Loading...
HomeMy WebLinkAboutNCC190202_NOT Closeout Documents_20220427Permit Number: 2018-00002557 TOWN of WAKE FOREST ENGINEERING Certificate of Completion Erosion and Sediment Control Town of Wake Forest Engineering Department 301 South Brooks Street Wake Forest, NC 27587 Phone: (919) 435-9443 Inspector: Contractor: Owner: Lamar Minte Joseph Lassiter 9/15/2021 Subdivision/Site Name: Plan Approval Date: Date of Final Inspecti on/walk thm: Tryon Phases 13 and 17 5/1/2018 9/15/2021 Location: Financial Responsible Party: Contactor Phone Number: 0 Copper Beech Ln Tryon Investments Partners, LLC (919) 971-9643 Plan Specifications Local Ordinance Met: Temporary Controls Removed: Permanent Controls Installed and Met: Operational: Yes Yes Yes Yes Additional Comments: The undersigned (inspector) hereby accepts the installation of permanent and removal of temporary erosion and sediment control devices (per plan and specification) on behalf of the Town of Wake Forest. The owner is responsible for maintaining these devices, and in no way holds the Town responsible for cleanout or repair.