HomeMy WebLinkAbout20140311 Ver 1_More Info Received_20140428Homewood, Sue
From: Chris Brown < Chris .Brown @Mcgillengineers.Com>
Sent: Monday, April 28, 2014 1:15 PM
To: Homewood, Sue; Bailey, David E SAW
Cc: Doug Chapman
Subject: Morinaga Plan
Attachments: 70817_C -200 GRADING EC PLAN.pdf
Sue,
Here is Morinaga's grading /erosion control plan showing the buffers.
David,
We are currently making the changes you have asked for on the Plat map and will forward a copy of that for review as
soon as we get it.
Thanks,
Christine
Christine D. Brown, CPSWQ, CPESC
Engineering Technician III
1240 191h Street, Lane NW I Hickory, NC 28601
Phone: 828.328.2024 1 Fax: 828.328.3870
Email: chris.brown @mcgillengineers.com I Website: www.mcgillengineers.com
1
z
n
LU
Z
rr
c
c
00
c
N
0
0
n
L
7
rr
1
cis
0
-----------
-- - ------------
SEE GRADING DETAIL
SHEET C-706
-----------
C)
---------- - --- -----------
a . . ..... ... ;,7
- - -------------------
................
low
4
e
5
- --------------
.... ......
SEE GRADING DETAIL W ------------------
... . . ........ I—— z 11 -1, "1 , I , s
- - - - - - - ------- -
SHEET C-706 4
- --------------
-------------- see so- 00
1 )", _6
- ------------------ I t
675-
T ------- -----
. .... ...... )&T -NCD T ROAD WIDTH 675
80' FULL EROSION CONTROL & GRADING NOTES
711
, / - --- `,11,� \ ", I , \ I", \\ I / I i" e
. ........... , 'I', - __ I'll
------ - - ------
-OF-WAY �_777
RIGHT
A
_._<77
1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL COMPLY TO THE LATEST EDITION OF THE
p
b I ---------------
NCDENR NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL,
. ........ .
4- "-66"
t
2w,"
.. ........
_4
PA
5
. .. . .. 665" - - - - - - -- 61
rov 0771,
V "1 75 2. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCEMENT OF
ANY LAND DISTURBANCE.
b,0
50,00' SETBACK
6,
I PV f
. ..... I /eq-
65 ab 3. CLEARING AND GRUBBING IS REQUIRED ON ALL AREAS WHERE GRADING, EXCAVATION AND FILLING WILL
e BE DONE, GRUB TOP 6 APPROXIMATELY, TO REMOVE ORGANIC MATERIAL AND DISPOSE AT AN
w
J FG 672.54
is(
FG 671.94 APPROVED LOCATION,
3
�;e
. ..... 6� 66 FG 673.25
66b,
.... .. .... .
0
e 4. ALL EARTHWORK OPERATION SHALL COMPLY WITH OSHA CONSTRUCTION STANDARDS.
65,
........... ij " , I � � 1 - \ 'w", A / ee," iz,,
�0' s,
. .. . ................ ---- bb
;e- IN , - -
r
........... . ....
j' �4, 5. FILL MATERIAL SHALL CONSIST OF CLEAN SOIL, FREE OF ORGANIC OR DELETERIOUS MATERIALS, ROCKS
7
OR BROKEN PIECES OF CONCRETE LARGER THAN THREE INCHES IN SIZE, OR ANY OTHER FOREIGN
r i �,,
665 FG 673.25
FG-9 OBJECTS THAT COULD IMPEDE THE COMPACTION RESULTS.
672,83
41
s Vt
. ............ ...... _G 659,00 q� e,
FG 673 25,
7 el l'co 6. FILL MATERIALS SHALL BE SPREAD EVENLY IN HORIZONTAL LAYERS OF NOT MORE THAN 8 INCHES IN
A FG
I i , LOOSE LIFTS OVER THE FULL WIDTH OF FILL AND COMPACTED TO AT LEAST 95% MAXIMUM DRY DENSITY
F,
S ER bA�IN-#] 0 r, '' 7' , , '' �r I -
"A / /, / i , 1\ 673 39"
664
KIMM
66 :7,
668.00 Lo
FG 672.95 BY STANDARD PROCTOR COMPACTION TEST, ASTM D698.
668 ;;;*000
73 FG 672.80
0.
0 -��FG 672.59 ..... . ...
