Loading...
HomeMy WebLinkAboutNCC191368_NOT Closeout Documents_20220411North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Hertford Project: HWY 158 Solar Power Plant River basin: Chowan Person financially responsible: Ecoplexus Inc. - Jim Halley, Director of Project #: HERTF-2019-005 Engineering Address: PO Box 13092, Durham, NC 27709 1. Project Location: Underwood Rd, Murfreesboro Pictures: No 2. Weather and soil conditions: 70 degrees, sunny, dry Initial inspection: No 3.__Usite -currently-under-notice-of violation? -- -No- — 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one was on -site. Title: Inspection report: Sent Report Date given/sent: November 18, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. The project is in compliance and released under the SPCA. 10. Comments: The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) via a Notice of Termination (NOT). The NOT is available at https://edocs.deq.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: November 18, 2021 Time arriving on site: 12:00 PM Time leaving site: 12:20 PM cc: R.OY COOPER Governor L,I A E H S. PISER Secretary R.IAN WREN Director NORTH CAROL€NA Environmental € uality SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT Dear Sir or Madam: Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, Scott Graboski Environmental Specialist (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report North Carolina Department of En,dronmental Quality Division of Energy, Mineral and Land Resources D-E W,asla€€igt n Regional Office �43 Washington Sqe.€are Mall I Washington, North Carolina 2,7W)