Loading...
HomeMy WebLinkAboutNCC221124_Site Plan or Location Map_20220418DocuSign Envelope ID: 7439E5B2-F900-45AB-835E-214772698667 INDEX OF SHEETS CoverSheet....................................................................................... 1 GeneralNotes................................................................................... 2 StormDrainage Schedule ........................................................... 3A-3C Plan& Profile................................................................................. 4-17 Utility............................................................................................ U1-U6 Details........................................................................................... DI-D5 StructuralDetails......................................................................... S1-S13 Traffic Control Plans........................................................... TCP1-TCP3 Erosion Control....................................................................... EC1-EC9 a Fq, 7Z�E*Oq oP0 4�G Q- �< o y 0 _'0 GLENEAGLES ROAD 76 TOTAL SHEETS 56 PROJECT SITE SHARON VIEW ROAD 00 �00 VICINITY MAP NTS SURVEY PREPARED BY: %.r r r yr %IXXIIXr.r,v r r r, Our. v r, r-lvirXr r r r.vlvr THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON STATE PLANE COORDINATES ESTABLISHED BY: NCGS MONUMENT OR CONTROL POINT WITH NAD 83(2011) STATE PLANE COORDINATES OF NORTHING:507760.54 EASTING: 1450375.96 THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.9998464 ELEVATION NAVD: 675.22' VERTICAL DATUM: NAVD 88 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES. DATE RANGE OF SURVEY:6/12/2015 TO 9/14/2016 PLANS PREPARED BY: Charlotte -Mecklenburg STORM WATER1001 Services MOREHEAD SQUARE DR. SUITE 610 CHARLOTTE, NC 28203 NC LICENSE NUMBER: F-0165 Sharon View Road ww PE SEAL *%'J"CA,1J#J"�i �,. oFESS/py f ' SEAL � i i 041267 CHARLOTTESM DacuSigned by: ENGINEERING & PROPERTY 0 g,F 264Eg... MANAGEMENT Construction Plans of Proposed Cutchin Drive Storm Drainage Improvement Project Project No. 671-14-257 MON ED E� E�J LOCATION MAP NTS Proiect Features: Drainage Pipe and Structures, Curb and Gutter, Asphalt Paving, Traffic Control Erosion Control LJ1 _ ti • oa bola/Ar— v Ml N CONVENTIONAL SIGNS NewProperty Line..................................— ,,����nnn►4 ... � ...... RD�j'�•, Existing Property Line ...................................— — �,��'OF ESS/pq'�. Maintained as R/W Line ................................ R/w SEAL i 026926 Existing Structures ......................................... i �• IN,,,. ��.�� Railroad Tracks . .............................................. ��v�,���►►►•` Proposed Edge of Pavement .......................... DocuSigned by: iUtav�'S��jvt,uL Fence................................................................ x o - 9' L6HD1464 Permanent Storm Drain Easement ................ PSDE Temporary Construction Easement ............. e e o ,,����nnngi �.�N CARp�.Sanitary Sewer Easement .............................. SSE SSE ESS/0 :yq '� '_% ; Storm Drainage Easement ............................. SDE SDE SEAL 's i 044565 ? Public Drainage Easement ............................ PDE PDE ♦♦,'.y''F:�GINE���'`�`�' Existing Gas Line ........................................... G G 4N� ii: ►� ��,,, Existing Water Line W W DacuSigned by: ExistingSanitary Sewer..............6.6.6.6........... SS Ss oi-o8$z°6sisFF42E... Existing Underground Telecommunications uT uT Existing Underground Electric ..................... uE uE Existing Storm Drainage Record Drawings Proposed Storm Drainage ExistingTree.......................................................................................... 0 ExistingWater Meter............................................................................. WM ❑ WV ExistingWater Valve............................................................................. >a ExistingGas Valve................................................................................. GV >a S ExistingSanitary Sewer Manhole......................................................... s Proposed Sanitary Sewer Manhole ExistingStorm Drain Manhole..............................................................OD Proposed Storm Drain Manhole...........................................................� Existing Telephone Manhole T Proposed Telephone Manhole...............................................................0 Existing Electric Manhole E Proposed Electric Manhole ............................. E ExistingCatch Basin.............................................................................. ProposedCatch Basin............................................................................� ExistingLight Pole................................................................................. ProposedLight Pole................................................................................ ExistingUtility Pole................................................................................ .1 GuyWire............................................................................................ __< ProposedUtility Pole.............................................................................. AK IronPin.................................................................................................... O ExistingFire Hydrant............................................................................ . 6- ProposedFire Hydrant.......................................................................... ExistingDrop Inlet..................................................................................0 ProposedDrop Inlet................................................................................ Accessible Ramp TreeProtection............................................................................. \__/ ProposedSafety Rail................................................................... SF SiltFence..................................................................................... Proposed Curb & Gutter, Conc. Drive, Sidewalk ................... ProposedAsphalt Pavement........................................................ Proposed Rip Rap Ditch.............................................................. ProposedGravel........................................................................... RECOMMENDED Proposed Pavement Removal 0 FOR CONSTRUCTION Proposed Sidewalk Bridging Tree Roots .................................. Contract Administration Edward Mobley, email, 08/25/2020 Asphalt Milling............................................................................ 0111- Storm Water Construction Logan Oliver, email, 02/01/2021 GRAPHIC SCALES Landscape Management Craig Monroe, emal, 02/19/2021 Bid Set No. Utility Coordinator Thomas Bennett, email, 11/23/2020 20 40 60 Plan View ................. CDOT -Design Jacob Peeters, email, 11/23/2020 CHARLOTTE, L35-26 20 40 60 CDOT - Implementation Erin Pratt, email, 01/11/2021 Horz. Profile ............ 4 8 12 CLTWater Bill Deal, email, 10/26/2020 2018 STANDARD SPECIFICATIONS Vert. Profile ............. Storm Water - Water Quality Helen Simonson, 11 /25/2020 Storm Water Project Manager Shawn McDonald, 03/15/2021 ENGINEERING & PROPERTY MANAGEMENT APPROVED Matt Gustis, webex meeting STORM WATER SERVICES 11 /24/2020 DATE