6 FG 6
. ... ... .... . I
-1 FG 672.47, FG 67198 1
673
0V
FG 6172,44 1
s,
e
"';�4 77� 6
�FG 0 F6 673.00
7. MAXIMUM CUT OR FILL SLOPES SHALL BE 2H:lV. SLOPES ARE DRAWN AT 3:1 ON THIS PLAN.
FG 672.00'
FG/TC 6 7 3.10 �j
'�1(G 673.25
'iss 673.5'
N P
f
8, PROVIDE EROSION CONTROL MATTING ON ALL SLOPES 3:1 AND GREATER.
,;,FG 672.87,;
e
6bb FG 672.00 e; re, 00111,,"isill-s
F
s WIWI
IFG V//../U
sss� 672,79,5
a, _FG/TC 673.65 FG 673.12
FG 673.33r',
9. STAKE STRAW WATTLES ON ALL SLOPES STEEPER THAN 5:1 AND TALLER THAN 3' MEASURED
e" e e VERTICALLY FROM TOE TO TOP OF SLOPE. STRAW WATTLES SHALL BE INSTALLED APPROXIMATELY LEVEL
e FG 672.00
IP
9'FG/TC 673.86,\ I A
'FG 668.00 FG 672.80
s 667,- FG 672.94 /` , 0 ALONG THE SLOPE FACE AND SECURED EVERY 4' WITH 18" LONG WOOD STAKES MINIMUM, WATTLES
5"'4400 FG 672.50
00 FG 673.25
IFG 667.40 1 \ I
SHALL BE INSTALLED AND TRENCHED IN PLACE AS TO NOT ALLOW RUNOFF TO ESCAPE UNDERNEATH. A
""i, i A", F� 673.02
s111 1`11 Ow MINIMUM OF TWO ROWS ARE REQUIRED TO BE INSTALLED AT TOP AND TOE OF SLOPE. INSTALL
1 `FG 67352
FG 6�2 86
00
. .........
b FG 671.99,"",- ee I (
is MOM V
F
s G 658.01
A
FG 673 25 ADDITIONAL ROWS OF STRAW WATTLES AS NEEDED BASED ON SITE CONDITIONS.
FG/TC 67352
A_
FG 673.90�,'
FG/TC 673.60 _673
6bgf� I s e\"�11 """" I �ON I
111_� I "" , -, "I, FG 673.60 10, GRADE TO PROVIDE POSITIVE DRAINAGE AWAY FROM BUILDINGS.
w
sow..........
FG 673.2b ------
e FG 673,68
5 67b
F
G 670.34
FG/TC 673.75 11. SEE GEOTECHNICAL ENGINEER FOR RECOMMENDATIONS CONCERNING PROPER PLACEMENT AND
FG 671.21 �U 1573.68
COMPACTION OF STRUCTURAL FILL.
G 673.25
jX') is
71147,J
FG 6
'row. "-w
0,
FG 673.87,
12. STABILIZE GROUND PER TABLE THIS SHEET WITH MULCH, WHEAT STRAW, OR GRASS.
GRADING AND
EROSION CONTROL LEGEND
TOTAL SITE
SKIMMER POND COIR BAFFLE
237700
COIR WATTLE CHECK DAM
- GRUBBING
GRAVEL CONSTRUCTION ENTRANCE
cu yards
INLET PROTECTION
(8�OOOSF X 4.33') = 11283
RIPRAP
+ OVEREX S. B10-RET
SLOPE DRAIN
cu yards
SEDIMENT FENCE (WIRE BACKED)
197567
SKIMMER
TOTAL FILL
STRAW WATTLE ON SLOPE
cu yards
TEMPORARY DIVERSION (BERM/DITCH,,
EG
EXISTING GRADE
FG
FINISH GRADE
TIC
TOP OF CURB
FF
FINISH FLOOR
-675-
DESIGN CONTOUR
0 0
TREE PROTECTION FENCING
o -a--�
SEDIMENT FENCE
CONSTRUCTION FENCE
STRAW WATTLE
GRAVEL CONSTRUCTION ENTRANCE
�7 r"i, �e
RIP RAP
ro uti-ji
CID xf
"J
13. CONTRACTOR SHALL NOT TRACK OUT SOIL FROM SITE. KEEP VEHICLES LEAVING THE SITE ON CLEAN,
G 674.00
..... ..... . _F
1,11,1111-11,111, . ..... 673.8�
b 1 FG 673.65 PAVED SURFACES. WASH TIRES IN AN APPROVED MANNER IF NEEDED BEFORE LEAVING THE SITE.
672- . .....
