Loading...
HomeMy WebLinkAboutGW1-2022-04106_Well Construction - GW1_20220418 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well C tractor Information: ge, '.-14:'WATER ZONES-�:_ dzn2 %-- E- . 10A FROM TO I DESCItIPTION Well Contractor Name /I& ". /---p-OIL 33 7'� - 2 5 NC Well Contractor Certification Number ..is.,OUTE]kc-'ASING'(for.ditilti-thiiawiiii) FiL3N9*@f_a V.i Barnette Well Drilling, Inc. FROM I To__L____[-DIAMETER AMCKMSS MATERIAL Company Name I&JNNERft. ft I '<P' I-.�- 1-5h-R 211 rvc 'dthe6nzI-cI&e$i0'6p)., - C-ASING OR�TUBINr,:(j e 2.Well Construction Permit#: L 3 FROM- ITo DIAMETER I THICKNESS I MATERIAL List all applicable well construction permits(i.e.UIC,County,State, Variance,etc.) ft. It. in. 3.Well Use(check well use): ft. ft in. Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL DAgricultural OMunicipal/Public ft. ft. in. DGeothermal(Heating/Cooling Supply) XRicrsidential Water Supply(single) ft. ft. 01ndustrial/Commercial EIResidential Water Supply(shared) 18 ..,'GROU4T , DIrrigation OWells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 6 ft- Zed ft- Cement/Sand Poured E]Monitoring DRecovery ft. fL Injection Well: ft. ft. •Aquifer Recharge OGroundwater Remediation 19;;SANtl/GRAVEL •Aquifer Storage and Recovery OSalinity Barrier FROM TO MATERIAL EMPLACEMENTMETH D DAquifer Test OStormwater Drainage ft. ft. DExperimental Technology OSubsidence Control ft. ft. OGeothermal(Closed Loop) OTracer 20.-DR]ILL71N G'10r"(a DGeothermal(Heating/Cooling Return) 00ther(explain under#21 Remarks) FROM ft. I TO 1� ft. DESCRIPTION(color,hardness,soil/rock type�grain size,etc. J1 4.Date Well(s)Completed-2-/, a2- well ID# Z 3 ft. Z ft. C/A 5a.Well Location: on "L IL Facility/Owner Name Facility ID4(if applicable) P.T-ft. yac�- L r'&3i�n�vfG ft. ft. Physical Address,City,and Zip ft. It. Ae S y e165 11-.zREMAPUK&- % v 2 County Parcel Identification No.(PIN) APR 18 2077 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certification: ,P 6-I-Pb X,4 N W WU '4 r 6.Is(are)the well(s): 94're'rmanent or OTemporary Signature of Certified Well Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: OYes or NN15" 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the:twell owner. repair under#21 remarks section or on the bock of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 2-0 ft*) Submit this GW-I within 30 days of well completion per the following; For multiple wells list all depths if different(example-3@200'and 2@100� 24a. For All Wells: Original form to.Division of Water Resources (DWR), 10.Static water level below top of casing: 2 J (ft) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above casing,use 11.Borehole diameter: g (in.) 24b.For Injection Wells:Copy,to DWR,Underground Injection Control(IUC) Program, 1636 MSC,Raleigh,NC 27699-1636 12.Well construction method:Air Rotary 24c.For Water Supply and Open-Loop Geothermal Return Welts:Copy to the (Le.auger,rotary,cable,direct push,etc.) county environmental health dep"ent of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR CCPCUA Permit Program, 1611 MSC,Raleigh, NC 27699-1611 13a.Yield(gpm) Method of test: d�lcy olle_� 13b.Disinfection type: HTH Amount: 2 Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018