HomeMy WebLinkAboutNCC221139_ESC Approval Submitted_202203253/10122, 2:17 PM
Gmail - Lot 4 & 5 Audubon Village (FN2200047) Approval Email
Matthew Osborne <matthewo@cityofws.org>
To:"dstafford@staffordconstructionco.com°<dstaffordastaffordeonstructionco.com>
Cc: Ronnie Holbrook <mnnieh@cityofws.org>
Number of Recipients:
Senn, 02/25/2022 3:20:43 PM
Sent by: Matthew Osborne
To: dstafford@slaffordconstructionco.com
119
Bec
Subject: Review Completed - Lot 4 & 5 Audubon Village
Attachments:
Application Type: 04.02) Grading/Erosion Control Permit
Workflow: 04.02) Grading & Erosion Control
Project: Lot 4 & 5 Audubon Village
AIP #: EN2200047
Acreage to be Disturbed: 0.46
h ttps://wi n ston-salem. idtpla ns. com/secure/project/?projectid=716792
Hello Stafford Construction Company, LLC.,
Mon, Mar 7, 2022 at 11:04 AM
Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been completed. The design
is adequate to meet the ordinance standards and the plans have bcen approved.
If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership (FRO) form as
applicable. This document is required prior to the issuance of the Grading/Erosion Control Permit. if this has already been provided,
then please disregard this statement. Reminder that a completed FRO form is not required in the instance where a project qualifies to
use the HB 489 Sketch Erosion Control Plan document.
if this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion Control Permit
cannot be issued until documentation is provided that coverage under the NCGOI Construction Stormwater Permit (NPDES) has been
obtained. Please obtain coverage under the permit at the following website (https:lledocs.deq.nc.gov/Forms/NCGOl-NOI). Once
coverage is obtained please upload a copy to the project documents in the electronic plan review system. The Grading/Erosion
Control Permit will not be issued until proof of coverage under NCGO1 is provided.
https:;/mail.gwgic.comimail/WOO?ik=ff6a5d 1474&vicw=pt&search=all&permthid=thread-f%,3A 17266576H6706671 SHI &simp1-msg-f%3A 172665768670667158I ... 113
3110/22,117 PM Gmail - Lot 4 & 5 Audubon Village (EN2200047) Approval Email
As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of Clemmons, Town of
Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land disturbing activity to
determine compliance with the Erosion Control ordinances and the approved Erosion Control Plan. No person shall willfully resist,
delay, or obstruct an authorized representative, employee, or agent of the Erosion Control Division while that person is inspecting or
attempting to inspect a land disturbing activity under the ordinance.
Should you have any questions as you move forward please feel free to contact Matthew Osborne at 336462-7480 or
matthewo@cityofws.org.
Matthew Osborne, CFM, CPESC
Erosion Control/Floodplain Program Manager
City Of Winston-Salem
Field Operations Department
Erosion Control Division
PO Box 2511 (Mailing)
100 E. First Street, Suite 328 (Physical)
Winston-Salem, NC 27101
Office: 336-747-7453
Mobile: 336-462-7480
Fax: 336-727-2792
Electronic Plan Review Application Portal:
https:llwinston-salem.idtplans.comisecure)
Electronic Plan Review Application Instructions:
https:liwinston-salem.idtplans.com/secureltraining/manuatl
NOTICE: l3cgintting May I, 2618, all Grading/Erosion Control, hloodpinin Development, and Watershed Protection Permit
sulinrrttaeis ml:b 1 be submitted electronically.
City of Winston-Salem
ONE TEAM
Committed to Excellence
Ail *-mails including attachments sent to and from this address are subject to being released to the media and the public in accordance with the North Carolina Public Records
I.aw.
Dwayne Stafford<dstaord@staffordconstruchonco.com> Mon, Mar 7, 2022 at 2:21 PM
To: Matthew Osbome <matthewo@cityofws.org>
Thanks. Sorry for the confusion.
[Quoted text hidden]
Dwayne Stafford
President
Stafford Construction Company
https://mail.google.comlmail/WOJ?ik=ff6a5d 1474&view=pt&search=al I&permthid=thread-f%3A 1726657686706671581&simpl=msg-f%3AI726657686706671581,.. 213