Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout401 Add Info 4.12.2022 Garrison Blvd ext BIMS20220317.docx DocuSign Envelope ID:993E40C8-E981-423C-B55B-E3F2684F9255
v1 S c STATE y\.
ROY COOPER 5' ,� y 0
Governor 6 U _
ELIZABETH S.BISER ii
Secretary *f$` j0`°;
RICHARD E.ROGERS,JR. NORTH CAROLINA
Director Environmental Quality
April 12,2022
DWR#20220317
Mecklenburg County
Garrison Road Holding,LLC
Mr. Steve McCraney,Principal
189 S Orange Avenue Suite 1170
Orlando FL 32801
Mr.Anthony Parker
McCraney Property Company
421 Penman Street Ste 201
Charlotte,NC 28203
Subject: REQUEST FOR ADDITIONAL INFORMATION
Garrison Road Extension,Mecklenburg County
Garrison Road Extension [Catawba River Basin,Mountain Island Lake-Catawba River
sub basin, 11-126-1,Class C]
Dear Mr.McCraney:
The Division of Water Resources has reviewed your submittal for a 401 Water Quality Certification for the
aforementioned project. This small piece of roadway is part of a larger plan of development that will continue when
the road is finished.Review of your application revealed it lacking necessary information required for making an
informed permit decision. The permit application was deficient in the following areas:
• This project proposes another impact to a stream reserved as mitigation source for other stream impacts
in the area by NC DEQ Mitigation.At the time of PCN submittal,no impacts have been approved to this
stream or associated buffers,which are in one of the parcels owned by the applicant and slated for
industrial development,nor has the request appeared or is scheduled to appear in front of the
Interagency Review Team(IRT),which is required.
• McCraney Property Company,applicant,is not listed with the Secretary of State in North Carolina to do
business in the State of North Carolina.Please submit an application where the applicant business is
registered to do business in the State of North Carolina.Garrison Road Holding,LLC is properly
registered but was not used as the applicant.
• Provide documentation for why a bridge is not a feasible alternative
• Culvert design of 5 barrels does not mimic natural stream flow with more potential to degrade stream.A
larger culvert box design with fewer barrels should be instituted.
• Please submit plans that show the entirety of the project,which includes industrial development.
• Provide detailed analysis of all alternate alignments considered so that all alignments can be considered
and the least environmentally damaging(LEDPA)can be selected
• Provide documentation from the USACE for acceptable purpose and need as well as logical termini.
• Provide official documentation that the stormwater plan has been reviewed and approved by the
appropriate delegated program.(City of Charlotte)
• Provide proper phasing for the entire project,which encompasses numerous developments
North Carolina Department of Environmental Quality Division of Water Resources
fro" + 512 North Salisbury Street 1617 Mail Service Center Raleigh,North Carolina 27699 1617
919.707.9000
DocuSign Envelope ID:993E40C8-E981-423C-B55B-E3F2684F9255
Garrison Road Holding, LLC
Request for Additional Information
Page 2 of 2
• Provide official approval of plans for any parts of the project that are to be assumed by NC DOT,more
specifically approval for all hydraulic crossings
• Provide Indirect and Cumulative Impact Analysis for the entire project,which is a large
commercial/residential development and not just the small piece of roadway
Therefore,pursuant to 15A NCAC 2H.0507(a)(5),we will have to place the permit application on hold until we are
supplied the necessary information. You have 30 days to respond in writing with the requested information or
notification to this office that the information is forthcoming. If,at the end of the 30 days,this office has not
received this information in writing,we will assume you are withdrawing your application and it will be returned.
Furthermore,until the information is received by the NC Division of Water Resources,we request(by copy of this
letter)that the US Army Corps of Engineers place the permit application on hold.
Please respond in writing within 30 calendar days of receipt of this letter by sending one(1)copy of all of the above
requested information to the 401 &Buffer Permitting Branch, 1617 Mail Service Center,Raleigh,NC 27699-1617
OR by submitting all of the above requested information through this
link: https://edocs.deq.nc.gov/Forms/Supplemental-Information-Form(note the DWR#requested on the link is
referenced above).
If all of the requested information is not received within 30 calendar days of receipt of this letter,the Division will
be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate
reapplication to the Division for approval,including a complete application package and the appropriate fee.
Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and
any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative
Code.Involvement of permitting agencies during the project development period can help avoid delays in
permitting.
Please contact Donna Hood at(704)682-2839 or donna.hood@ncdenr.gov if you have any questions or concerns.
Sincerely,
—DocuSigned by:
9C9886312DCD474...
Amy Chapman, Supervisor
Transportation 401 &Buffer Permitting
Branch
cc: Jennifer Robertson,Atlas Environmental,Inc.
Scott Jones,USACE Asheville Regulatory Field Office
Janet Mizzi,US Fish and Wildlife Service
David McHenry,NC Wildlife Commission
DWR Transportation 401 &Buffer Permitting Branch file
Donna Hood,Mooresville Regional Office
"r• North Carolina Department of Environmental Quality e Division of Water Resources
Q 512 North Salisbury Street I 1617 Mail Service Center I Raleigh,North Carolina 27699-1617
919.707.9000