Loading...
HomeMy WebLinkAboutWQ0043283_More Information (Received)_20220418 (2)DocuSign Envelope ID: 6FA1 F0D6-AE11-4C36-96DA-8A52F65910A1 DER Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Trinity Project Name for which flow is being requested: Covington Ridge Phase 1 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Treated by Thomasville WWTP - separate FTSE from Thomasville will be submitted along with this form b. WWTP Facility Permit #: c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 6.0 0.01008 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station (Name or Number) Steeplegate Pump Station Permit No. (A) Design Average Approx. Obligated, Daily Current Not Yet Firm Flow** Avg. Daily Tributary Capacity, * (Firm / p f), Flow, Daily Flow, MGD MGD MGD MGD 0.72 0.288 0.202 0.116 (B) (C) (D)=(B+C) (E)=(A-D) Total Current Flow Plus Obligated Flow Available Capacity*** 0.318 -0.030 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Stone Gables (Trinity Sewer) Page 1 of 6 FTSE 10-18 DocuSign Envelope ID: 6FA1 F0D6-AE11-4C36-96DA-8A52F65910A1 Downstream Permit Number: III. Certification Statement: I Stevie L Cox certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. cS DocuSigned by: fwut'I 3AF2DA52225047A... Signing Official Signature Date Title of Signing Official Page 2 of 6 FTSE 10-18 DocuSign Envelope ID: 6FA1 F0D6-AE11-4C36-96DA-8A52F65910A1 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 40.3 % and -0.030 MGD of the Available Capacity (E) in Pump Station Steeplegate PS ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.040 MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely Steeplegate PS capacity expansion is in design or under construction with planned completion in by June 2024 ; and/or d. The following applies: The overall project based obligations not built result in -0.030 mgd below the caculated available flow for the Steeplegate PS, includes flows from homes that will be built out over the next 4 to 5 years that will average only 0.040 mgd per year over the period with 0.036 mgd in 2022 During the same period homes will be constructed reducing the obligated flow since only 5000 gal per month adf (or only 168 gpd) vs the oblicated calculation base on 360 gal per day per bedroom See attched schedule for the expansion of Steepegate PS to a firm design capacity of 1181 gpm or up to 1.7 mgd rate Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 10-18