Q,
FG 673.90
'DETA
SEE GRADING IL
FG 674.00 14. WHEN THE DEVELOPED SITE HAS BEEN PROPERLY STABILIZED, ALL THE TEMPORARY SEDIMENT AND
SHEET C-201
EROSION CONTROL MEASURES WILL BE REMOVED, THE DISTURBED AREA GRADED TO BLEND WITH THE
73\
6
SURROUNDING AREA, AND VEGETATED.
WORK. ....... . .
XI
LIMITS
15. EXISTING SITE IS AGRICULTURAL, STABILIZE AND PERMANENTLY SEED ALL EXPOSED AREAS ON SITE
WITH APPROVED SEED MIXES PER C202.
j1
IP
. . .. .. ... ... ....
FG 673.50
I M ATE EXTENT MAINTENANCE PLAN
EA
LAYDOWN/ STAGING AR,
Je APPR,QX OF CONSTRUCTION
FG 673 2
.52
.. . ... . ...
1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION
JFG 673.901.1",,)
e FOLLOWING EVERY RUN-OFF PRODUCING RAINFALL BUT NOT LESS THAN ONCE EVERY WEEK,
675
A. . ......
FG 675.15 SF
. .. ...... ... ell
e 2. SKIMMER BASIN WILL BE CLEANED OUT WHEN THE LEVEL OF SEDIMENT REACHES 2.0 FT BELOW THE TOP
it
FG 673.87
G 675.28 1 i� I ;
PROPOSED BUILDING Is,, FG 673.90 OF THE RISER. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS
... . .......
is 1 FG 674.00
s
PROPERLY.
TF"`- 674.0
�s`
3. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES 0.5 FEET DEEP
H AT
ss
7
FG LO THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER.
673.90
Are
FG 673 30
4. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY AND MULCHED ACCORDING TO
FG 672.8 er el SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER.
N
e f" d
01
(D FG 673.3
Tj f
s,
��,,FG 673.90
FG 6 5.28 s e
e, �\FG 674.00
el,
j
673.60 e
IP G
J
FG 673 90
FG 675.28 FG 673.60
...... ... .. .
FG 67
LO
3.50
is i/ s A
Oe
i st
FG 673.60
FG "6"72.20
FG 673.55/ i F G 673.60 FG 672.80" 17
FG 673.90
f r
G 0
-'sc F 674.0
FG 674.00
F
FG 673 00 TW 674.50 G 673.50 FG 673.90':"
�1 FG 670.00 FIG 674.00
TW 6,74,50 0/ FG 669.75
M
FG 673.90
J
I P FG 674.00
FG 673.90
FG 672.20 . .... .
FG 673.50
(0
'N . ...... �APPROXIMATE,,EXTENT OF CON'STRUCTION
FG 674.00
FG 67285
eci '1
FG 673.90 MATERIAL STOCK,,kLES
01
FG �74.00
FG 673.00 -
Ji
.673 670
1 FG 674,15
FG 67�,00 FG 672.50
_gy
CUT/FILL ESTIMATE
TOTAL SITE
TOTAL CUT
237700
CU yards
- GRUBBING
(366,OOOSF X 6") = -67778
cu yards
+ OVEREX N. 1310-RET
(8�OOOSF X 4.33') = 11283
CU yards
+ OVEREX S. B10-RET
(81490SF X 4.331) = 19362
cu yards
ADJUSTED CUT
197567
cu yards
TOTAL FILL
97354
cu yards
- GRAVELICONCAC(366,000SF
X 1') = -137556
CU yards
ADJUSTED FILL
-47 202
cu yards
NET
:3 L
CUT:
15,365
cu yaras
L J X
FG 673.80 NOTES:
FG 672.43
F�'673.8
1. CUT AND FILL ESTIMATES ARE ENGINEER ESTIMATES ONLY. ACTUAL QUANTITIES
FG 672.60
66
RR WILL VARY DEPENDING ON FINAL GRADING IN THE FIELD DURING CONSTRUCTION.
WORK LIMITS
CONTRACTOR RESPONSIBLE FOR PREPARING/ESTIMATING CONSTRUCTION
7 CLASS,/B
0 3fx6pl; 1
EARTHWORK CALCULATIONS FOR BIDDING AND CONSTRUCTION ACTIVITY.
I P I P
. ... ......
673,
. . .... . . . .
