HomeMy WebLinkAbout20140420 Ver 1_401 Application_20140414STROUD ENGINEERING, P.A.
Hestron Plaza Two
151 -A Hwy. 24
MOREHEAD CITY, NC 28557
DATE Jr NO
252) 247 -747 ATTENTION 1 ��
1i k � 7 F
TO, ors V - � M
jk
;
s ,
WE ARE SENDING YOU 4 Attached ❑ Under separate cover via the followtn- items
• Shop drawings ❑ Prints ❑ Plans
• Copy of letter ❑ Change order ❑
I
❑ Samples
9
❑ Specifications
THESE ARE TRANSMITTED as checked below
i For approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑
❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
d :
9 v fF i
DENR"r
i���ya 'y yq6
V9q}1 Jeri "r
COPY TO
SIGNED
If enclosures are not as noted, kindly notify us at once.
1
C4 I �-1
1'� — Y �i 6 t
�- �'u 1
11
�ji ` 1
IU w i� `u D•t o
�_.J �1 r- �A S
2�9 0
THESE ARE TRANSMITTED as checked below
i For approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑
❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
d :
9 v fF i
DENR"r
i���ya 'y yq6
V9q}1 Jeri "r
COPY TO
SIGNED
If enclosures are not as noted, kindly notify us at once.
1
W A
T �9QG
T
1 >r-i
2 0 1 4 0 4 2 0
o�OF
�0 PAPAM Office Use Only
M Corps action ID no
DWQ project no
Form Version 1 4 January 2009
Page 1 of 10
PCN Form — Version 14 January 2009
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
la
Type(s) of approval sought from the Corps
❑ Section 404 Permit ❑ Section 10 Permit
1 b Specify Nationwide Permit (NWP) number N/A or General Permit (GP) number N/A
1c
Has the NWP or GP number been verified by the Corps?
❑ Yes ❑ No
1 d
Type(s) of approval sought from the DWQ (check all that apply)
❑ 401 Water Quality Certification — Regular X❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification
❑ Yes XN No
For the record only for Corps Permit
❑ Yes ❑ No
1f
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program
❑ Yes NX No
1g
Is the project located in any of NC's twenty coastal counties If yes, answer 1h
below
Yes ❑ No
1 h
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2.
Project Information
2a
Name of project
Anna Wink Mine #2
2b
County
Carteret
2c
Nearest municipality / town
Newport
2d
Subdivision name
N/A
2e
NCDOT only, T I P or state project no
N/A
3.
Owner Information
3a
Name(s) on Recorded Deed
Larry Styron --
3b
Deed Book and Page No
913 -399
3c
Responsible Party (for LLC if
applicable)
N/A
3d
Street address
PO Box 1599 [A
3e
City, state, zip
Newport, NC 28570 - �� §;auAi eTY
3f
Telephone no
(252) 422 - 8404" _� w
3g
Fax no
3h
Email address
Page 1 of 10
PCN Form — Version 14 January 2009
4.
Applicant Information (if different from owner)
4a
Applicant is
❑ Agent ❑ Other, specify
4b
Name
4c
Business name
(if applicable)
4d
Street address
4e
City, state, zip
4f
Telephone no
4g
Fax no
4h
Email address
5.
Agent/Consultant Information (if applicable)
5a
Name
Andy Munday
5b
Business name
(if applicable)
Stroud Engineering, PA
5c
Street address
151A HWY 24, Hestron Plaza Two
5d
City, state, zip
Morehead City, NC 28557
5e
Telephone no
(252) 247 -7479
5f
Fax no
(252) 247 -4098
5g
Email address
amunday @stroudengineer corn
Page 2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1a
Property Identification no (tax PIN or parcel ID)
PIN 632803022610000
1b
Site coordinates (In decimal degrees)
Latitude N 3 - y-i -py Longitude \(,/ -4l9 - 5t9 - ()$
1 c
Property size
2727 acres
2.
Surface Waters
2a
Name of nearest body of water to proposed project
Southwest Prong, Newport River
2b
Water Quality Classification of nearest receiving water
Class C
2c
River basin
White Oak Basin
3.
Project Description
3a
This
Describe the existing conditions on the site and the general land use In the vicinity of the project at the time of this
application
area is currently farmland
3b
List the total estimated acreage of all existing wetlands on the property 0 4
3c
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0
3d Explain the purpose of the proposed project
Construct a sand mining operation approximately 10 acres in size
3e Describe the overall project In detail, including the type of equipment to be used
Equipment used will include track hoe, back hoe, dump truck and dewatering pump
4.
