HomeMy WebLinkAboutNCC221124_Site Plan or Location Map_20220418DocuSign Envelope ID: 7439E5B2-F900-45AB-835E-214772698667
INDEX OF SHEETS
CoverSheet....................................................................................... 1
GeneralNotes...................................................................................
2
StormDrainage Schedule
........................................................... 3A-3C
Plan& Profile................................................................................. 4-17
Utility............................................................................................ U1-U6
Details........................................................................................... DI-D5
StructuralDetails......................................................................... S1-S13
Traffic Control Plans........................................................... TCP1-TCP3
Erosion Control....................................................................... EC1-EC9
a
Fq,
7Z�E*Oq
oP0 4�G
Q- �<
o y
0
_'0
GLENEAGLES ROAD 76
TOTAL SHEETS 56
PROJECT
SITE
SHARON VIEW ROAD
00
�00
VICINITY MAP
NTS
SURVEY PREPARED BY:
%.r r r yr %IXXIIXr.r,v r r r, Our. v r, r-lvirXr r r r.vlvr
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR
THIS PROJECT IS BASED ON STATE PLANE COORDINATES
ESTABLISHED BY: NCGS MONUMENT OR CONTROL POINT
WITH NAD 83(2011) STATE PLANE COORDINATES OF
NORTHING:507760.54 EASTING: 1450375.96
THE AVERAGE COMBINED GRID FACTOR USED ON THIS
PROJECT (GROUND TO GRID) IS: 0.9998464
ELEVATION NAVD: 675.22'
VERTICAL DATUM: NAVD 88
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL
DISTANCES. DATE RANGE OF SURVEY:6/12/2015 TO 9/14/2016
PLANS PREPARED BY:
Charlotte -Mecklenburg
STORM
WATER1001
Services
MOREHEAD SQUARE DR.
SUITE 610
CHARLOTTE, NC 28203
NC LICENSE NUMBER: F-0165
Sharon View Road
ww
PE SEAL
*%'J"CA,1J#J"�i
�,. oFESS/py
f ' SEAL � i
i 041267
CHARLOTTESM DacuSigned by:
ENGINEERING & PROPERTY 0 g,F 264Eg...
MANAGEMENT
Construction Plans of Proposed
Cutchin Drive Storm Drainage Improvement Project
Project No. 671-14-257
MON
ED E� E�J
LOCATION MAP
NTS
Proiect Features:
Drainage Pipe and Structures,
Curb and Gutter,
Asphalt Paving,
Traffic Control
Erosion Control
LJ1 _
ti
• oa
bola/Ar—
v
Ml
N
CONVENTIONAL SIGNS
NewProperty Line..................................—
,,����nnn►4
... � ......
RD�j'�•, Existing Property Line ...................................— —
�,��'OF ESS/pq'�. Maintained as R/W Line ................................ R/w
SEAL
i 026926
Existing Structures .........................................
i
�• IN,,,. ��.�� Railroad Tracks . ..............................................
��v�,���►►►•` Proposed Edge of Pavement ..........................
DocuSigned by:
iUtav�'S��jvt,uL Fence................................................................ x
o - 9' L6HD1464 Permanent Storm Drain Easement ................ PSDE
Temporary Construction Easement ............. e e
o
,,����nnngi
�.�N CARp�.Sanitary Sewer Easement .............................. SSE SSE
ESS/0 :yq '�
'_% ; Storm Drainage Easement ............................. SDE SDE
SEAL 's
i 044565 ? Public Drainage Easement ............................ PDE PDE
♦♦,'.y''F:�GINE���'`�`�' Existing Gas Line ........................................... G G
4N� ii: ►� ��,,, Existing Water Line W W
DacuSigned by:
ExistingSanitary Sewer..............6.6.6.6........... SS Ss
oi-o8$z°6sisFF42E... Existing Underground Telecommunications uT uT
Existing Underground Electric ..................... uE uE
Existing Storm Drainage
Record Drawings Proposed Storm Drainage
ExistingTree.......................................................................................... 0
ExistingWater Meter.............................................................................
WM
❑
WV
ExistingWater Valve............................................................................. >a
ExistingGas Valve.................................................................................
GV
>a
S
ExistingSanitary Sewer Manhole.........................................................
s
Proposed Sanitary Sewer Manhole
ExistingStorm Drain Manhole..............................................................OD
Proposed Storm Drain Manhole...........................................................�
Existing Telephone Manhole T
Proposed Telephone Manhole...............................................................0
Existing Electric Manhole
E
Proposed Electric Manhole .............................
E
ExistingCatch Basin..............................................................................
ProposedCatch Basin............................................................................�
ExistingLight Pole.................................................................................
ProposedLight Pole................................................................................
ExistingUtility Pole................................................................................
.1
GuyWire............................................................................................
__<
ProposedUtility Pole..............................................................................
AK
IronPin....................................................................................................
O
ExistingFire Hydrant............................................................................ . 6-
ProposedFire Hydrant..........................................................................
ExistingDrop Inlet..................................................................................0
ProposedDrop Inlet................................................................................
Accessible Ramp
TreeProtection............................................................................. \__/
ProposedSafety Rail...................................................................
SF
SiltFence.....................................................................................
Proposed Curb & Gutter, Conc. Drive, Sidewalk ...................
ProposedAsphalt Pavement........................................................
Proposed Rip Rap Ditch..............................................................
ProposedGravel...........................................................................
RECOMMENDED
Proposed Pavement Removal
0
FOR CONSTRUCTION
Proposed Sidewalk Bridging Tree Roots ..................................
Contract Administration Edward Mobley, email, 08/25/2020 Asphalt Milling............................................................................
0111- Storm Water Construction Logan Oliver, email, 02/01/2021
GRAPHIC SCALES
Landscape Management Craig Monroe, emal, 02/19/2021 Bid Set No.
Utility Coordinator Thomas Bennett, email, 11/23/2020
20 40 60
Plan View ................. CDOT -Design Jacob Peeters, email, 11/23/2020 CHARLOTTE, L35-26
20 40 60 CDOT - Implementation Erin Pratt, email, 01/11/2021
Horz. Profile ............
4 8 12 CLTWater Bill Deal, email, 10/26/2020
2018 STANDARD SPECIFICATIONS Vert. Profile .............
Storm Water - Water Quality Helen Simonson, 11 /25/2020
Storm Water Project Manager Shawn McDonald, 03/15/2021
ENGINEERING & PROPERTY
MANAGEMENT
APPROVED Matt Gustis, webex meeting
STORM WATER SERVICES
11 /24/2020
DATE