Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC221698_Site Plan or Location Map_20220503
L� N10 FIDE C C TEMPORARY / 4 / \ HARDWARE CLOTH & GRAVEL INLET PROTECTION (TYP.) I / LIMITS OF DISTURBANCE, TYP. / (APPROXIMATELY 771 SF OF DISTURBANCE OVERLAP WITH / / THE HELIPAD PROJECT) / I - DECK LIMITS OF DISTURBANCE, TYP. I I � - TEMPORARY SKIMMER BASIN #1 BASIN DEPTH = 3.0 FT OVERALL TOP DIMENSIONS = 31'W X 106'L TOP DAM ELEVATION = 836.50 SPILLWAY ELEVATION = 835.00 BOTTOM ELEVATION = 832.00 ' SPILLWAY WEIR LENGTH = 9.0' I 1 ' 5 BAFFLES C-6.01 r 3-4 3.0" SKIMMER I C-6.01 W / 1.5" ORIFICE /I CIO M INV OUT `O 831.00 1 TEMPORARY M CONSTRUCTION CIO C_6 00 ENTRANCE , (TYP.) 75 LF 24" RCP @ 2.0% Q '' 1 , 2 SDMH-09 I � TEMPORARY INV IN 820.78 (SDMH-10) o 'I C 6.00 SILT FENCE INV IN 821.78 (SDMH-15) o ' (TYP.) INV OUT 820.58 J • 135 LF 4" SCH 40 PVC 'I FFE04222110 @ 1.00% MIN. • CONNECT TO SDMH-08 ' a1 I SD H-08 - c V co CIO 00 ° DECK B 821 � I I \ 822 / 823 Szs ♦ � 826 i 828 - EMERGENCY - - -� _j DEPARTMENT TEMPORARY 5 �Q DECK DIVERSION BERM / - (TYP.) C 6.00 I 629 � ♦T� � � I a� l ARMORE WEST 83 TOWER _ � \ Z1 - -832 %+ FIFE: 835.44 I w 833 I 833 ' o • I O I _'834- - O I � I _ TEMPORARY SI � _T%0 000- BASIN 73 W TEMPORARY SLOPE DRAIN #1-- �� (1) 15" HDPE PIPE / 1 •- ARMORE EAST TOWER -� , + FIFE: 852.70 IN 4'W X 8'L X 3�� 'D EXCAVATED PIT - PROVIDE 1 POLYMER FLOC LOG IN C-6.00 - J h SLOPE DRAIN PIPEFee/ •Ir• - • .. A �) CIO ' / .� • . so ,�• 'may T MPORARY I 5 �• O �D IVERSION O O C 6.00 O ERM ` 0 c0 � N co CIO SDMH-15 CO M RIM 835.00 CIO INV IN 830. 0 (SKIMMER) INV OUT 8 3.28 TEMPORARY SLOPE DRAIN #2 (1) 15" HDPE PIPE 10 IN 4'W X 8'L X 3'D EXCAVATED PIT C-6. PROVIDE 1 POLYMER FLOC LOG IN SLOPE DRAIN PIPE 24 LF 1 'RCP WITVA MOUNT BLE DIVVNSION BE SD -10 m t16 -4� NDB-26 I G I-20 / COL k/ (� ' COL �- I oL N I JAN EWAY + 856.80 /8496 coL�W I � TOWER /COL MAIN FFE 850 8 +FFE: 850.98 COL JANEWAY e 851.40 COL COL COL COL + o JAN AY COL I + as1 , a I \ I/+ $51.66 COL / %r - COL COL \ / l 111 Ill III � C I SD e COL a / _ oL COL -- COL � f REYNOLpDS SDMH-13 - o COL COL I l TOWER � 1 U - g`03 853\'J LO EX-CI-1 ,^ jo I I ` 44.59 4 ` +esze� vl - / / TEMPORARY 2 o s°� w - S� - / SILT FENCE OUTLET C 6.00 W (TYP.) I I NDB-21 - - NDB-23 Aso NI 24 � � � � � � NDB-22 ` N i - - j 3�8ss EX-SDMH-14 LU co Lij DECK co v \ TEMPORARY 5 2 GI-2 - - DIVERSION BERM TEMPORARY- / (TYP.) C 6.00 HARDWARE CLOTH & - = GRAVEL INLET F