Jurisdictional Determinations
4a
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
ro ect includin all rlor hases In the ast?
❑X Yes ❑ No ❑ Unknown
Comments Wetlands map has been sent to Christy Wicker
4b
If the Corps made the jurisdictional determination, what type
of determination was made?
x❑ Preliminary ❑ Final
4c
If yes, who delineated the jurisdictional areas?
Name (If known) Christy Wicker
Agency /Consultant Company
Other Land Management Group, Inc
4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
A preliminary survey of flagged wetlands is attached
5.
Project History
5a
Have permits or certifications been requested or obtained for
this project (Including all prior phases) in the past?
X❑ Yes ❑ No ❑ Unknown
5b If yes, explain in detail according to "help file" Instructions
Mining Permit Application and Stormwater Permit
6.
Future Project Plans
6a
Is this a phased project?
❑ Yes ❑X No
6b
If yes, explain
Page 3 of 10
PCN Form - Version 1 4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
la Which sections were completed below for your project (check all that apply)
X❑ Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a
Wetland impact
number
Permanent (P) or
Temporary T
2b
Type of impact
2c
Type of wetland
2d
Forested
2e
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f
Area of
impact
(acres)
W1 P
Fill
Small -Basin Wetland
No
DWQ
001
W2 P
Fill
Small -Basin Wetland
No
DWQ
002
W3 P
Fill
Small -Basin Wetland
No
DWQ
01
W4 P
Fill
Small -Basin Wetland
No
DWQ
006
W5 P
Fill
Small -Basin Wetland
No
DWQ
008
W6 -
Choose one
Choose one
Yes /No
2g Total Wetland Impacts:
027
2h Comments
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted
3a
Stream impact
number
Permanent (P) or
Temporary (T)
3b
Type of impact
3c
Stream name
3d
Perennial (PER) or
intermittent (INT)?
3e
Type of
jurisdiction
3f
Average
stream
width
(feet)
3g
Impact
length
(linear
feet)
S1
Choose one
-
S2
Choose one
-
S3
Choose one
-
S4 -
Choose one
-
S5
Choose one
-
S6 -
Choose one
3h Total stream and tributary impacts
31 Comments
Page 4 of 10
PCN Form — Version 1 4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then indivi ually list all open water impacts below
4a
Open water
impact number
Permanent (P) or
Temporary T
4b
Name of waterbody
(if applicable)
4c
Type of impact
4d
Waterbody
type
4e
Area of impact (acres)
01
Choose one
Choose
O2
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f Total open water impacts
4g Comments
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below
5a
Pond ID number
5b
Proposed use or
purpose of pond
5c
Wetland Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f Total:
5g Comments
5h Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
5j Size of pond watershed (acres)
5k Method of construction
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If any impacts require mite ation, then vou MUST fill out Section D of this form
6a. Project is in which protected basin?
❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other
6b
Buffer Impact
number—
Permanent (P) or
Temporary T
6c
Reason for impact
6d
Stream name
6e
Buffer
mitigation
required?
6f
Zone 1
impact
(square
feet )
6g
Zone 2
impact
(square
feet
B1
Yes /No
B2
Yes /No
B3 -
Yes /No
B4 -
Yes /No
135 -
Yes /No
136 -
Yes /No
6h Total Buffer Impacts:
61 Comments
Page 5 of 10
D.
Impact Justification and Mitigation
1.
Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed Impacts in designing project
A 100 ft plus buffer will be maintained around the wetlands until such time permission is granted to fill these wetlands The Skaggs Lateral Effect came
to 78 6 feet so a 100 ft plus buffer would be adequate The 0 13 AC Jurisdictional wetland will maintain a 100 ft plus buffer The total impacted wetland
area comes to 0 27 Acres total
lb Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques
Impacts will be minimized through maintaining buffers
2.
Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a
Does the project require Compensatory Mitigation for
Impacts to Waters of the U S or Waters of the State?
❑ Yes ❑x No
2b
If yes, mitigation Is required by (check all that apply)
❑ DWQ ❑ Corps
2c
If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3.
Complete if Using a Mitigation Bank
3a
Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type Choose one
Type Choose one
Type Choose one
Quantity
Quantity
Quantity
3c Comments
4.
Complete if Making a Payment to In -lieu Fee Program
4a Approval letter from In -lieu fee program Is attached
❑ Yes
4b
Stream mitigation requested
linear feet
4c
If using stream mitigation, stream temperature
Choose one
4d
Buffer mitigation requested (DWQ only)
square feet
4e
Riparian wetland mitigation requested
acres
4f
Non - riparian wetland mitigation requested
acres
4g
Coastal (tidal) wetland mitigation requested
acres
4h
Comments
5.
