HomeMy WebLinkAboutNCC221171_ESC Approval Submitted (2)_20220325HE1DERSON COUNW
SOIL EROSION AND SEDIMENT CONTROL DEFACE
March 14, 2022
LETTER OF APPROVAL WITH CONDITIONS
Minkles BRM LLC
ATTN: David Gibbons
7 Parliament Place
Dallas, Texas 75225
RE: Project Name:
Acres Approved:
Project ID:
BRM Stockpile Site
34.85
SESC 2022-02-01
County:
Henderson
City:
Town of Fletcher
Address:
0 Mills Gap Rd (35.433917,-82.486247)
River Basin:
French Broad River Basin
Stream Classification:
Unnamed Tributary of Cane Creek;
Cane Creek 6-57-(9) Class C
Submitted By:
Apel Regnier, EIT
Date Received by HC:
March 14, 2022
Plan Type:
New
Dear Mr. Gibbons,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval
must be posted at the job site. This plan shall expire three (3) years following the date of approval,
if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
processed, you will receive the COC via email. As the Financially Responsible Party shown on
the FRO form submitted for this project, you MUST obtain the COC prior to commencement of
any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please
direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
100 NORTH KING STREET, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521
LETTER OF APPROVAL
MINKLES BRM LLC-BRM STOCKPILE SITE
MARCH 14, 2022
PAGE 2 OF 3
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other permit
or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Assistant Engineer
Soil Erosion & Sedimentation Control Office
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
ec: Ariel Regnier, EIT — Wade Trim
Stan Aiken PE, DEQ — Asheville
LETTER OF APPROVAL
MINKLES BRIM LLC-BRM STOCKPILE SITE
MARCH 14.2022
PAGE 3 OF 3
111
• ZONTING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY, PROJECT
CANNOT BEGIN UNTIL THIS DOCUMENT IS RECEIVED IN THIS OFFICE,
• A DRIVEWAY PERMIT REQUIRED FRO THE JURISDICTION HAVING AUTHORITY
(IF REQUITZED). NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS
PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE.
• OBTAIN NOT FROM NC DEQ AS INSTRUCTED IN TFHS LETTER.
• FOLLOW THE SELF-IN§PECTION, RECORDKEEPING AND REPORTING
REQUIREMENTS DESCRIBED ON SHEET C3.5 OF THE APPROVED DRAWING
"CIVIL SITE DESIGN FOR STOCKPILE SITE FOR BLUE RIDGE METALS" AND
DATED MARCH 14, 2022, WI-11CH IS INCORPORATED INTO THIS LETTER OF
APPROVAL.
• THE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN TITLED
"CIVIL SITE DESIGN FOR STOCKPILE SITE FOR BLUE RIDGE METALS" AND
DATED MARCH 14, 2022IS REFERENCED HERE AND INCORPORTED INTO THIS
LETTER OF APPROVAL.
• PRE -CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE,
CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE.
Financial Responsible Ownership Signature:
Print Name and Title:
Date: M oxcl-, \L\ Z_O-Z_.
100 NORTH KING STREET. SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521