion in the National Register, are
present within the Corps' permit area; therefore, there will be no historic properties
affected. The Corps subsequently requests concurrence from the SHPO (or THPO).
❑ Properties ineligible for inclusion in the National Register are present within the Corps'
permit area; there will be no historic properties affected by the proposed work. The Corps
subsequently requests concurrence from the SHPO (or THPO).
❑ Historic properties, or properties eligible for inclusion in the National Register, are
present within the Corps' permit area; however, the undertaking will have no adverse
effect on these historic properties. The Corps subsequently requests concurrence from the
SHPO (or THPO).
❑ Historic properties, or properties eligible for inclusion in the National Register, are
present within the Corps' permit area; moreover, the undertaking may have an adverse
effect on these historic properties. The Corps subsequently initiates consultation with the
SHPO (or THPO).
Version 6.15.2017 Page 8
❑ The proposed work takes place in an area known to have the potential for the presence of
prehistoric and historic cultural resources; however, the area has not been formally
surveyed for the presence of cultural resources. No sites eligible for inclusion in the
National Register of Historic Places are known to be present in the vicinity of the
proposed work. Additional work may be necessary to identify and assess any historic or
prehistoric resources that may be present.
The District Engineer's final eligibility and effect determination will be based upon coordination
with the SHPO and/or THPO, as appropriate and required, and with full consideration given to
the proposed undertaking's potential direct and indirect effects on historic properties within the
Corps -identified permit area.
Endangered Species
Pursuant to the Endangered Species Act of 1973, the Corps reviewed the project area, examined
all information provided by the applicant and consulted the latest North Carolina Natural
Heritage Database. Based on available information:
❑ The Corps determines that the proposed project would not affect federally listed
endangered or threatened species or their formally designated critical habitat.
❑ The Corps determines that the proposed project may affect federally listed endangered or
threatened species or their formally designated critical habitat.
n By copy of this public notice, the Corps initiates consultation under Section 7 of the
ESA and will not make a permit decision until the consultation process is complete.
n The Corps will consult under Section 7 of the ESA and will not make a permit
decision until the consultation process is complete.
n The Corps has initiated consultation under Section 7 of the ESA and will not make a
permit decision until the consultation process is complete.
❑ The Corps determines that the proposed project may affect federally listed endangered or
threatened species or their formally designated critical habitat. Consultation has been
completed for this type of activity and the effects of the proposed activity has been
evaluated and/or authorized by the National Marine Fisheries Service (NMFS) in the
South Atlantic Regional Biological Opinion or its associated documents, including
7(a)(2) & 7(d) analyses and Critical Habitat assessments. A copy of this public notice
will be sent to the NMFS.
❑ The Corps is not aware of the presence of species listed as threatened or endangered or
their critical habitat formally designated pursuant to the Endangered Species Act of 1973
(ESA) within the project area. The Corps will make a final determination on the effects of
the proposed project upon additional review of the project and completion of any
Version 6.15.2017 Page 9
necessary biological assessment and/or consultation with the U.S. Fish and Wildlife
Service and/or National Marine Fisheries Service.
Other Required Authorizations
The Corps forwards this notice and all applicable application materials to the appropriate State
agencies for review.
North Carolina Division of Water Resources (NCDWR):
The Corps will generally not make a final permit decision until the NCDWR issues, denies, or
waives the state Certification as required by Section 401 of the Clean Water Act (PL 92-500).
The receipt of the application and this public notice, combined with the appropriate application
fee, at the NCDWR Central Office in Raleigh constitutes initial receipt of an application for a
401 Certification. Unless NCDWR is granted a time review extension, a waiver will be deemed
to occur if the NCDWR fails to act on this request for certification within 120 days of receipt of
a complete application. Additional information regarding the 401 Certification may be reviewed
at the NCDWR Central Office, 401 and Buffer Permitting Unit, 512 North Salisbury Street,
Raleigh, North Carolina 27604-2260. All persons desiring to make comments regarding the
application for a 401 Certification should do so, in writing, by July 2, 2022, to:
NCDWR Central Office
Attention: Mr. Paul Wojoski, 401 and Buffer Permitting Unit
(USPS mailing address): 1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Or,
(physical address): 512 North Salisbury Street, Raleigh, North Carolina 27604
North Carolina Division of Coastal Management (NCDCM):
❑ The application did not include a certification that the proposed work complies with and
would be conducted in a manner that is consistent with the approved North Carolina
Coastal Zone Management Program. Pursuant to 33 CFR 325.2(b)(2) the Corps cannot
issue a Department of Army (DA) permit for the proposed work until the applicant
submits such a certification to the Corps and the NCDCM, and the NCDCM notifies the
Corps that it concurs with the applicant's consistency certification. As the application
did not include the consistency certification, the Corps will request, upon receipt„
concurrence or objection from the NCDCM.
Based upon all available information, the Corps determines that this application for a
Department of Army (DA) permit does not involve an activity which would affect the
coastal zone, which is defined by the Coastal Zone Management (CZM) Act (16 U.S.C. §
1453).
Version 6.15.2017 Page 10
Evaluation
The decision whether to issue a permit will be based on an evaluation of the probable impacts
including cumulative impacts of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The benefit
which reasonably may be expected to accrue from the proposal must be balanced against its
reasonably foreseeable detriments. All factors which may be relevant to the proposal will be
considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife
values, flood hazards, flood plain values (in accordance with Executive Order 11988), land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For activities involving
the discharge of dredged or fill materials in waters of the United States, the evaluation of the
impact of the activity on the public interest will include application of the Environmental
Protection Agency's 404(b)(1) guidelines.
Commenting Information
The Corps of Engineers is soliciting comments from the public; Federal, State and local agencies
and officials, including any consolidated State Viewpoint or written position of the Governor;
Indian Tribes and other interested parties in order to consider and evaluate the impacts of this
proposed activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment (EA) and/or an
Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act
(NEPA). Comments are also used to determine the need for a public hearing and to determine the
overall public interest of the proposed activity.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider the application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing. Requests for a public hearing will be
granted, unless the District Engineer determines that the issues raised are insubstantial or there is
otherwise no valid interest to be served by a hearing.
The Corps of Engineers, Wilmington District will receive written comments pertinent to the
proposed work, as outlined above, until 5pm, June 3, 2022. Comments should be submitted to
Ms. Krystynka Stygar, Asheville Regulatory Field office, 151 Patton Avenue, Room 208,
Asheville, North Carolina 28801, or by telephone at (252) 545-0507.
Version 6.15.2017 Page 11