Loading...
HomeMy WebLinkAboutSW4220201_Stormwater Narrative_202203300 LaBeLLa ered by partnership. Hanes Lake —Phase 2 Pfafftown, NC Narrative Clayton Properties Group, Inc plans to construct 182 homes in Phase 2. Stormwater runoff will be treated for quantity by utilizing underground stormtech chambers for detention. Likewise, the stormwater will be treated for quality in the attached downslope bayfilter devices. Seven permanent engineered stormwater control measures (SCMs 1,2,3,4,5,E & 7) have been designed for Phase 2 to ensure the stormwater runoff is adequately treated. Stormwater runoff will also be treated with vegetated swales that have a base width of 2 feet and side slopes of 3H:1V. Channel calculations have been performed for these swales to ensure these measures are stable during a ten year storm event. Respectfully, Paul A. Stimpson, PE Regional Leader/Office Manager 939 Burke Street, Suite H I Winston-SaLem, NC 27101 p (704) 560-8514 www.LabelLapc.com