AM B U LA PROTECTION (TYP.) �� • CAR \ C- \ \ \ PHASE LINE 86a SEE DECK B DEMO PHASING SEE EROSION CONTROL PLAN (SHEET NOTE #1 ON SHEET C-1.00 ) �Q� i , C-3.00) FOR PHASE 1 EROSION CONTROL v • T \ S - _ - INFORMATION. • 836A / _ � V - - �gci • SD 0 V-83 � + 836.18 \ O I 838- 833.4, + 841.38 fl \ \ \ I LP - _: + 836.58 / / \ \ SD ` I \ / �� ` / • I• ��M -839_ / - / 83j + 319/ / 8 ° + 84,.40 / / • +e713a �Q � _ �s + 856.44 I847\+ 841.43 . 841-- - •� + 841.38 \1 • � I I -� / / / - / 11 v842 o � 84 eas17 i A -843 o STICHT - 5 �•�d CENTER TING BRICK e o N 8 I� \ _ U/LD/N" vvv o / ♦/ / __� --� - 846 84 P / ` \ 263 / /. --� 11 + 85722 • + Cj I � \ 853.15 / I I \ / \_ (J W -- - - - \ I +853.19 8303 / -{/ \ ^�x� in 1 / \ a SO - --'® ��� v s� - �- - -SDI C) + 874.39 + 874.57 -6' + 835.49 I / SD_/_ SD _ I I hO / / -7 9 + 875.95 \ • ' / / / \ \ C�I�D �0 i0 I 2 p6 66p2 69 I 2 ^ ^ /QO° / WV 2h4ry k62 + 8]5,61 / / \ J g S / / / / / 5 / I k -� = X$6 X$ X� kg^� x$ \k� X� ( k$ C l - �I / �9 / I SD \ \ • I I I � � � i \ M + 836,E _ M Queen Street ! v - � SD v M _I - �v�9,�(Variable Public ROM \ \ \ + 835.35 � + 835. 51 co / / l l / / SD / A 0+ ILL T FH - -- NOTES: 1. SITE DISTURBED AREA = 3.89 ACRES ± 2. SEE C-0.01 THROUGH C-0.03 FOR EROSION CONTROL NOTES, NCG01 GROUND STABILIZATION AND MATERIALS HAND NOTES, AND NCG01 SELF -INSPECTION RECORD KEEPING AND REPORTING NOTES. 3. SEE SEQUENCE OF CONSTRUCTION ON THIS SHEET. SEQUENCE OF CONSTRUCTION:AA 1. ONCE PERIMETER MEASURES ARE INSTALLED AND APPROVED BY THE EROSION CONTROL INSPECTOR, BEGIN SITE DEMOLITION. ALL DISTURBED AREAS SHALL BE DRAINING TO TEMPORARY EROSION CONTROL MEASURES. ADD ADDITIONAL MEASURES (E.G., SILT FENCE, ETC.) AS REQUIRED TO CONTAIN SEDIMENT WITHIN THE LIMITS OF DISTURBANCE. 2. AS DECK B DEMOLITION PROGRESSES, CONSTRUCT DIVERSION BERMS AS REQUIRED TO DIVERT RUNOFF FROM DISTURBED AREA TO TEMPORARY SKIMMER BASIN #1. 3. INSTALL PROPOSED RETAINING WALL ON THE NORTH SIDE OF DECK A. INSTALL STORM DRAINAGE, WATER MAIN, AND PRIMARY DUCT BANK. INSTALL TEMPORARY INLET PROTECTION AT APPROPRIATE STORM STRUCTURES AS SOON AS THEY ARE INSTALLED. 4. INSTALL TEMPORARY ASPHALT DIVERSION BERM ONCE STORM DRAINAGE IS INSTALLED AT JANE WAY ENTRANCE. 5. INSURE THAT ALL DISTURBED ARES ARE DRAINING TO EITHER THE TEMPORARY SKIMMER BASIN, SILT FENCE (W/ STONE OUTLET PROTECTION), OR INLET PROTECTION. 