Loading...
HomeMy WebLinkAboutNCC191219_NOT Closeout Documents_20220411North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Hertford Project: Underwood Solar Power Plant River basin: Chowan Person financially responsible: Ecoplexus Inc. - Jim Halley, Director of Project #: HERTF-2019-006 Engineering Address: PO Box 13092, Durham, NC 27709 1. Project Location: Underwood Rd, Murfreesboro Pictures: No 2. Weather and soil conditions: 95 degrees, sunny, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one was on -site. Title: Inspection report: Sent Report Date given/sent: August 11, 2021 9. Corrective action needed: None. Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. The project is in compliance and released under the 10. Comments: SPCA. The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) via a Notice of Termination (NOT). The NOT is available at https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: August 09, 2021 Time arriving on site: 11:00 AM Time leaving site: 11:10 AM cc: