Loading...
HomeMy WebLinkAboutNC0043532_More Information (Received)_20220331Strickland, Bev From: Duane Wingo <dwingo@stanlycountync.gov> Sent: Thursday, March 31, 2022 2:39 PM To: Basinger, Corey; Scheller, Roberto; Jason Boyd; Browder, Dee Subject: [External] West Stanly WWTP 1.2 MGD Upgrade Project Final Certification Attachments: Final Certification West Stanly 1.2 MGD Upgrade Project.pdf; Final Certification Letter March 31, 2022.docx CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Corey, The final certification and letter are attached. Thanks, Duane Duane Wingo, PE Stanly County Utilities Director 1000 N. First Street Suite 12 Albemarle, NC 28001 Phone: (704) 986-3691 Cell: (704) 221-4291 dwingo(a stanlycountync.gov Pursuant to North Carolina General Statutes, Chapter 132, email correspondence to and from this address may be considered public record under North Carolina Public record Laws and may be disclosed to third parties. 1 Stanly County West Stanly WWTP Authorization to Construct No. 043532A01 Issued May 1, 2020 NPDES Permit No. NC0043532 Engineer's Certification 1, James Jason Boyd , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the West Stanly Wastewater Treatment Plant, located in Stanly County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Modification to McCoy Creek influent pump station, installation of one (1) potassium permanganate feed system for odor control, one (1) influent magnetic meter vault, one (1) 9 MGD cylindrical bar screen, one (1) 9 MGD aerated grit removal system, one (1) aeration basin splitter box, one (1) refrigerated sampler, eight (8) 10 HP floating aerators and eight (8) 7 CFM floating blowers for aerat�en n, one (1) WAS magnetic meter vault, one (1) 10"x21" downward opening weir gate and one (1) 18"x21" downward opening weir gate for the clarifier splitter box, one (1) 75' diameter circular secondary clarifier with 14' side -water depth, three (3) 1500 GPM vertical turbine effluent pumps for effluent force main, one (1) 96 GPM vertical turbine effluent pumps for plant water service, three (3) 625 GPM suction lift RAS pumps, one (1) sodium hydroxide chemical feed and delivery system for pH control, modification to chlorination/dechlorination contact tank by raising the top of wall of 2.6', and demolition of the emergency Outfall 001; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Depaitnient of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature cdeow46 964•-'7' Date 3/31/2022 Mail this Certification to: Registration No. 036165 Attn: Min Xiao Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 ✓� Q S J. ,. Mar 2022AM STANLY COUNTY - NORTH CAROLINA gteft /fiw Lana &cce,' , March 31, 2022 Mr. Corey Basinger NCDEQ — Mooresville Regional Office 610 East Center Avenue Suite 301 Mooresville, NC 29202 RE: Final Engineer's Professional Certification for West Stanly West Stanly 1.2 MGD Upgrade Project Dear Mr. Basinger: Per Requirements of the SOC WQ S19-003, I am submitting the Final Engineer's Certification for the West Stanly 1.2 MGD Upgrade Project. A final inspection by the County, WK Dickson and Haren Construction on March 24, 2022 and all punchlist items listed with the substantial completion certification were addressed satisfactorily. We conducted a meeting with Dee Browder with NCDEQ-DWI this morning, on March 31, 2022, concerning contract close out. There are additional change orders that need to be completed and processed that we have requested and are within the project's 5% contingency allowance. These remaining change orders are not a part of the NCDEQ approved construction drawings but needed to improve the facility's operations and OSHA safety concerns. These items are a tractor purchase to be able to safely transfer solid waste from the new headworks to a dumpster and additional facility lighting to better work at night. Utilities Department 1000 N. First Street, Suite 12, Albemarle, NC28001 P/ 704.986.3686 www.stanlycountync.gov F/ 704.986.3711 STANLY COUNTY - NORTH CAROLINA gteft /fiw Lana &ccese, We have agreed with NCDEQ-DWI that these items will be completed by May 17th 2022 and the project close out can occur with completion of all other necessary financing forms. I apologize for my lack of experience with this specific matter, but would ask if the attached document satisfies all remaining requirements to fulfill SOC WQ S19-00 Agreement, if so, we will continue to work with NCDEQ-DWI forward. Respectfully, Duane S. Wingo Duane Wingo, PE Stanly County Utilities Director 1000 N. First Street Suite 12 Albemarle, NC 28001 Phone: (704) 986-3691 Cell: (704) 221-4291 dwingo@stanlycountync.gov Cc: Jason Boyd, WK Dickson Dee Browder NCDQ-DWI Utilities Department 1000 N. First Street, Suite 12, Albemarle, NC28001 P/ 704.986.3686 www.stanlycountync.gov F/ 704.986.3711