NPDES Permit:
NC0048879
Cary North WWTP
Document Type:
Permit Issuance
Wasteload Allocation
.•- `AII... c . .«r ut ...fi s—.. ..r.-.,.. ..'yam:._ .
<'
Authorization to Construct (AtC)
Permit Modification
Complete File - Historical
Engineering Alternatives (EAA)
Correspondence
Owner Name Change
Instream Assessment (67b)
Speculative Limits
Environmental Assessment (EA)
Document Date:
February 4, 2003
This document is printed on reuse paper - ignore any
content on the reirerse side
Re: Scum Digester Pump Station at the North Cary WRF
P-6b94) iscO k
Subject: Re: Scum Digester Pump Station at the North Cary WRF
Date: Tue, 04 Feb 2003 12:18:41 -0500
From: Mike Templeton <mike.templeton@ncmail.net>
To: "Joseph B. Meeks" <jmeeks@hazenandsawyer.com>
CC: "RBonne@ci. Cary. Nc. Us (E-mail)" <RBonne@ci.cary.nc.us>,
"SBrown@ci. Cary. Nc. Us (E-mail)" <SBrown@ci.cary.nc.us>,
"PRay@ci. Cary. Nc. Us (E-mail)" <PRay@ci.cary.nc.us>,
"Cparishe@Ci. Cary. Nc. Us (E-mail)" <cparishe@ci.cary.nc.us>, Ken Schuster <Ken.Schuster@ncmail.net>
Bennie -
(I indicated on the phone that I would follow up with a letter. In the interest of time, I am replying to your inquiry by this e-mail and do
not plan to send a letter.)
Based on our conversation this morning, I am satisfied that the information you provided with your letter concerning changes in the
North Cary WRF expansion project is sufficient and that no additional submittal or approval is necessary. The proposal is to relocate the
proposed scum digester pump station but is not a substantive change in the design already approved under ATC No. 048879A01.
Therefore, the Town is free to proceed with construction. I will
forward a copy of your submittal to our Raleigh Regional Office and will add my copy to the project file for future reference.
Upon completion of the expansion, be sure to note these design changes on your Engineer's Certification for the project.
- Mike Templeton
"Joseph B. Meeks" wrote:
> Mike:
>
> I sent you a letter today with some attached drawings The letter is requesting guidance in the submission of the Scum Pump Station.
The Scum Pump Station was a part of the North Cary Upgrade previously reviewed by you. The Upgrade Project is delayed but the the
Scum Pump Station (new designation is Scum Digester Pump Station) is needed now so it was broken out of the overall protect. It was
also relocated to adjacent to the existing Scum Thickener.
>
> The question is does the Scum (Digester) Pump Station need to be formally resubmitted?
>++++++++++++++++++++++++++++++++++++++++++++
> Joseph B. Meeks Jr. PE
> (Bennie)
> Senior Associate
> Hazen and Sawyer PC
> Phone: 9)9/833-7752
> Fax: 979/833-7828
Michael E. Templeton, P.E.
North Carolina Division of Water Quality
NPDES Unit
1617 Mail Service Center, Raleigh, NC 27699-1617
919-733-5083 x541 FAX: 919-733-0719
mailto:mike.templeton@ncmall.net
1 of 1 02/04/2003 12:32 PM
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
William G. Ross, Jr., Secretary
Alan W. Klimek, P.E., Acting Director
Mr. Stephen J. Brown, P.E.
Town of Cary
318 North Academy Street
Cary, North Carolina 27512-8005
Dear Mr. Brown:
ATA
NCDENR
July 15, 2002
Subject: Authorization to Construct
ATC No. 048879A01
NPDES Permit No. NC0048879
North Cary Water Reclamation Facility
Wetlands Treatment System
Wake County
The Division of Water Quality's NPDES Unit has reviewed the Town of Cary's request for an
Authorization to Construct an expansion and upgrade of the North Cary Water Reclamation
Facility. After considering the request and additional information provided by the Town and its
consultant, the Division finds the proposed improvements and design to be satisfactory and
hereby grants authorization for construction and installation of the following:
• a third 4.0 MGD-capacity treatment train (Train C), employing the "BioDeniphoo
process with secondary anoxic reactor;" and including 4-stage anaerobic selector,
two phased -isolation oxidation ditches, 2-stage anoxic zone, 2-stage re -aeration
zone, 130 ft. diameter secondary clarifier, and RAS/WAS pumping facilities;
• a second 12.0 MGD-capacity ultraviolet disinfection system;
• an effluent mixed liquor channel for the existing Train A and B bioreactors;
• a motor -operated valve for emergency diversion of peak influent flows (greater than
30 MGD) to the former Digester No. 4;
• a Flow Distribution Structure immediately upstream of Trains A, B, and C;
• a Filter Diversion Box to limit filter feed rate to 24 MGD;
• a Scum Pump Station; and
• all related structures, equipment, piping, controls, and other appurtenances, as
presented in the proposed plans and specifications.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES
Permit No. NC0048879, issued July 31, 2000, and shall be subject to revocation unless the
wastewater treatment facilities are constructed in accordance with this Authorization and the
conditions and limitations specified in the NPDES permit.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
An Equal Opportunity Affirmative Action Employer Internet: http://h2o.enr.state.nc.us/
Telephone (919) 733-5083 FAX (919) 733-0719
Town of Cary
ATC No. 048879A01
Page 3
sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the
terms and conditions of this Permit.
