Loading...
HomeMy WebLinkAbout20220552 Ver 1_ePCN Application_20220407 DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 6,2021 Ver 4.2 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS#Assigned* Version#* 20220552 1 Is a payment required for this project?* No payment required Reviewing Office* Fee received Winston-Salem Regional Office-(336)776- Fee needed-send electronic notification 9800 Select Project Reviewer* Dave Wanucha:eads\djwanucha Information for Initial Review 1a.Name of project: Replacement of Bridge 80 over UT North Deep Creek on SR 1512. la.Who is the Primary Contact?* NCDOT lb.Primary Contact Email:* 1c.Primary Contact Phone:* wabarrett@ncdot.gov (919)707-6103 Date Submitted 4/7/2022 Nearest Body of Water North Deep Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: Longitude: 36.208231 -80.684100 A. Processing Information County(or Counties)where the project is located: Yadkin Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No (NCDOT only)T.I.P.or state project number: BR-0109 WBS#(') 67109.1.1 la.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No lb.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) lc.Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and interchanges RGP Numbers(for multiple RGPS): Id.Type(s)of approval sought from the DWR: 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No lf.Is this an after-the-fact permit application?* Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No lh.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? Yes No B. Applicant Information ld.Who is applying for the permit? Owner Applicant(other than owner) le.Is there an Agent/Consultant for this project?* Yes No 2.Owner Information 2a.Name(s)on recorded deed: n/a 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 1598 Mail Service Center Address Line 2 City State/Province/Region Raleigh NC Postal/Zip Code Country 27699 US 2e.Telephone Number: 2f.Fax Number: (919)707-6103 2g.Email Address:* wabarrett@ncdot.gov C. Project Information and Prior Project History 1.Project Information 1 b.Subdivision name: (if appropriate) 1c.Nearest municipality I town: Boonville 2.Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 City State/Province/Region Postal/Zip Code Country 3. Surface Waters 3a.Name of the nearest body of water to proposed project:* North Deep Creek 3b.Water Resources Classification of nearest receiving water:* C 3c. What river basin(s)is your project located in?* Yadkin-PeeDee 3d.Please provide the 12-digit HUC in which the project is located. 030401011102 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Undeveloped woods and agricultural land. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* Yes No Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0.08 4g.List the total estimated linear feet of all existing streams on the property: 707 4h.Explain the purpose of the proposed project:* The purpose of the proposed project is to replace a functionally obsolete bridge due to its narrow lanes and insufficient load-carrying capacity.NCDOT Structure Management Unit records indicate Bridge 80 has a sufficiency rating of 55.46 out of 100. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The NCDOT proposes to replace Bridge 80 on Abraham Road(SR 1512)over UT to North Deep Creek in Yadkin County on existing alignment while detouring traffic offsite during construction.The existing structure is 26 feet long and 20 feet wide.NCDOT proposes to construct a single-span bridge 60 feet long and 30 feet wide. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Jim Mason,PWS Agency/Consultant Company: Three Oaks Engineering Other: 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*CO 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of Jurisdicition*2g.Impact (?) area* 1 roadway fill P Headwater Forest WD Yes Corps 0.007 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.000 0.007 2g.Total Wetland Impact 0.007 2i.Comments: This is a mechanized clearing impact to this wetland. 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact ?) Jurisdiction* length* S1 Bank Stabilization Permanent Bank Stabilization SB Perennial Both 40 10 Average(feet) (linear feet) S2 Impervious dike Temporary Dewatering SB Perennial Both 40 101 Average(feet) (linear feet) S3 Roadway widening Permanent Fill SA Perennial Both 5 95 Average(feet) (linear feet) S4 Roadway widening Temporary Fill SA Perennial Both 5 13 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 105 114 3i.Total stream and ditch impacts: 219 3j.Comments: Si and S2 are impacts at Site 1. S3 and S4 are impacts at Site 2. E. Impact Justification and Mitigation 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The proposed bridge will be more than double the length of the current bridge,completely spanning UT to North Deep Creek,thus increasing hydraulic connectivity to the overall system. The bridge will be replaced on existing location. There will be no direct discharge into UT to North Deep Creek,as bridge drainage will be directed to a riprap pad. lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Best Management Practices for Surface Waters will be used during all phases of construction. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2c.If yes,mitigation is required by(check all that apply): DWR Corps 2d.If yes,which mitigation option(s)will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. Yes No 4b.Stream mitigation requested: (linear feet) 4c.If using stream mitigation,what is the stream temperature: 95 warm 4e.Riparian wetland mitigation requested: 4d.Buffer mitigation requested(DWR only): (wren) (square feet) 0.01 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) 4h.Comments Mitigation is proposed for the 95 If of fill/loss of water impacts.Mitigation is not proposed for the 10 If of bank stabilization as there will be no"loss of waters"of the US for this impact. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no,explain why: 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes No Comments: G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* Yes No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* Yes No 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* Yes No 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* Yes No 3b.If you answered"no,"provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement project,this project will neither influence nearby land uses nor stimulate growth.Therefore,a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c.If yes,indicate the USFWS Field Office you have contacted. Asheville 5d.Is another Federal agency involved?* Yes No Unknown 5e.Is this a DOT project located within Division's 1-8? Yes No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g.Does this project involve bridge maintenance or removal? Yes No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? Yes No If you answered"Yes"to 5g(1),did you discover any signs of bat use? Yes No Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* Yes No Si.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPaC,Natural Heritage Program(NHP)Biotics database,field survey. NLEB:4(d)Memo(attached). Schweinitz's sunflower:field surveys(Memo attached). 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NEPA Documentation,and attachments(Archaeology Memo,Historic Architecture Memo,and Tribal Coordination letter). 8. Flood Zone Designation (Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8c.What source(s)did you use to make the floodplain determination?* FEMA Floodmap. Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document BR-0109_Permit Drawings.pdf 4.01 MB BR-0109 Archaeology.pdf 381.29KB BR-0109 Historical Architecture.pdf 220.7KB BR-0109 Tribal Response_Catawba Indian Nation_2020-193-84.pdf 482.11KB BR-0109 Twiman Mitigation Site.pdf 51.83KB BR-0109_CE_Signed May 2020.pdf 3.86MB BR-0109 Cover Letter.pdf 242.99KB BR-0109 2021-11-29 Sunflower Memo.pdf.pdf 1.78MB BR-0109 2019-09-12 NLEB 4(d)Memo.pdf 401.84KB File must be PDF or KMZ Comments BR-0109 will encroach into the conservation easement boundaries of the proposed Twiman Mitigation Site which abuts the existing ROW on both sides of the bridge.The Twiman Mitigation Site has been constructed,but it is presently in monitoring and has not been closed out by the Interagency Review Team(IRT).NCDOT presented the proposed design for BR- 0109 to the IRT on December 8,2020,for review.The IRT determined that the proposed encroachment would result in a loss of mitigation credits from the mitigation bank.However, because the mitigation project had not been closed out,it was decided that the proposed encroachment was allowable,and that the affected credits would be subtracted from the available credits of the mitigation bank at close out.NCDOT will be responsible for compensating the mitigation bank developers for the value of any lost credits.Due to encroachment of the project into the Twiman Mitigation Site,there will be 10.6 Stream Mitigation Units(SMUs)of credit which requires compensation.Information attached. Signature By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Michael Turchy Signature Ilcr��cL 7-605 Date 4/7/2022