6. THE FINISHED GRADES SHOWN ON THIS DRAWING REPRESENT AN INTERIM CONDITION AND DO NOT REPRESENT FINAL SITE GRADES. THE FINAL EROSION CONTROL PLAN WILL BE SUBMITTED FOR REVIEW AND APPROVAL AT A LATER DATE. 7. ALL DISTURBED GROUND SURFACES SHALL BE STABILIZED IN ACCORDANCE WITH THE GROUND STABILIZATION TIME FRAMES TABLE ON SHEET C-0.02. 8. CONTACT THE EROSION CONTROL INSPECTOR FOR AN INSPECTION. 9. REMOVE THE EROSION CONTROL DEVICES AFTER RECEIVING APPROVAL FROM THE EROSION CONTROL INSPECTOR. Q10. SEED ALL REMAINING DISTURBED AREAS. 1 GRADING & EROSION CONTROL: ® PROPOSED SILT FENCE STONE OUTLET DECK 13 PROPOSED WIRE & GRAVEL INLET PROTECTION 0 PROPOSED SILT SACK INLET PROTECTION NAG S75BN MATTING 1� 100 PROPOSED MAJOR CONTOURS 101 PROPOSED MINOR CONTOURS PROPOSED STORM DRAINAGE LINE RL RL RL PROPOSED ROOF LEADER -100- EXISTING MAJOR CONTOURS 101- EXISTING MINOR CONTOURS SD EXISTING STORM DRAINAGE LINE MEADS HALLDIVERSION BERM MEADS HALL < < FLOW / SWALE LINE LOD LIMITS OF DISTURBANCE ti SILT FENCE ASPHALT DIVERSION BERM 0 30 0 North 30 SCALE: 1" = 30' 60 90 © 2021 HKS ARCHITECTS, INC. H I<S ARCHITECT HKS ARCHITECTS, INC. 2100 E. CARY STREET SUITE 100 RICHMOND, VA 23223 CPL I ARCHITECTURE ENGINEERING PLANNING 6302 FAIRVIEW RD. SUITE 102 CHARLOTTE, NC 28210 STRUCTURAL WALTER P MOORE 227 WEST TRADE STREET, SUITE 2040 CHARLOTTE, NC 28202 MEP WSP USA INC. 2201 SOUTH BOULEVARD SUITE 230 CHARLOTTE, NC 28203 CIVIL STIMMEL 619 S. CEDAR STREET, SUITE L CHARLOTTE, NC 28202 `00 oll Atrium Health Wake Forest Baptist PROJECT EAST CARE TOWER OWNER ATRIUM HEALTH WAKE FOREST BAPTIST MEDICAL CENTER MEDICAL CENTER BOULEVARD WINSTON SALEM, NC 27157 PROGRAM MANAGER STANTEC 2127 AYRSLEY TOWN BOULEVARD SUITE 300 CHARLOTTE, NC 28273 CONSTRUCTION MANAGER BRASFIELD & GORRIE 521 EAST MOREHEAD STREET SUITE 500 CHARLOTTE, NC 28202 FRANK L. BLUM CONSTRUCTION COMPANY 830 EAST 25TH STREET WINSTON-SALEM, NC 27105 NCBEES CERT. NO.: C-1347 AL 27912 03/25/22 NOT A CERTIFIED DOCUMENT AS TO THE ORIGINAL DOCUMENT BUT ONLY AS TO THE ADDENDUM 02 REVISIONS. THIS DOCUMENT ORIGINALLY ISSUED AND SEALED BY AUSTIN W. KEY, P.E. #043196, ON 10/22/21. THIS DOCUMENT IS ONLY CERTIFIED AS TO THE ADDENDUM 02 AND FUTURE REVISIONS. KEY PLAN REVISION NO. DESCRIPTION DATE 1 CITY OF WS COMMENTS 01/06/22 2 ADDENDUM 03 02/04/22 3 CITY OF WS COMMENTS 02/10/22 4 CITY OF WS COMMENTS 03/25/22 HKS PROJECT NUMBER 24332.000 DATE NOVEMBER 18, 2021 ISSUE DECK D DEMO PERMIT SHEET TITLE EROSION CONTROL PLAN STAGE 2 - DECK D DEMO SHEET NO Cw3w02