Loading...
HomeMy WebLinkAboutGW1-2022-03618_Well Construction - GW1_20220401 w ®, NORTH CAROLINA ilk WELL CONSTRUCTION RECORD (GW-1 ) EnvfronmertmfQua(Iry Form GW-1 Well Construction Electronic Form North Carolina Department of Environmental Quality Division of Water Resources November1 Submission ID# G W 1-2022-03618 Are you submitting a scanned form?* Yes No CONTACT INFORMATION ....................................................................................................................... Contact Name* Email Address* Felton Jacobs Felton@Upfrontwells.com Is this a revision to the form you have previously submitted?* Yes No WELL CONSTRUCTION INFORMATION ........................................................................................................................................................................................................................................................................................................................................................................................................................................................ 1.Who is installing these wells?* Owner Well Contractor 1.Well Contractor Information: Certiticate# Cert Level First Name Last Name Company Name 2765 A FELTON JACOBS UPFRONT WELL COMPANY OF THE CAROLINAS 2.Well Construction Permit#: 247951 List all applicable well construction permits(i.e.Monitoring Wells,UIC,County,CCPCUA,etc.) What type of well is this?* Injection Well Non-Water Supply Well Water Supply Well(includes irrigation wells) 3.Water Supply Well* Geothermal (Heating/Cooling Supply) Industrial/Commercial Irrigation Municipal/Public/Community Residential Water Supply(single) Residential Water Supply(shared) Wells> 100,000 GPD 4.Date well was completed and ID# Date Well Completed* Well ID# Well Yield 4/25/2022 15 (gallons per minute)" 5.Well Location Facility/Owner Name* Trabar Homes Facility ID# (Required) (If applicable) County* Parcel Identification No.(PIN) Granville Physical Address* Street Address 1609 Garrett Farm Road Address Line 2 City State/Province/Region Stem NC Postal/Zip Code Country 27581 USA Latitude* 36.2318500000 Longitude*-78.7149370000 Decimal degrees Decimal degrees ........ ... ......... ........................... ........................... ......... ......... ......... ................... 6.Is(are)the well(s):* Permanent Temporary 7.Is this a repair to an existing well:* Yes • No If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. For multiple Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction,only 1 GW-1 is needed. 8a.Indicate TOTAL NUMBER of wells drilled: 1 9.Total well depth below land surface: (ft.) 9a.What is the depth of the casing from ground 404 surface? For multiple wells list all depths if different 24 (example-3@200'and 2@100') in feet 10.Static water level below top of casing: (ft.) 11.Borehole diameter: 15 6 If water level is above casing,use"+" in inches 12.Well construction method: Auger Air Rotary Cable Tool Direct Push Mud Rotary Rotosonic Other 13. FOR WATER SUPPLY WELLS ONLY: 13a.Yield(gpm) 15 13a.Method of test: If applicable Blow 13b. Disinfection type:* 13b.Amount:* HTH 1 LB 14.WATER BEARING/FRACTURE ZONES From To Description 350 351 5 GPM in feet in feet 390 391 10 GPM in feet in feet 15.OUTER CASING(for multi-cased wells)OR LINER(if applicable) From To Diameter Thickness Material 1.00 24.00 6.00 0.188 Galvanized in feet in feet in inches 17.SCREEN .................................. From To Diameter Thickness Material in feet in feet in inches 18.GROUT ............................... From To Material Emplacment Method&Amount 0.00 20.00 Hole Plug Poured in feet in feet 19. SAND/GRAVEL PACK(if applicable) From To Material Emplacment Method in feet in feet 20. DRILLING LOG From To Description(color, hardness,soil/rock type,grain size,etc.) 0.00 3.00 Top Soil in feet in feet 3.00 20.00 Clay in feet in feet 20.00 405.00 Granite in feet in feet 21. Remarks Used hardened steel drive shoe 22.Site diagram or additional well details: You may upload additional well construction information here. pdf only CERTIFICATION INFORMATION ....... ......... ......... ..... ......... ......... ......... ......... ..... ......... * By signing this form, I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23.Certification Signature of Certified Well Contractor