FG 672.74
EROSION CONTROL NARRATIVE
D
EXIS
7
TING CONDITIONS:
THE EXISTING SITE WAS MOST RECENTLY AGRICULTURAL LAND PRODUCING SOYBEANS WITH MOST SLOPES
.. ... . . .
-10%. PER A SITE VISIT IN JULY OF 2013, THE LAND WAS STABILIZED WITH
RANGING FROM 1%
TD URE GRASS. THE FAR SOUTHERN PORTION OF THE PROPERTY HAS HEAVY TREE COVER
S
70
FG 667.7
ei WITH SLOPES EXCEEDING 20%. GEOTECHNICAL INVESTIGATIONS BY FROEHLING & ROBERTSON, INC FOUND
6
(0 4 FG 669.20
z THE EXISTING SOILS ARE HIGH IN SILTS AND CLAYS AND HAVE VERY LOW INFILTRATION RATES, THE
A
FUTURE BUILDING PAD:
x r SITE HAS A RIDGE LINE IN THE NORTHERN HALF OF THE PROPERTY CREATING EXISTING DISCHARGE
POINTS TO THE NORTH AND SOUTH.
LEVATION 03.0
PLACE EXCESS'FILL UP TO/E
'CE WITH GEOTECHNICAL
Ito ?sI ACCORDAN
UENCE:
2ING
ENGINEER RECOMMENDATION, INCL
PROPERLY STRIPPING AREA P�IdR TO FILL
1. OBTAIN ALL REQUIRED PERMITS
PLACEMENT, BENCHING AND M'AXIMUM
2. HOLD PRE-CONSTRUCTION MEETING ON SITE
FINfSHED SLOPES.
564 ::6
00
F 3. FLAG WORK LIMITS
G 673.04
is0000 SF
FG 673.,04' s4. COORDINATE WITH COUNTY FOR CONSTRUCTION ENTRANCE CONSTRUCTION AND INSTALL
HIGH VISIBILITY FENCING, loop
PERIMETER CONTROL AND MAINTAIN THROUGHOUT CONSTRUCTION (TEMPORARY DIVERSIONS
FG 674.001
JU ft x
FG 674.00 _E PORARY "" SKIMMER BASIN
PROTECT HISTORIC CHURCH BTM=662.0
PROPERTY FROM DAMAGE . . ...
.. ........ ........
SEDIMENT FENCE)
RIK LIM I TS
5. INSTALL SKIMMER SEDIMENT BASINS INCLUDING BANK OVERFLOW, SKIMMER, 3 BAFFLES,
10,700 M I N
PERM AN ENTLY, SEED
�),4 61 "CLASS T, 0 p AREA
SL=103
OUTLET STRUCTURE, AND OUTFALL (WILL BECOME STORM DETENTION PONDS). ROUGHEN,
PPE . . ........ . ..... TOP BERM,;,:6 WIDE .. . ..... ...
x X OF ,S SHOWN AS 3:1
. ........... . FUTURE MAImum, 2:1 SLOPE
X SEED AND MULCH SLOPES.
WWTP 6. INSTALL SLOPE DRAINS INCLUDING RIP RAP
TF -715T4 0 . . ... ..... .. . . 7. GRUB AND ROUGH GRADE SITE
8. SPRINKLE EXPOSED AREAS FOR DUST CONTROL IF NEEDED
or,
s9. CONSTRUCT GRAVEL CONSTRUCTION ROADS WHERE PERMANENT ROADS/ PARKING ARE
CE TD
. .. .......
77 SHOWN
. ...... .. .
671
is10. INSTALL EROSION CONTROL MATTING ON SLOPES STEEPER THAN 3:1 IF FINAL GRADE IS
7�, S
6 SF
6 ACHIEVED AND STABILIZE WITH SEED AND MULCH AND INSTALL STRAW WATTLES ON SLOPES.
Or 77:,,7:66 . . ... is11. INSTALL ADDITIONAL TEMPORARY DIVERSIONS AND SEDIMENT FENCE IN SITE INTERIOR As
E
. ..... NEEDED AND DISCHARGE TO FIRST CELL OF SKIMMER BASINS. INSTALL TEMPORARY
z
. . .......
TREE PROTECTION 'FENCING. . ... ........ ... ..... ...
DIVERSIONS WITH SLOPE DRAINS ON ALL SLOPES STEEPER THAN 3:1 INCLUDING SOIL STOCK
.. ...... . .
TBACK
.. . ......
