HomeMy WebLinkAboutNCC191219_NOT Closeout Documents_20220411North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Hertford Project: Underwood Solar Power Plant River basin: Chowan
Person financially responsible: Ecoplexus Inc. - Jim Halley, Director of Project #: HERTF-2019-006
Engineering
Address: PO Box 13092, Durham, NC 27709
1. Project Location: Underwood Rd, Murfreesboro
Pictures: No
2. Weather and soil conditions: 95 degrees, sunny, wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one was on -site. Title:
Inspection report: Sent Report Date given/sent: August 11, 2021
9. Corrective action needed: None.
Permanent ground cover sufficient to restrain erosion has been established. No additional self -
monitoring or self -inspections are required. The project is in compliance and released under the
10. Comments: SPCA. The permittee must request termination of coverage under the NPDES General Stormwater
Permit for Construction Activities (NCGO1) via a Notice of Termination (NOT). The NOT is
available at https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: August 09, 2021 Time arriving on site: 11:00 AM Time leaving site: 11:10 AM