Loading...
HomeMy WebLinkAboutWQ0043372_Application (FTSE)_202204200QJ64337 Z 111Li B P.O. Box 154 AN WASHINGTON, NC 27889 ENGINEERING PHONE (252) 945-2983 g' mupeedin@ibxengineering.com To: Date 4/20/22 No.21011 NCDEQ-DWR Re: Sewer Extension Permit— Stanfield Subdivision Phase II Attn: Tina Martin WE ARE SENDING YOU ® Attached 0 Under separate cover via the following items: ❑ Shop drawings ❑ Copy of letter ❑ Change order ❑ Prints ❑ Plans 0 Samples 0 Specifications COPIES DATE No DESCRIPTION 1 Fast Track Sewer System Extension Application 1 Flow Tracking for Sewer Extension Application 1 USGS Map 1 check THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted ❑ As requested 0 Returned for corrections ❑ For review and comment 0 ❑ FOR BIDS DUE 20 0 PRINTS RETURNED AFTER LOAN TO US ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints REMARKS: This permit is for a second phase of Stanfield subdivision. If you have any questions please call. Marie U. Peedin, PE. DWR Division of Water Resources RECF yr rs APR 2 0 2022 BY: State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION INSTRUCTIONS FOR FORM: FTA 06-21 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria (Gravity Sewer & Pump Stations/Force Mains) and that plans, specifications and supporting documents have been prepared in accordance with 15A NCAC 02T, 15A NCAC 02T .0300, Division policies, and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be immediately available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that do not meet any part of the minimum design criteria (MDC) documents; ➢ Projects that involve more than one variance from the requirements of 15A NCAC 02T; ➢ Pressure sewer systems utilizing simplex septic tank -effluent pumps (STEPs) or simplex grinder pumps; ➢ Simplex STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy (second copy may be digital) of Application and Supporting Documents • Required unless otherwise noted. Signatures on original must be "wet ink" or secure digital signatures. Please do not submit engineering design plans with the application unless specifically requested. B. Cover Letter/Narrative Description (Required for All Application Packages): g List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ Include the permit number/status of any other required sewer permits (downstream/upstream) ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Modification Application Packages): O Submit a check or money order in the amount of $480.00, dated no more than 90 days prior to application submittal. > Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track Application (Required for All Application Packages, Form FTA 05-21): ® Submit the completed and appropriately executed application. > If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FOj .M: FTA 06-21 & SUPPORTING DOCUMENTATION Page 1 of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. > Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. > The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area, including the closest surface waters. > General location of the project components (gravity sewer, pump stations, & force main) > Downstream connection points and permit number (if lrnown) for the receiving sewer O Include an aerial location map showing general project area (such as street names or latitude/longitude) so that Division staff can easily locate it in the field. G. Existing Permit (Application Packages for Modifications to an Existing Permit): ❑ Submit a copy of the most recently issued existing permit. ❑ Include a descriptive and clear narrative identifying the previously permitted items to remain in the permit, items to be added, and/or items to be modified (the application form itself should include only include items to be added/modified). The narrative should also include whether any previously permitted items have been certified. ❑ The narrative should clearly identify the requested permitting action and accurately describe the sewers to be listed in the final permit. H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. > This alternative is only available for average daily flows less than 15,000 gallons per day > It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations O Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 05-21 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Swannanoa, North Carolina 28778-8211 (828) 296-4500 (828) 299-7043 Fax Avery, Buncombe, Burke, Caldwell, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, McDowell, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey Water Quality Section Fayetteville Regional Office 225 Green Street Suite 714 Fayetteville, North Carolina 28301-5095 (910) 433-3300 (910) 486-0707 Fax Anson, Bladen, Cumberland, Harnett, Hoke, Montgomery, Moore, Robeson, Richmond, Sampson, Scotland Water Quality Section Mooresville Regional Office 610 E. Center Avenue Mooresville, North Carolina 28115 (704) 663-1699 (704) 663-6040 Fax