Loading...
HomeMy WebLinkAboutGW1-2022-03637_Well Construction - GW1_20220328 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Landon Phillips 14:.WATERZONES Well Contractor Name FROM TO DESCRIPTION 3441 A I`0 ft. JK ft. Z ft. ft. NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells OR LINER if a livable NW Poole Well and Pump Company FROM T DIAMETER THICKNESS MATERIAL Company Name16/ 2.Well Construction Permit#: 1/_� tii" CJ Z 'FROM CASING OR TUBING eothermal closed-1 FROM TO DIAMETER THICKNES.S S 11 MATERIAL ' List all applicable well construction permits 0.e.Ta7C,County,State,Variance,etc.) ft ft is 3.Well Use(check well use): ft. ft. in. Water Supply Well: 17:SCREEN FROM TO DIAMETER SLOTSIZE I THICKNESS I MATERIAL ❑Agricultural ❑Mu cipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) esidential Water Supply(single) f. ft. in. ❑bldustrial/Commercial ❑Residential Water Supply(shared) I8i GROUT ❑IITI ation ❑Wells>100,000 GPD FROM TO MA EMP EMENT METHOD&AMOUNT Non-Water Supply Well: & ft. Z U ft. , �� r ❑Monitoring ❑Recovery ft. ft. Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation ft. ft. 7�4 ❑Aquifer Storage and Recovery ❑Salim Barrier 19.SAND/GRAVEL PACx if a livable [FROM M TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ft. fr. ❑Geothermal(Closed Loop) ❑Tracer DRILLING LOG attack additional sheets if necessa ❑Geothermal(Heating/Cooling Return) ❑Other explain under#21 Remarks) T DESCRIPTION color hardness soiilrock rain size etc. ft rt. e Sd 1 C 4.Date Well(s)Completed: 3U' well ID# tt. rt. C. c t, 5a.Well Location: 6 tr. _ft. �__n —— t k S L G n S'f (r-�f tr y„ rt. ft. J Facility/Owner Ngame ` `� .r Facility ID#(if applicable) ft. ft. 5r I C I 51 � -for(O 11 cl R_(tr,e I J\IrlC_ ft. It, Physical Address,City,and Zip U 'T 6 ( -ft. ft. MAR 2 W /,,&,l'K� 21:REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one Iat/10n is sufficient) 22.Certifreat' ef 6.Is(are)the weil(s): ®Permanent or ❑Temporary Signature ofCertified Well Contractor Date By signing this form,I hereby certify that the ivell(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or ®No IBA NCAC 02C.0100 or 15A NCAC 02C.0300 Well Construction Standards and ilia[a copy Ifthis is a repair,fill out known well construction information and explain the nature ofhhe ofthis record has been provided to the well oivner. repair under#21 remarkr section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: t 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: For multiple wells psi a!!depths tftlierenr(example-3@200'and 2 /00D ( ) Submit this GW-1 within 30 days of(Yell completion per the following: 10.Static water level below top of casing: (ft 24a. For All We1Ls: Original form to Division of Water Resources (DWR), lfwater level is above casing,use"+� ) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 11.Borehole diameter: (in,) 24b.For Injection Wells:Copy to DWR Underground Injection Control(TUC) Rotary Program,1636 MSC,Raleigh,NC 27699-1636 12.well construction method: 24c.For Water Su 1 and O en-Loo e Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where tnstal d FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells aroducing over!!100,000 GPD•Copy to DWR,CCPCUA 13a.Yield m —2 U BIOW Permit Program,1611 MSC,Raleigh,NC 27699-1611 (gP ) Method of test: 13b.Disinfection type: HTH Amount 1 lb. i Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018 r