Failure to abide by the requirements contained in this Authorization to Construct may subject
the Permittee to an enforcement action by the Division of Water Quality in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed
by other government agencies (local, state, and federal) which have jurisdiction.
The Permittee shall maintain a copy of the approved plans and specifications on file for the life
of the facility. The Division will forward a copy of the full set of approved plans and
specifications for your records upon issuance of Permit No. WQ0017791.
If you have any questions about this Authorization to Construct, please contact Mike
Templeton, at (919) 733-5083, extension 541.
Sincerely,
Lr1L•
Alan W. Klimek, P.E.
Enclosures: Approved plans and specifications
Engineer's Certification Form
Copies: Mr. Joseph B. Meeks, Jr., P.E. - Hazen & Sawyer
4011 Westchase Blvd., Suite 500
Raleigh, NC 27607
Raleigh Regional Office, Water Quality
Technical Assistance and Certification Unit
Central Files
NPDES Unit Files
ATC SUMMARY
Town of .Cary
North Cary Water Reclamation Facility
ATC No. 048879A01
Neuse River, Class B NSW
Neuse River Basin
Wake County
SCOPE
The Town of Cary proposes to expand and upgrade its existing treatment system to 12 MGD BNR
capacity.
RECOMMENDATIONS
1. Approve the ATC request, received December 4, 2001 and supplemented by several
submittals of additional information.
2. Note that the approval assumes the effluent filters are for solids removal only; they
are not rated for the full 12 MGD if used to denitrify.
3. Recommend that the Town find a better way to dean the digester -turned -
equalization -tank.
PROJECT DESCRIPTION
The Town proposes to make a variety of improvements to bring this treatment plant up to a full 12
MGD capacity. The proposed improvements include construction of:
• a third 4.0 MGD-capacity biological nutrient removal Treatment Train C (BioDenipho®
process with secondary anoxic reactor), including 4-stage anaerobic selectors, two phased -
isolation oxidation ditches, 2-stage anoxic zone, 2-stage re -aeration zone, 130 ft. diameter
secondary clarifier, and RAS/WAS pumping facilities;
• an effluent distribution channel in the existing Trains A and B bioreactors;
• a second 12.0 MGD-capacity ultraviolet disinfection system for Train C;
• a motor -operated valve for emergency diversion of peak influent flows (greater than 30
MGD) to the former Digester No. 4;
• a Flow Distribution Structure immediately upstream of Trains A, B, and C;
• a Filter Diversion Box to limit filter feed rate to 24 MGD; and
• a Scum Pump Station.
REVIEW SUMMARY
The Town submitted its design package in December 2001. The review did not start until April and,
once begun, took longer than normal because of the complexity of the project and several requests
for additional information.
The main issues in the review were largely due to lack of supporting information in the project
submittal, in turn due to a switch in consultants since the existing plant's construction. The new
consultant was not as familiar with the plant's history and so did not provide that perspective in
the submittal. Shortcomings that were eventually addressed included:
NCDENR
PROJECT
CALCULATION SHEET
� nnSeeHEET � OF
PROJ. NO. o4'DO 71/i`d 1
SUBJECT la MAD pPAM8ION U PE `it.
BASIN r etaE PREP. BY M DATE 4#3/0Z
Nonni CARouNA DEPARTMENT OF w ��
ATI.
ENVIRONMENT AND NRAI RESOURCES COUNTY CHKD. BY DATE
i ' ! ; 04ro!..le-tem-fii3 .i‘xe40.44-
•
s j • j •; i 1• i • ��i d
ta.'�0 ►vite0 l Se a t/�C.t ►Z 6:1-4.,�
�1v► � .!TI
•
.e...;e •1 6; f, .
1 • 1
DoCS IZ =Y! N :
's
•
arscts (e"t f lete- s
i I i
•
E rST) P r * 00408A is:v�e V/i/oo7
4.
1w
•
I TY`A !t— _, dc.l� 1
_ 144, t4- !6f r __
.,... , .obli:, !,:
... r La__LJ12
issue.d► S14/0 I
-- ---------- --
bulk w-ed %e ate
up4o PO 000 Apcid u'�o•Ma e-`r�'.�..
il �. _
ra. • 3
—
s
_._ u��:� et� owl �':ni�Q:� L a.. _ 4rT-e M6b cA
/f
w� : e.-
• PROJECT tl ` 4 I4
�ZMA EXP.
PROJ. NO. 0468# I
SHEET Z OF 4-
stkoF Pk)Po Eb I KeR 1� -s 4
CsMS,—rc�c.�-r .► ..... o.�,, htW rixtr1
6 4-0 MEd) eA o c t 'f r r. e 3-4--t4y z as eacca -r�
Tr -;KS k _F3 7Ct.c e$fp +e r -_ $_ + . it G .. a¢-p ..
• 4:1"o.e r ob; c.. tel e_c r
!_ du_ 1 TAict1 ior- C�t1-t—ke3 j �' AkAS+..l.� fso �. 'iDr. ArOC�P.SS
�l t
&Aix; 0.e.rd0t c.
Y __)C +�c�-, o�-o c c. ZA+ke. (
re a Lc la(tct)-I k
S (1.r•Qlci Zero .
Z.° C�,•-r \ 1 ave- __. (i' )C �''1 j- cteti %IL t ttL .
Rfi6 WkS p eit wv-i-e4v3 ctk-÷;0P-s
aASo toe. UICGd ZO
(,CJ
o)_
a e w o- .3 r.t.I c c.,..m .; ..';'o . U �C s ( acr a. •-�,a : t s r
eo.d wut
Uit,e
S-M,bu}4ow box:
Tr* ?4 1 C-
- 4e..u4'l+& 4we s
3* ;1
-- Nam,, SCun'. f L&
g
- Names -E-r; co.1 6143
"frO OA.
— M04 •1 ex! R&S. i ►_Ke-s _ d _e-4-I" der r�b��h;� . c=�.�•e. s:
1:As
--- ens Val., vGtNifi or di e_r• �a� o - � - � r•'i' - 13e.s r
hold► / ''j' ?
PlAbF ='Soto NA4b
Fi War 1 ; nor` a> 7-4- /AO
Pt = 36OtO A6D
f • • PROJECT
PROJ. NO. 04S4 T 7 4M1
SHEET .3 OF 4.
P ` M +rep. w.`''4 -hroa+ , esse4�ACt1 'f'C�.
r fd OSG I�rt�.ie, Wlu � � ,
Sa 4.2 '�'W d L°.Xt S'r S �. 44 mot ! ke L ► T.. _
-i t-e4 4 v ?• w► ti **, k `�
tS SOv�t... C�.q t i �..
co,P �- �- pig -t"i.�, �vls��o„ ss� �d - it ?/ 13.35:1SW'
te r c 0. 124) Mtsb ...(3- 4 As) . '�' 7
ue S .:bv JQ r"' ? ge.d
Pt 4441 g b Ad rt.-rr.--T...,d: - •c,.. i "....- _ MG .._ _ ad a + f yam
Z vre, b+rus k e ade. A -ors etrf -raa 4/30 .9b v, od, A c6 -1. - rot -
t1,.;-, g 1 +O ILO !aG b ar•4 L4 . tzeta w.i± _... r t- l t
714- To a„.. , rot os is 0.<1d 0.3 . },ra#0. 11. 4
�..e. ra-k-c4 c4p .cr o. ►Z » b . I-i' 4 i'tr c. 7a.v.t Q-
04, c L v'e_wc\ at preset.* 411441' -1-1-4. Too ( ; is chin
►`=%.\\ -) e,r l arm v<st p�' ;is CAP":‘
ulociam:n 774 {•,...4 1;w:rks
76•4_ loadwo ; e .+\}ark S po - (e;&1 e. fa v-r,6
wsri.. o r ISI 12 M �5b p cppr ,r --. ra.�� ��i ac_ a. 0�
ezt—t r dtool' PCs. "rke.,e 11 Ao s ter
st,L4,3c1 be. ;4 aL ,- I -Lis teoJ (Pi Ift,es cwt. to-#`ett . p 4b
k.c.s Gat a -K.. cm ,1 tbs. GlitAsey"el :P4,0
are- ah4 �a1 t zy��-. ioa i� , uoV.t, ��, ex � e�- -�-,e. pp+.�►Iz cls tg _ . t ...
Uld+t v ci vt .10ea �s t--a,ti.�1j roe,. t�. e. c c w,,.�,
-�a kt.0.a n }- ,•�0„„zr, `ram-_ "'i-o f rotor es 444 c w-di-o r; Le4
valve~ +D a 0+►,.o.:1-, ra1 d r vet 04.1S } . 0.. )k6b 40 - . b a + . •
r
- is ls.. 5`-Ctu ""Pr ls'e. sew•.- ..wr. or 0-s o
e,v k Y.eerecl f Cd t-f
' PROJECT
PROJ. NO. 0 1 / 4-1 `
SHEET 1 OF 4
C e..vrrC.l
a wi t ero'te sp i�.
4
1►s'1" 04. P o ed i +rogew s . rk.1-1w
by i rkro . )was S fec
I'
•
.Pror". ct-4-4 kstfor1-
Pia-o-S 0.l"C. W*:. DPOeeekf Vv•.dlr
koJrt. 11- r. re-tkre÷ce. MA., Nei S
I\1O+ e..leo-r 1 rtec.# ,ovs c1 ra:,t°La eta
yr ' +- Of4/04-06
.
ows ,ror cd.1Sc uss+ Qg Nib-e.k , 1 5, -Kit
*H-ui ct°.
ice"p 7pro-,^ C -- reSdol t:+1 ciC
-C 1 ��. ar-d coy- e.dore_ vta`
St�ce- wos � ►s less C.{'�'�c� u h
�. ) 2. MG ) ?. !.
1)A4-e—ic.t 47k'iS