Alexander, Cabarrus, Catawba, Cleveland, Gaston, Iredell, Lincoln, Mecklenburg, Rowan, Stanly, Union Water Quality Section Raleigh Regional Office 3800 Barrett Drive Raleigh, North Carolina 27609 (919) 791-4200 (919) 571-4718 Fax Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton, Orange, Person, Vance, Wake, Warren, Wilson Water Quality Section Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Water Quality Section Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 796-7215 (910) 350-2004 Fax Brunswick, Carteret, Columbus, Duplin, New Hanover, Onslow, Pender Water Quality Section Winston-Salem Regional Office 450 W. Hanes Mill Road Suite 300 Winston-Salem, North Carolina 27105 (336) 776-9800 (336) 776-9797 Fax Alamance, Alleghany, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Stokes, Surry, Watauga, Wilkes, Yadkin Water Quality Section INSTRUCTIONS FOR FORM: FTA 05-21 & SUPPORTING DOCUMENTATION Page 3 of 3 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: WQ00 1 37 2_, (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Ayden (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Matthew Livingston per 15A NCAC 02T .0106(b) Title: Town Manager 4. Applicant's mailing address: 4144 West Ave. City: Ayden State: NC Zip: 28513- 5. Applicant's contact information: Phone number: (252) 481-5826 Email Address: mlivingston@ayden.com II. PROJECT INFORMATION: 1. Project name: Stanfield Subdivision Phase II 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: _ , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Pitt 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.469° Longitude: -77.440° 5. Parcel ID (if applicable): 466 23 99224 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Marie U. Peedin License Number: 20212 Firm: Inner Banks Engineering, PC Mailing address: PO Box 154 City: Washington State: NC Zip: 27889- Phone number: (252) 945-2983 Email Address: mupeedin@ibxengineering.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: CMSD Owner Name: CMSD Permit Number: NC0032077 V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: 8 inch ® Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00269 Owner Name(s): Town of Ayden FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ School / preschool / day care ❑ Food and drink facilities ❑ Businesses / offices / factories ❑ Medical / dental / veterinary facilities ❑ Church ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool/Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ❑ No ➢ If ves, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,n No. of Units Flow Residential 360 gal/day 30 10,800 GPD gal/ GPD gal/ GPD gall GPD gal/ GPD gal/ GPD Total 10,800 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 3600 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1387 PVC 8 20 DIP > Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria > Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - . 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) > This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01 C.1.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or ❑ Standby pump > Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B): > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: > Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f) & (g)? ❑ Yes ❑ No 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches zWater mains (vertical - water over sewer preferred, including in benched trenches) 18 inches zWater mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class Il impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305(f) or (g), see Section X.1 of this application *15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A > If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A > Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin name: Neuse ❑ No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No > This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ❑ Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and projects requiring a variance approval may be subject to loner review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project, the full technical review is required. 2. Professional Engineer'sfCertification:t I, „ i { U•��t�.'^ , attest that this application for £ 1 12C D SAS r (Professional Engineer's name from Application Item III 1.) (Project Name from Application Item I1 1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): 1, I (Signature Authority Name j%jm Application Item 1.3.) (Project Name from Application Item I1.1) `,,,NIINII, ��% �l N CAg0 ,,_ 4'4 9 ' ~( . ISEAL :. = : 20212 i .. �, .'wgl.F.r1 Q•- , • au 1 J st-rik.