Loading...
HomeMy WebLinkAboutNCC192755_MODIFICATION Supporting Documents_20220421ws/ RLiQ► P I�O EL� FOR 6 N�S �j Xl�_07o p e th/Chaotor �,�Segioo\i ��6"i � itr&>o thi ito,n-�6;e Torsy'th County Ur�fi�dpeve�op.,iei-tOtdir)'a eA p /rite set of� stamped/aRprw�Zf �s'j, . . :quired k��pt�6,n �h cmvgt ctor�,si� br r�feAien�e wfr�n In ta�inR�rOsioh\cbntO�II�aS, Ur S\\\ \ \) \ \ \ \ \ 1 \ \ \ An100 A I I FLOODPLAIN ImhW/o II I/ I/�/// / /]_✓ / FLOODWAYa�/�//l- HA ILT SEMENT \ \ EX TO I< � -_� CREEK - I w w I IIIII IIIII Iill�l% LU x DENUDED AREA (TYP.) \ \ \ \ \ PROP. CLASS 1 RIP -RAP 1 24' L X 1 \ W \8\ PROP. DOUBLEv V V A TEMPORARILY CONVERT INLETS TO II ROW HIGH HAZARD �I SILT FENCE (TYP.) \ \ YARD INLETS AND UTILIZE STONE \ I V I \ DONUT INLET PROTECTION (TYP.) s\ Name Permanent Dltch Discharge 6.41 Channel Slope 0.02 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner II Retardence Class D 2-6 in Vegetation Type Bunch Type Vegetation Density Good 65-79% Soil Type Sandy Loam (GM) II ` DS150 Normal Permissible Calculated Safety Staple Phase Reach discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS150 Straight Unwegetated Underlying Straight Substrate PROP. CLASS BRIP-RAP / / / / s 8� �l \ \ss 10'LX6'WX9"T v= es\ ll ,, \\ -787 - -� =790 _PROP. SILT�ENCE._as EX. DIVERSION _ - - (TYP.) TO BE UTILIZED - - It VAv V�11\\V�\I ( ) BY CONTRACTOR - _ - - -\ PROP. INLET PROTECTION TYP. PROP. TREE PROTECTION i i - - - v (TYP.) - - - - � � - _ _ - � \\ \` I I I I I �l � I ) s � �� \\\� I I I Ii III �1/ 1 O �j / �/ / �- �V A� \ I �o l / Ili HW-55 . o E / �� A / PROP. PERMANENT DITCH A P OP. CL ) / / / V \ I 9 / / / / I 18" INV. IN: 746.00 DCI - 56 DS150 MATTING MIN 1 WATER DITCH TYP. / / / A a / // / o ( ) DA-3 - - v \ ter\ / / / // / / / / s (REFER TO DETAIL THIS SHEET) 3.02 AC J / TEMP DROP INLET B I I RIM:749.04 INV. OUT: 746.49 (DCI-57) >44 loo,) / // l o /, 1 I III I I 742 �/ 85 LF OF 18" RCP @ 1.00 \ \ \ / PROP. CLASS ARIP -RAP 12'LX7'WX9"Ti �v\ ee DRlAl IN/A/ �/ AREA (TYlP/.)I/ IOI.��� � � � R� A-4 DIVERSION (TYP.) 1.92 AC \� DA-C I I I I I I I DA-2 \ \ 1 e \ \ ��®�� l l I I i I I / / / // / / / / // / / 1.93 AC I I I I I I I 3.66 AC / I I \ v \ s3\6 a4\ \ 828 826 \Bszz e1e \IIC IIII I I I iI I I I \\A \ T P SIW FOENCDEOUTBL ORbPPERM/LENT PROPCLASS B RIP-RAkR za 12L X TW X 12 B/ 1DEEP MIN/ YP O-PERMANENT DITCH d' S3$ v v j DEEP MIN / / / I / / 3:1 SIDE SLOPES \ - -- � :1 SIDE SLOPES / / / /�/ / / C125 MATTING MIN I I \ \ \ - - SC150 MATTING MIN PROP. CONTRACTORT B GIN \\\\NN \ CONSTRUCTION ON BRIDGE (TYP.) _ DA-B - _ - - - - v v /\ I I I I I I I // // / / // / / / / I \ \ v,v \V ♦ v \ 5.44AC _ _860 _-,--_-\--\,,\\��� \ \ � \\\ \ t �1, \ \•• ps` \ PROP. CLEAN \ \ ss \ I I \ \ A \ WATER DITCH TYP.) \ 114 ft \ vv��I s < PROS. P�RMANENDEDEP MINN \ I V A O A \ \ 1 ^ >sa \ o A I // // I I I 3:1 SIDE SLOPES SC125BN MATTING MIN \ LO p I I I q\ X \ \ 00 IIII / , �( I� 4D 3 AC PROP. CLASS 2 RIP -RAP `Y \ \ �_ 24'LX1TOiZTO O \ -GONTRRCTOR TO BORES - \ \ \ \ \ \ \ . - ACROSS STREAM NO IMPACT, \\ J I \ �\ �\ \ \\ \ 1 1 i -_�� T� STREAM PP\MITTS � I � IIIII I \ V A vA v vv vA \ I 1 _= , A , I • y � \ v v �vv \ oN � I I / � � I V � DA-1 I \ \ \ l I I I 4.59 AC I / I � \ \ \ \ ♦ \ � 1 � l / 1 � ,� / / / ,// // � v v v � I I I vv \ \ V A v III ; I 1 v \ vv v v� / / // / // / �,�v � \ 1 1 � I IIIIIIII II;IIIIIII I'I II • I, II ,III IIII i ,IIVIIo II I'o11� o �Ilol III I I III II11111 ' o IIIIiIIiI I11 IIIII IIIII III IIII,IIIIIiI o I I I I 6.41 cfs 2.78 ft/s 0.28 ft D 042 1.8 Ibs/ft2 1.09 Ibs/ft2 t.64 STABLE D 6.41 cfs 2.78 ft/s 0.S8 ft 0 042 1.7 Ibs/ft2 0.52 Ibs/ft2 3.28 STABLE D LEGEND SILT FENCE FEMA FLOODWAY ENCROACHMENT ` TEMP. DIVERSION TD-> TD-> / DRAINAGE DIVIDE I DENUDED LIMITS CONSTRUCTION ENTRANCE EX, TREE TO REMAIN W/ TREE BARRICADE IROCK DONUT INLET PROTECTION 0 WIRE AND GRAVEL CONVERTED TO SILT SACK INLET o, PROTECTION DURING ROADWAY CONSTRUCTION ISILT FENCE STONE OUTLET TOTAL MAX DENUDED AREA =n1A 17 CONTROL OF WIND EROSION-- 1 . BARE EARTH AREAS SHALL BE WATERED DURING CONSTRUCTION AS \ 11-_ - '� \ NECESSARY TO MINIMIZE THE TRANSPORT OF FUGITIVE DUST. IT MAY BE �\ NECESSARY TO LIMIT CONSTRUCTION VEHICLE SPEED IF BARE EARTH HAS NOT BEEN EFFECTIVELY WATERED. IN NO CASE SHALL FUGUTIVE DUST BE �\ ALLOWED TO LEAVE THE SITE UNDER CONSTRUCTION. 2. AS SOON AS PRACTICAL AFTER COMPLETION OF CONSTRUCTION, BARE EARTH AREAS SHALL BE VEGETATED. �X 3. AT ANY TIME BOTH DURING AND AFTER SITE CONSTRUCTION THAT WATERING \ ` / AND/OR VEGETATION ARE NOT EFFECTIVE IN CONTROLLING WIND EROSION AND/OR TRANSPORT OF FUGITIVE DUST, OTHER METHODS AS ARE NECESSARY FOR SUCH CONTROL SHALL BE EMPLOYED. THESE METHODS MAY INCLUDE ERECTION OF DUST CONTROL FENCES. IF REQUIRED, DUST CONTROL FENCES -f \� ZSHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAIL FOR A SILT FENCE EXCEPT THE MINIMUM HEIGHT SHALL BE 4 FEET. EROSION CONTROL NOTES: - / 1. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND THE CITY OF WINSTON SALEM STANDARDS, WHICHEVER IS MORE STRINGENT. 2. ALL CURB INLETS AND DROP INLETS SHALL HAVE INLET PROTECTION UNTIL FINAL EROSION CONTROL INSPECTOR APPROVAL. DROP INLETS SHALL BE PROTECTED USING WIRE AND GRAVEL INLET PROTECTION. CURB INLETS SHALL UTILIZE WIRE AND GRAVEL INLET PROTECTION UNTIL ROADS ARE STONED INLET PROTECTION SHALL CONVERTED TO SILK SACK INLET PROTECTION. BE ,I I 3. