Loading...
HomeMy WebLinkAboutWQ0043343_Application Attachment_20220413RECEIVED/NCDECl/DWR APR - 7 2022 WOROS OORESVILLE REGIONAL OFF State of North Carolina lartment of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) (JURISDICTION USE ONLY) Jurisdiction Requesting Flow Acceptance for Collection System: ❑City of Concord ❑City of Kannapolis ❑Town of Harrisburg ❑Town of Mt. Pleasant ®Charlotte Water Project Title, Description, and Number of Lots/Unit: Project Title: Bonnie Cone Leadership Academy — Project # 20216527 Description: The Bonnie Cone Leadership Academy engineering plans and specifications, as prepared and sealed by George A. Genero, NCPE, with Civil & Environmental Consultants, Inc., The Bonnie Cone Leadership Academy located on 16101 Poplar Tent Church Road, Huntersville, NC, with a wastewater discharge of 26,250 GPD. What is the quantity of flow that will be discharged? 26,250 GPD Flow type: ❑ Domestic Commercial 100 ❑ Industrial OA Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC Interceptor connection point. Pump Station (Name or Number) Firm Capacity * MGD (A) Design Average Daily Flow ** (Firm/pf) MGD (B) Approx. Current Average Daily Flow MGD (C) Obligated, Not Yet Tributary Daily Flow MGD D= (B+C) Total Current Flow Plus Obligated Flow MGD (E)=(A-D) Available Capacity*** MGD CLARKE CREEK 1.014 0.406 0.0257 0.0050 0.307 0.099 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with he largest pump taken out of service. **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not less than 2.5. ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where Available Capacity is < 0. Section II. Jurisdiction's Certification Statement: I, Keri Cantrell, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving WSACC interceptor; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving WSACC interceptor normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. KrN;CC- 1/18/2022 Jurisdiction's Signing Official Signature Date Revision Date: 08/09/13