$ Rr td cuts et. , attest that this application for attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: FORM: FTA 06-21 Date: %( +4 ;2— Page 5 of 5 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Ayden Project Name for which flow is being requested: Stanfield Sub. Phase 2 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Contentnea Metropolitan Sewerage District b. WWTP Facility Permit #: NC0032077 Alliows are in MGD c. WWTP facility's permitted flow 3.5 d. Estimated obligated flow not yet tributary to the WWTP .635 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 1.845 .0036 2.484 70.97% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station (Name or Number) Pump Station Permit No. Finn Capacity, * MGD (A) Design Average Daily Flow** (Firm / pf), MGD (B) Approx. Current Avg. Daily Flow, MGD (C) (D)=(B+C) Obligated, Not Yet Tributary Daily Flow, MGD Hwy 11 WQCS00080 7.5 3 1.2045 .635 Total Current Flow Plus Obligated Flow (E)=(A-D) Available Capacity*** 1.84 1.16 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Contentnea Metropolitan Sewerage Distr. Downstream Permit Number: NC0032077 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Charles M. Smithwick, Jr certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with Local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Date S71P1 eir mithud-6ele, 6t1 Sy Title of Signing Official Page 2 of 6 FTSE 10-18 �o a elzo1oo iz e'ewezaye £ I Id CMSD POST OFFICE BOX 477 GRIFTON, NORTH CAROLINA 28530 CHARLES M. SMITHWICK, JR. DISTRICT MANAGER April 20, 2022 Ms. Marie U. Peedin, PE PO Box 154 Washington, NC 27889 Re: Town of Ayden Wastewater Flow Request Stanfield Subdivision -Phase 2 Ms. Peedin: By virtue of this letter, the Contentnea Metropolitan Sewerage District (CMSD) agrees to accept the additional flow of 3,600 gallons per day (10 lots x 360 gallons per day) generated by this project. in March 2007 a request to accept the flow from 30 lots (10,800 gallons per day) was approved by the CMSD. It is understood that this project has been modified to increase the lot count to 40 lots. Attached is the FTSE form and supporting documentation. Please advise if you have questions or need additional information. Charles M. Smithwick, Jr. District Manager, CMSD Wastewater Flow Tracking Flow Not Tributary to WWTP Ayden Date CMSD # Lots Point of Accepted Subdivision #Lots Platted #Lots wlConstruction Remaining Entry Flow Not Tributary Yr/Month Springdale Townes 60 0 60 Hwy 11 21,600 2002-Apr Springdale Apart. 96 24 72 Hwy 11 25,920 2004-Apr Bel -Mar PI. Ph 2 37 9 28 S Edge 10,080 2006-May Pineview Sub. 5 3 2 720 2011-Nov The Arbors 128 20 108 Hwy 11 38,880 Stanfield Sub. 30 0 30 Hwy 11 10,800 2007-Mar Country Club Creek 127 11 116 S Edge 41,760 2020-Sept *** Ayden CC(pool/clubh) 53 10 43 S Edge 15,480 2006-Feb Pineview Sub. Sec 2 32 21 11 Hwy 11 3,960 2008-Jan Camdyn Place Sub 32 0 32 S Edge 11,520 2009-Apr Arbors (1 bedrm unit) 32 0 32 Hwy 11 7,680 Arbors (2 bedrm unit) 32 0 32 Hwy 11 7,680 Arbors (clubhouse) Hwy 11 360 South Country Sub Hwy 11 35,280 * 2002-Apr Allen Park Sub 43 0 43 S Edge 20,640 2018-Aug Montevallo(Sec1, Ph1) 18 0 18 S Edge 6.480 2020-May Leagacy Park 144 0 144 Hwy 11 34 560 2020-July Allen Park Sub. Sec 2 22 0 22 S Edge 7.920 2020-Aug East Ridge. Sec 2 84 0 84 S Edge 30.240 2020-Oct Cottages @ Swift Creek 39 0 39 S Edge 14040 2020-Nov Total Flow Obligated but 345,600 Not Tributary to WWTP Ayden 345,600 Winterville 289,440 Total 635,040 *This document was revised May 23, 2017 to add South Country Subdivision ***Country Club Acres and Country Club Creek Sub are combined as one subdivision. Permit modification reflects 127 lots. ***Original flow acceptance was May 2007. Permit modified September 2020 Wastewater Flow Tracking Flow Not Tributary to WWTP Winterville Date CMSD # Lots Point of Accepted Subdivision # Lots Platted # Lots w/Construction Remaining Entry Flow Not Tributary Yr/Month Canterbury Sec.6 63 60 3 Reedy Br 1080 2002-Feb Brookestone 74 18 47 Church St 16920 2006-Sept Brookfield 76 73 3 Church St 1080 2008-Mar Denali Sub 68 66 2 Reedy Br 720 2008-Mar Blackstone 27 16 11 Reedy Br 3960 2014-Oct Copper Creek 40 0 40 Mag. Rid 14400 2018-May Holly Grove Sub 62 0 45 Church St 21600 2018-July Brookfield Sec. 4 57 0 57 Church St 20520 2018 Oct Eli's Ridge 232 0 232 Church St 111360 2019-Aug Villa Grande Ph 1 & 2 36 3 Bedroom 0 36 Reedy Br 12960 Permit 72 4 Bedroom 35 6 Reedy Br 2880 Revision 13 5 Bedroom 0 13 Reedy Br 7800 2019-Sept Copper Creek Sec.2 52 0 52 Mag.Rid. 18720 2021-Feb Eleven At Main 154 0 154 Reedy Br 55440 2021-Nov Total Flow Not Tributary 289,440 Note: Updated by Town of Winterville (2-15-2021) CMSD Wastewater Flows (April 2021 thru March 2022) Hwy 11 PS Main Plant Total Average Total Average 2021 April 35.993 1.2 53.571 1.786 May 29.376 0.948 40.813 1.317 June 54.378 1.813 86.341 2.878 June 46.697 1.506 74.123 2.391 August 54.95 1.773 89.03 2.872 September 30.038 1.001 44.511 1.484 October 28.128 0.907 41.97 1.354 November 25.836 0.861 41.089 1.37 December 27.076 0.873 39.834 1.285 2022 January 39.302 1.268 58.942 1.901 February 33.739 1.205 51.673 1.845 March 34.062 1.099 51.304 1.655 Total/Average 439.575 1.2045 673.201 1.84483 `USGS U.S. DEPARTMENT U.S. GEOLOGICAL SURV YERIOR science for a changing world STANFIELD SB. PH 2 The National Map USTopo