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A S I I I I S V / VIOLATION OF STATE (NCDEQ) REGULATIONS AND IS SUBJECT TO A FINE. 4 GRADING MORE THAN TAND APPROVED EROSIONCONTROL SS 77� PLANS A VIOLATION OF HE(NCDJDCITYOWI N \EROSIONCONTROORDORDINANCE ECC A FINE. VI,' / 5. DISTURBED AREAS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS CEASED FOR MORE THAN 14 DAYS SHALL BE TEMPORARILY SEEDED AND WATERED. AREAS WHERE FINAL GRADING HAS BEEN COMPLETED FOR MORE THAN 14 DAYS SHALL BE TEMPORARILY OR PERMANENTLY SEEDED. ALL DISTURBED AREAS ON SLOPES GREATER THAN 3:1 AND ON THE SITE PERIMETER AREAS MUST BE TEMPORARILY SEEDED AFTER 7 DAYS. ALL PERIMETER DIKES, SWALES, DIVERSIONES AND SLOPES SHALL BE / / A TEMPORARILY SEEDED AFTER 7 DAYS. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE STATE (NCDEQ) DEPARTMENT OF V / V A\ LAND QUALITY. 7. SLOPES SHALL BE GRADED NO STEEPER THAN 3:1 UNLESS NOTED OTHERWISE. 3:1 FILL SLOPES GREATER THAN 10' MAY REQUIRE ADDITIONAL TERRACING. 8. PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION co/ \� .�� _ ��� I II SHOULD BE CONSTRUCTED AT 3:1 (HORIZONTAL TO VERTICAL) OR FLATTER UNLESS NOTED OTHERWISE. PERMANENT SLOPES OF 3:1 SHOULD BE CONSTRUCTED WHERE MOWING IS DESIRABLE AND AS INDICATED. IF FILL MATERIAL IS BROUGHT ONTO THE PROPERTY OR IF WASTE MATERIAL IS \ / HAULED FROM THE PROPERTY, THEN THE CONTRACTOR SHALL DISCLOSE / �� THE LOCATION OF ANY OFF -SITE BORROW LOCATION AND/OR WASTE BURIAL C LOCATION TO THE EROSION CONTROL INSPECTOR. C) 9. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNER. s�I �S - / / / / / I 10. ALL EROSION CONTROL DEVICES SHALL REMAIN UNTIL SITE HAS BEEN / y PERMANENTLY STABILIZED AND APPROVED BY EROSION CONTROL co �� co INSPECTOR. 11. TOPO MAY REQUIRE DIVERSION DIVERSIONES TO BECOME BERMS IN SOME Imo', 1 I 1- AREAS. I I W WSS ! SS � 12. CHANNEL LINING OR MATTING SHALL BE PROVIDED FOR DIVERSION W �, DIVERSIONES WHERE VELOCITIES EXCEED 2 FPS. � \ (W I 13. CONTRACTOR TO ENSURE NCDEQ SELF -INSPECTION PROGRAM IS / PREFORMED THROUGHOUT THE DURATION OF THE PROJECT. THE n �W\N- �/W WSELF-INSPECTION REPORT SHOULD BE COMPLETED AFTER EACH PHASE OF j �S\ THE PROJECT. PHASES INCLUDE BUT ARE NOT LIMITED TO: INSTALLATION OF ��WN SS - - 1 \ ; I PERIMETER EROSION CONTROL MEASURES, CLEARING AND GRUBBING, ` S �, SS = L - - -� - - -� I COMPLETION OF ANY GRADING OF SLOPES OR FILLS, INSTALLATION OF �_�} / \ \ I STORM DRAINAGE SYSTEMS, COMPLETION OF CONSTRUCTION OR DEVELOPMENT, AND ESTABLISHMENT OF PERMANENT OR TEMPORARY I GROUND COVER. • I� Il, I �� � I I I I� I s I I II I I, SOILS: A OI U) "' I I J CIB A SOILS CLIFFORD SANDY LOAM, 