Loading...
HomeMy WebLinkAboutNCC221586_ESC Approval Submitted_20220422CHARIATTE. April 18, 2022 LETTER OF APPROVAL Elmington Capital Group Attn: C. Hunter Nelson 118 16' Ave S, Ste 200 Nashville, TN 37203 RE: Project Name: Flats at West Boulevard Permit ID: LDGP-2022-00093 Denuded Acreage: 11 County: Mecklenburg Submitted By: Elmington Capital Group Dear Mr. Nelson: Elmington Capital Group c/o Pease Law, LLC 16151 Lancaster Hwy, Ste B Charlotte, NC 28277 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no preconstruction meeting and land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129 and Section 17-35(b) of the City of Charlotte Code of Ordinances. Acceptance and approval of this plan is also conditioned upon your compliance with Federal, State, and local water quality laws, regulations, and rules. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under NCGO1000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above -named proiect. The NOI form maybe accessed atdeg.nc.gov/NCGOI. Please direct questions about the NOI form to Alaina Morman at alaina.mormon&ncdenr.gov or Paul Clark at paul.clark&ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOlpermit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Flats at West Boulevard April 18, 2022 Page 2 of 2 Upon receiving this approval, it is the responsibility of the Financially Responsible Party, their agent, or the owner to request a pre -construction meeting by completing the Pre -Construction Meeting Request Form found at hllps:Hcharlottenc.seamlessdocs.com/f/cQRAt. Please provide at least 48 hours advance notice for the pre -construction meeting so that City Staff may coordinate and schedule the appropriate personnel. No land disturbance of any kind, including any demolition, is allowed prior to the pre -construction meeting Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation 2. The NCGO1 permit and the COC, once it is received 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. The City of Charlotte's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the City of Charlotte Code of Ordinances and the Sedimentation Pollution Control Act of 1973 (G.S. 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act and Local Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and County water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. Approval of this plan is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Your cooperation is appreciated. Sincerely, L)4. W11L James Wilson, CPESC Charlotte Land Development Program 0 LOTUS LN Flats at West Blvd Printed On: 4113122 CHARLOTTE. Permit Number: LDGP-2022-00093 Expiration Date: 13-Apr-25 City of Charlotte - Engineering and Land Development Permit Status: In Progress 600 East Fourth Street Status Date: 13-Apr-2022 Charlotte North Carolina 28202-2850 Grading Permit/NA/NA Company/Individual Name Address Phone Owner TROTTER PROPERTIES LLC 3121 SPRINGBANK LN STE C CHARLOTTE,NC28226 Applicant - Key Contact Financially Responsible Party Elmington Capital Group ( C Nelson) 118 16th Ave South nashville,TN 37203 Contact Urban Design Partners, PLLC ( Brian Smith) 1213 W Morehead Street, Suite 450 7043343303 Charlotte,NC 28208 Parcel Nbr Tract Block Lot 14510317 3 17 Application Information Acreage 13.08 Disturbed Acreage 11 Fees Description Amount Total Fees Due: Total Fees Paid: This permit conveys approval from the permitting entitiy to conduct land -disturbing activity by the Owner or his agent as shown on the approved plan in accordance with the Sedimentation and Erosion Control Ordinances, Tree Preservation Ordinances and related policies. This permit is valid until the project is complete or 3 years from the issuance of the permit, whichever comes first. If erosion control measures required by the plan prove to be inadequate to control sediment as required by the Ordinance, the applicant will be required to submit a revised plan and take corrective measures. By issuance of this permit an isnpector has the Signature: Date: Applicant Signature: Date: Inspector File Copy Site Copy Applicant Copy Inspector Copy