HomeMy WebLinkAbout20060641 Ver 1_More Info Letter_20060426W ATF
p~pF
9OG Michael F. Easley, Governor
.~
om William G. Ross Jr., Secretary
~ t
-- North Carolina Department of Environment and Natural Resources
~ ~
(~ ^~' Alan W. Klimek, P.E. Director
Division of Water Quality
Apri126, 2006
DWQ Project # 06-0641
Franklin County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Chris Barron
Faith Baptist Church
249 Holden Road
Youngsville, NC 27856
Subject Property: Faith Baptist Church
Ut to Richland Creek [030402, 27-21-(21.5), WSN, NSW]
REQUEST FOR MORE INFORMATION
Dear Mr. Barron:
On April 12, 2006, the Division of Water Quality (DWQ) received your application dated April 11, 2006,
to impact 1491inear feet of stream and 0.00 square feet of Neuse River basin protected riparian buffer to
construct the proposed new culvert installation in the dam. The DWQ has determined that your
application was incomplete and/or provided inaccurate information as discussed below. The DWQ will
require additional information in order to process your application to impact protected wetlands and/or
streams on the subject property. Therefore, unless we receive the additional information requested below,
we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will
place this project on hold as incomplete until we receive this additional information. Please provide the
following information so that we may continue to review your project.
Additional Information Requested:
1. Please provide a location map for the project.
2. Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the
site plan.
3. Please show all wetland impacts including fill slopes on the site plan.
4. Please indicate all buffer impacts on the site plan.
5. Please indicate the location of the protected buffers as overlays on the site plan.
6. Please locate all isolated or non-isolated wetlands, streams and other waters of the State as
overlays on the site plan.
7. Please provide cross section details showing the provisions for aquatic life passage.
8. Please indicate whether or not the proposed impacts already been conducted.
NQStttCazolina
401 Oversight/Express Review Permitting Unit a~~(r~j~~j,
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httn://h2o.enr.state.nc.us/ncwetlands
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Faith Baptist Church
Page 2 of 2
Apri126, 2006
9. Please provide a site plan for the project.
Please respond within three weeks of the date of this letter by sending this information to me in writing
and Eric Kulz of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we
will assume that you no longer want to pursue this project and we will consider the project as withdrawn.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-
1786 if you have any questions regarding or would like to set up a meeting to discuss this matter.
' cerely
w..i
Cyndi Karoly, Supervisor
401 OversightlExpress Review Permitting Unit
CBKlijm
cc: Eric Kulz, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Jay Keller, Keller Environmental, 124 Waiters Way, Youngsville, NC 27596
Filename: 060641 FaithBaptistChurch(Fraukliu)Ou_Hold