1 % TO 6% SLOPES J I ( ) / I / -I FaB (B SOILS) FAIRVIEW FINE SANDY LOAM, 2% TO 6% SLOPES Z' /� S �� FaC (B SOILS) FAIRVIEW FINE SANDY LOAM, 6% TO 10% SLOPES r I i i _ _ = W I FaD (B SOILS) FAIRVIEW FINE SANDY LOAM, 10% TO 15% SLOPES Z 1S /i FaF (B SOILS) FAIRVIEW FINE SANDY LOAM, 15% TO 45% SLOPES jj m CoA (B SOILS) CODORUS LOAM, 0 TO 2 PERCENT SLOPES is I I 4' BERM M � I TEMP DIVERSION DIVERSION TO BE (TYP) SEEDED ATWELL ATWELL AND ITS ENGINEERS ARE ONLY RESPONSIBLE FOR THE DITCH DESIGN / TYPICAL CROSS SECTION \\\ BUBBLED ON THIS PLAN - - BERM CONSTRUCTION SEQUENCE PHASE 2 3' 1. UPON COMPLETION OF PHASE 1, CONTRACTOR SHALL COMMENCE MASS GRADING. THE 1Mp� 3 / 2 3.1 CONTRACTOR SHALL ADJUST EROSION CONTROL MEASURES AND STABILIZE SITE AS AREAS 3'• I ARE BROUGHT TO FINISHED GRADE. CONTRACTOR MUST FOLLOW SEEDING TIMEFRAME PER y�Y DETAILS. 2. CONTRACTOR TO INSTALL UTILITIES AND STORMWATER. PERMANENT TO 3. CONTRACTOR SHALL INSTALL TEMPORARY PIPE WHERE SHOWN ON PLANS. PERMANENT DITCH (TYP.) BE SEEDED 4. COORDINATE WITH THE APPROVED ON -SITE INSPECTOR PRIOR TO REMOVAL OF EROSION \ TYPICAL CROSS SECTION (DS150 MATTING CONTROL MEASURES. \ / _ REQUIRED) 5. ALL EROSION CONTROL DEVICES SHOULD BE CHECKED PERIODICALLY AND AFTER EVERY MAJOR STORM EVENT, IF ANY FAILURES ARE FOUND THEY SHOULD BE REPAIRED AS SOON AS POSSIBLE. 6. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS \ NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY BEFORE YOU DIG! CALL 1-800-632-4949 N.C. ONE -CALL CENTER ITS THE LAW! WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE. ALL SLOPES \ _ MUST BE SEEDED AND MULCHED WITHIN 14 DAYS OF INACTIVITY. REFER TO EROSION CONTROL ORDINANCE FOR ADDITIONAL REQUIREMENTS. 7. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 8. CALL FOR FINAL INSPECTION BY THE APPROVED ON -SITE INSPECTOR. ATWELL �f6011�00 130 S. ORANGE AVENUE, SUITE 200B ORLANDO, FL 32801 407.425.6623 ATWELL, PLLC COA# 29091 KEY MAP SEAL t 038607 GINEE�.cS��:� ID G. C$ 04/18/2022 NC Eng. Firm License # C-0658 SEAL ISSUED FOR PERMITTING PROJECT BROOKBERRY FARM PHASE 8 BROOKBERRY FARM, LLC CITY OF WINSTON-SALEM 8118096 ISSUANCES NO. DESCRIPTION DATE 1 EROSION UPDATE 5/21/2020 2 UTILITY UPDATE 5/26/2020 3 CREEK CROSSING 10/29/2020 4 DITCH ADD 04/18/2022 DESIGNED BY: DGG DRAWN BY: MKS CHECKED BY: DGG SCALE NORTH VERT: ---- HORZ:1 "= 80' 0 40' 80' 160' SHEET TITLE EROSION CONTROL PHASE 2 SHEET NUMBER C-3.4 4/18/2022 4:44 PM DAVID GASTEL K:\21002439-LANDDESIGN-BROOKBERRY\CORRESPONDENCE\RECEIVED\2021.06.11 - PHASE 8 FILES\8117035 BROOKBERRY PHASE ORIGINAL SHEET SIZE: 24" X 3( 8\CAD\CONSTRUCTION DOCUMENTS\PHASE 8\7035-PLN-EROSION CONTROL - PHASE 2.DWG