12. TEMPORARILY STABILIZE OR PERMANENTLY STABILIZE AREAS IF POSSIBLE PER NOTES A
20.00' SETBACK
PILES,
BOVE
see. ..... AND PERMIT REQUIREMENTS
VV I 13. INSTALL UTILITIES
FG 666.5077�,
. ..............
isRR 48'xs�' 'CLASS,, B!
............. 14. INSTALL ROCK INLET SEDIMENT PROTECTION TRAP ON CATCH BASINS
665 FG 663.50
'SPR�A RADE
USH'
20.00' SET'B� 15. PERFORM FINAL EARTH GRADING
WITH Gs �CK
DER FL
SKIMMER BASIN-#Z�
.... ... ...
S B L W1TH:GEQTEXTIeLE,,i'
xl.'5', CLS
. . . . . . 16. REMOVE SEDIMENT FROM SKIMMER SEDIMENT BASINS AND GRADE STORMWATER DETENTION
666.59
SEE GRADING DETAIL, 3'x25' INED
SHEET C-201
s. . . ... .. . .
PONDS PER PLAN.
17. ROUGHEN REMAINING SLOPES STEEPER THAN 3:1 AND INSTALL EROSION CONTROL M
ATTING
AND STRAW WATTLES.
I TS (LANDSCAPE OR ROCK IMPERVIOUS AREAS)
WORKeLIM
SF
.... . ... . . 18. PERMANENTLY STABILIZE SITE
-RETENTION FACILITIES (PROTECT FROM SEDMI EN TAION -INSTALL BERM
19. CONSTRUCT BIO
AROUND PERIMETER IF CONSTRUCTED IN PARALLEL WITH OTHER GRADING)
FG 666.00' . .....
20, REMOVE ROCK INLET PROTECTION AND REPLACE WITH INSERTED FABRIC PROTECTION
t: I i I / , , I __ ", s� -_ - - "I, " ", "1", 11 ;;O"� 1 11""", 1 1 / , i
1__.�;,,,20,00' SETBACK'
SITE SUMMARY
TOTAL SITE
DISTURBED
% DISTURBED
ADDITIONAL
DISTURBED AREA
AREA (AC)
AREA (AC)
SI TE
IN ROW (AC)
21.00
14.69
70%
0.47 :::]
21. PERFORM PAVING AND CONCRETE WORK
22, REMOVE SKIMMER AND FINALIZE STORMWATER POND OUTLET CONFIGURATION
23, REMOVE EROSION CONTROLS ONCE STABILIZED
24, COORDINATE FINAL INSPECTION, AND ADDRESS ANY PUNCH LIST ITEMS
SITE
4
)3/04/14CITY
COMMENTS SITE
3
)3/04/1
P-BUILDING
2
)2/10/1
IFP-SITE GRADING
1
Di/14/14,PRELIM
CITY REVIEW
#
DATE�
DESC.
\' , 11IM1111
4 CARnt'
SEAL
039432
E
LU 00
(L q 0
Im 0
IN
J N E
< 0 01)
LU qq @) 00
(r Z
LU M 00
LU 0 c
z
z
LU 0) IL
Livermore A&E
JOB NO: 212019.00
InSpec Group
JOB NO: 212CFA04
I
0
z
0
0
LL
0
X
LU
0 <
L
Id
0
44%
o
Z
Q z
_j
5) z Ld
z
0
LLJ Ld
z 2 :E
DRAWING TITLE:
GRADING AND EROSION
CONTROLPLAN
DRAWN BY: JK
CHECKED BY:GN
Uj
LIM
(L
IL
z
3:
0
6
z
w
M�
0
LLI
w
0)
w
It
_j
_j
1
D
0
x
z
z
i
w
w
z
Ld
4
w
w
x
0
0
I
0
0
V)
D
lot It,
N
Lb Lb
r-
M
LO 0
L C 0) ())
41 0 LO Lf)
0
. -
C'n ro
L Q 0 0
:3 L
c 0 LO Lr)
41
L J X
c LL
L
0
00-
InSpec Group
JOB NO: 212CFA04
I
0
z
0
0
LL
0
X
LU
0 <
L
Id
0
44%
o
Z
Q z
_j
5) z Ld
z
0
LLJ Ld
z 2 :E
DRAWING TITLE:
GRADING AND EROSION
CONTROLPLAN
DRAWN BY: JK
CHECKED BY:GN
Uj
LIM
(L
IL
z
3:
0
6
z
w
M�
0
LLI
w
0)
w
It
_j
_j
1
D
0
x
z
z
i
w
w
z
Ld
4
w
w
x
0
0
I