Complete if Using a Permittee Responsible Mitigation Plan
5a
If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 1 4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes ❑ No
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required:
6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)
6h Comments
Page 7 of 10
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
la
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes X❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b
If yes, then is a diffuse flow plan included? If no, explain why
❑ Yes ❑ No
2.
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
2b
Does this project require a Stormwater Management Plan?
0 Yes ❑ No
2c
If this project DOES NOT require a Stormwater Management Plan, explain why
2d
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan
Stormwater plan employs bank stabilization, seeding, sediment trap with vegetated filter and site inspections
2e
Who will be responsible for the review of the Stormwater Management Plan?
NCDENR
3.
Certified Local Government Stormwater Review
3a
In which local government's jurisdiction is this project?
❑ Phase II
❑ NSW
3b
Which of the following locally - implemented stormwater management programs
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c
Has the approved Stormwater Management Plan with proof of approval been
El Yes X❑ No
attached?
4.
DWQ Stormwater Program Review
EgCoastal counties
❑HQW
4a
Which of the following state - implemented stormwater management programs apply
❑ORW
(check all that apply)
❑Session Law 2006 -246
❑Other
4b
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑X No
attached?
5.
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
X❑ Yes ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1 4 January 2009
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
la
Does the project Involve an expenditure of public (federal /state /local) funds or the
❑ Yes
X❑ No
use of public (federal /state) land?
lb
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes
❑ No
letter )
Comments
2.
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
El Yes
❑X No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after - the -fact permit application?
El Yes
❑X No
2c
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)
3.
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
El Yes
No
additional development, which could impact nearby downstream water quality?
3b
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered "no," provide a short narrative description
There will be no impacts since there is no development
4.
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
There will be no wastewater generated
Page 9 of 10
PCN Form — Version 1 4 January 2009
6. Endangered Species and Designated Critical Habitat (Corps Requirement) ,
5a Will this project occur in or near an area with federally protected species or
❑ Yes ❑X No
habitat?
5b Have you checked with the USFWS concerning Endangered Species Act
❑ Yes X❑ No
impacts?
5c If yes, indicate the USFWS Field Office you have contacted
-
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Environmental Conservation Online System
6. Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑X No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Environmental Conservation Online System
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes X❑ No
status (e g , National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
NC Office of State Archeology
8. Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA- designated 100 -year floodplain?
❑ Yes X❑ No
8b If yes, explain how project meets FEMA requirements
8c What source(s) did you use to make the floodplain determination?
Flood Map #3720632800J
Larry Styron
April 16, 2014
Applicant/Agent's Printed Name
Date
Applic Agent's Signature
(Agent's signature is valid only if an authorization
letter from the applicant is provided
Page 10 of 10
Lateral—Effect—Summary
- -- Lateral Effect Program summary- -
Application of Skaggs Method
Copyright 2006 -2013. Brian D Phillips, R wayne Skaggs, G M chescheir
North Carolina State University Dept of Biological & Agricultural
Engineering
version: 2.7.1.0
Project Run Date and Time: 4/11/2014 11:23:02 AM
Output Filename:
M:\ PUBLIC\ MASTER \DRAWINGS \700'5\ 756 \PM756 \PM756 - 9002 \LateralEffect \outputs \Lateral_
Effect_summary.txt
Project Information
Project : Anna wink Mine #2
User: Andy Munday
Company / Agency: Stroud Engineering
Department: Engineering
Project Location: Newport NC
Project coordinates:
Soil ID: Norfolk loamy fine sand
Notes:
Site Parameters
------------------------------------------------------------ - - - - --
state: North—Carolina
County: Carteret
Surface Storage: 2 in (5.0 cm)
Ditch Depth or Depth to water surface: 6 ft
Depth to Restrictive Layer: 12 ft
Drainable Porosity: 0.11
Hydroperiod: 14 days
User defined T25 or Built In T25: DEFAULT
T25 value: 4.2 days
User defined Conductivity or soil survey Conductivity: USER
weighted Hydraulic Conductivity: 2.0000 in /hr
Hydraulic
Conductivity
Bottom Depth in
Layer
1
144
Layer
2
0
Layer
3
0
Layer
4
0
Layer
5
0
Layer
6
0
Layer
7
0
Layer
8
0
Data by Layer
Conductivity in /hr
2.0
0
0
0
0
0
0
0
----------------------------------------------
Lateral Effect: 78.6 ft
---------------------------------------- - - - - --
Page 1