August 24, 2007
DWQ Project # 07-1261
Johnston County
Town of Clayton
c/o Mr. Carl Trautman
McKim & Creed
200 MacKenan Court
Cary, NC 27511
Subject Property: Sam's Creek Interceptor
Ut to Neuse River (Sam's Creek) [030402, 27-(38.5), WSIV, NSW]
Approval of 401 Water Quality Certification, Isolated Wetland General Permit and
Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233)
with .Additional Conditions
Dear Mr. Trautman:
You have our approval, in accordance with the attached conditions and those listed below, to
place fill within or otherwise impact 401inear feet of perennial stream (temporary impact), 100
linear feet of intermittent stream (temporary impact), and 11,995 square feet (ft2) of protected
Zone 1 Neuse River basin riparian buffer and 12;592 square feet (ft2) of protected Zone 2 Neuse
River basin riparian buffer, as described in your application dated July 20, 2007, and received by
the Division of Water Quality (DWQ) on July 20, 2007, with additional information received
from you on June 22, 2007, to construct the proposed waterline extension. After reviewing your
application, we have decided that the impacts are covered by General Water Quality Certification
Number(s) 3625 (GC3625). The Certification(s) allows you to use Nationwide Permit(s) NW 12
when issued by the US Army Corps of Engineers (USAGE). Also, we have determined that this
Isolated Wetland fill (0.007 acres of Isolated Wetland) is covered by the State General Permit for
Impacts to Isolated Wetlands and Isolated Waters (IWGP100000). Finally, this letter shall also
act as your approved Authorization Certificate for impacts to the protected riparian buffers per
15A NCAC 2B .0233. In addition, you should obtain or otherwise comply with any other
required federal, state or local permits before you go ahead with your project including (but not
limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval
to proceed with your proposed impacts or to conduct impacts to waters as depicted in your
application shall expire upon expiration of the 404 or LAMA Permit, and the authorization
to proceed with your proposed impacts to Isolated Wetlands as depicted in your
application and as authorized by this Permit, shall expire upon expiration of IWGP100000
(September 30, 2008) or unless otherwise rescinded by the Director of the Division of
Water Quality.
This approval is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: h~•//h2o enr state nc us/ncwetlands
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Town of Clayton
Page 2 of 4
August 24, 2007
property is sold, the new owner must be given a copy of this Certification and approval letter and
is thereby responsible for complying with all conditions. If total fills for this project (now or in
the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may
be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the
conditions listed in the attached certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and
general conditions of this Certification (or Isolated Wetland Permit) are met. No other
impacts are approved including incidental impacts:
T e of Im act Amount A roved Units Plan Location or Reference
Isolated Wetland 0.007 acres) tem ora PCN a es 4 and 5 of 10
Stream - erennial 40 linear feet tem ora PCN a e 5 of 10
Stream -intermittent 100 linear feet tem ora PCN a e 5 of 10
Buffer -Zone 1 11,995 (s uare ft. PCN a e 8 of 10
Buffer -Zone 2 12,592 (s uare ft. PCN a e 8 of 10
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre-Construction Notification. All
construction activities, including the design, installation, operation, and maintenance of
sediment and erosion control Best Management Practices, shall be performed so that no
violations of state water quality standards, statutes, or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion
control measures• must be such that they equal, or exceed, the requirements specified
in the most recent version of the North Carolina Sediment and Erosion Control
Manual. The devices shall be maintained on all construction sites, borrow sites, and
waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control
measures and stormwater routing and treatment shall be on site at all times.
Town of Clayton
Page 3 of 4
August 24, 2007
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters to the
maximum extent practicable. If placement of sediment and erosion control devices in
wetlands and waters is unavoidable, they shall be removed and the natural grade restored
within six months of the date that the Division of Land Resources has released the project;
5. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within
these boundaries approved under this authorization shall be clearly marked with orange
warning fencing (or similar high visibility material) for the areas that have been approved
to infringe within the buffer, wetland or water prior to any land disturbing activities to
ensure compliance with 15A NCAC 2B .0233 and GC 3625;
6. Diffuse Flow (No Further Review)
All constructed stormwater conveyance outlets shall be directed and maintained as
diffuse flow at non-erosive velocities through the protected stream buffers such that it
will not re-concentrate before discharging into a stream as identified within 15A NCAC
2B .0233 (5). If this is not possible, it may be necessary to provide stormwater facilities
that are considered to remove nitrogen. This may require additional approval from this
Office.
7. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to
return the attached certificate of completion to the 401 Oversight/Express Review
Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center,
Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and/or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by this
Certification, shall expire upon expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved
wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60
days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its
conditions are final and binding unless you ask for a hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the
approved buffer impacts) shall be referred in writing to the Director for a decision. The
Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B.
Town of Clayton
Page 4 of 4
August 24, 2007
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act, the Isolated Wetland Rules (IWP100000) and the Neuse riparian buffer protection
rule as described within 1 SA NCAC 2B .0233. If you have any questions, please telephone
Cyndi Karoly or Ian McMillan at 919-733-1786. ~
S
Teen H. Sullins, Director
CHS/ijm
Enclosures: GC 3625
IWGP 100000
Certificate of Completion
cc: USAGE Raleigh Regulatory Field Office
Lauren Cobb, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Filename: 071261 SamsCreeklnterceptor(Johnston~01_NBR_IW
Certification of Completion
DWQ Project No.:
Applicant:
Project Name:
county:
Date of Issuance of Certification or Authorization:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Agent's Certification
Date:
I, ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, as a duly registered Professional (i.e., .Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
Signature: Registration No. Date