Loading...
HomeMy WebLinkAboutNCC221619_ESC Approval Submitted_20220427COOPER S. RISER WRENN NORTH CAROLINA Environmental Quality March 22, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Harvey Point Defense Testing Activity (HPDTA) Attn: Mr. Michael T. Clark, Director 2835 Harvey Point Road Hertford, NC 27944 RE: Project Name: Harvey Point Runway Repair Project ID: Perqu-2022-007 County. Perquimans City: Hertford Address: Harvey Point Road River Basin: Pasquotank Date Received by LQS: February 25, 2022 Submitted By: Mason & Hanger Plan Type: New Dear Sir, Acres Approved: 9.04 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: -DEPI North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ��✓j' tNasiiington Reglondf UfRce 943 Washington Square MuEI Washington, North Carolina 27864 I. The approved E&SC plan as well as any approved deviation. 2. The NCGOZ permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Sincerely, Samir Dumpor, PE Regional Engineer Land Quality Section cc w/o enc: Michael T. Clark, Harvey Point Defense Testing Activity (email) Kevin DiFazio, Mason & Hanger (email) WaRO Division of Water Resources (email) PROJECT INFORMATION SHEET APPROVAL DATE: March 22, 2022 RESPONSIBLE PARTY: Harvey Point Defense Testing ActivitV PROJECT NAME: Harvey Point Runway Repair COUNTY: Per uimans NO.: Per u-2022-007 OFF -SITE BORROW AND/OR DISPOSAL SITE: START-UP DATE: CONTRACTOR: ON -SITE CONTACT: ON -SITE PHONE NO.: OFFICE PHONE NO.: NO.: COMPLETE & RETURN THIS FORM PRIOR T T RUCTION TO: N.C.D.E.Q. LAND QUALITY SECTION ATTN: James Edwards 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 james.edwards@ncdenr.gov I . The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A- 54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (I5A NCAC 04B .0113). 2. The developer is responsible for obtaining all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval. 3. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance, entering existing drainage systems, impacting an on -site natural watercourse or adjoining property. (NCGS 113A-57) The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute l l 3A -- 57 (4) and 113A -- 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until' establishment of permanent groundcov as required b 'art C lina Adminis t've Title 15A9 Chapter 4B Is .r. Date of Plan Certificate of Coverage Number Regional Engineer