Loading...
HomeMy WebLinkAboutNCC221289_ESC Approval Submitted_20220407ROY COOPER C."not FUZABETH S. BiSFR Senrtary MAN WRENN nwn nw Wilson County Public Schools ATTN: Ben Williams PO Box 2048 Wilson, NC 27893 N0QrM CARC, f'M*0 Mrrr+alQuarlry March 17, 2022 LETTER OF APPROVAL RE: Project Name: Wilson CS Track Replacement Phase 2 Acres Approved: 2.70 Acres Project ID: WILSO-2022-009 County: Wilson City: Wilson Address: Old Stantonsburg Road River Basin: Neuse Stream Classification: Other Submitted By: Matthew Roper, Roper Civil Engineering Date Received by LQS: February 17, 2022 Plan Type: New Dear Mr. Williams, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the DEr C"U*WC"W .'M ,r „wt i 0h%k3n01cM-rW.MM""te n %Q WWh swwx" Strew I Rak*k Nwh C005" zft"-wlt qro gar Rrao Letter of Approval Wilson County Public Schools March 17, 2022 Page 2 of 3 Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Letter of Approval Wilson County Public Schools March 17, 2022 Page 3 of 3 Your cooperation is appreciated. Sincerely, Ivana Barham, PE Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Matthew Roper, Roper Civil Engineering Regional Office file