Subject: [External] RE: NCDOT HE-0005: Boom Roadway Access & Connectivity Project - Start
of Study Notification
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Aileen,
Thank you for your email. The Corps of Engineers is aware of the proposed project, and references the meeting held on
2/23/2022 to discuss the project. Further, the Corps participated in a field verification meeting of potentially
jurisdictional resources within the Study Area on 4/5/2022. Based on the latter, there are several areas of potential
waters of the US within the Study Area. Further, there are Conservation Areas immediately outside of the eastern -most
section of the Study Area where any construction/clearing activities would be in non-compliance with existing Corps of
Engineers authorizations (SAW-2000-21655 — Piedmont triad International Airport) and resultant Declarations of
Restrictions. Caution would be required during planning/construction to not encroach into this area as this project
proceeds.
Per our discussion on 2/23/2022, absent a transportation -related purpose and need independent of the Boom facility,
any proposed impacts to potential waters of the US for such roadway improvements would be considered part of the
PTIA single and complete project and likely require authorization via Individual Permit. It is the Corps' understanding
that planning is underway to design such roads to avoid impacts to potential waters of the US.
We hope that the above comments are useful as planning proceeds. Please let me know if you have any questions.
Sincerely,
Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Mobile: (919) 817-2436
Office: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: https://regulatory.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
From: Aileen Mayhew <Aileen.Mayhew@mottmac.com>
Sent: Friday, March 25, 2022 8:27 AM
To: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; 'garyjordan@fws.gov'
<garyjordan@fws.gov>; Morales, Suzette (FHWA) <omojojadavwe.morales@dot.gov>; somerville.amanetta@epa.gov;
Conchilla, Ryan <ryan.conchilla@ncdenr.gov>; sue.homewood@ncdenr.gov; travis.wilson@ncwildlife.org
Cc: Ketner, Brian K <bkketner@ncdot.gov>
Subject: [Non-DoD Source] NCDOT HE-0005: Boom Roadway Access & Connectivity Project - Start of Study Notification
Dear Agency Representative:
SUBJECT: Notification of start of activities for STIP HE-0005 - Proposed Roadway Access & Connectivity Project at PTI
Airport
NCDOT Highway Division 7 has begun the planning, environmental, and engineering studies for the following project:
STIP No.
WBS No.
Project Description
County
Latitude
Longitude
HE-0005
50338
Proposed Roadway Improvements to Provide
Access and Connectivity to PTI Property in
Greensboro
Guilford
36.119095
-79.951637
The proposed project is located at the Piedmont Triad International Airport in Greensboro, Guilford County. Boom
Supersonic selected Greensboro for the first supersonic airliner manufacturing facility. The proposed project includes
roadway improvements to provide access and connectivity to PTI property.
NCDOT would appreciate any information you might have that would be helpful in evaluating potential environmental
impacts of the project. A project location map and study area map are attached. Your comments will be used in the
preparation of a Minimum Criteria Determination Checklist, prepared in accordance with the State Environmental Policy
Act.
Please note that there will be no formal interagency meeting for this project. It is desirable that your agency respond by
April 20, 2022 concerning any beneficial or adverse impacts of the proposed project. If you would like additional time to
provide comments, please let me know.
If you have any questions concerning this project, please contact Brian Ketner, PE, Division 7 Project Engineer, at (336)
487-0075 or bkketner@ncdot.gov or me at (919) 552-2253 or aileen.mayhew@mottmac.com. Please include the
Project Number (HE-0005 - Boom) in all correspondence and comments.
Thank you,
Aileen