Loading...
HomeMy WebLinkAboutWQ0040884_More Information (Requested)_20220324Strickland, Bev From: Watt, Matthew <Matthew.Watt@hdrinc.com> Sent: Thursday, March 24, 2022 12:54 PM To: Lowe, Alexander Subject: [External] RE: Greensboro -Randolph Megasite Attachments: 2022.03.24 FTA-06-21.pdf; page 2 FTA-06-21.pdf; Pages from Fast Track package.pdf; FTSE-10-18.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. As requested here are the sheets with the name change and flow change. Let me know if you need anything else. Thanks Matthew W Watt, PE NC,SC M 336.995.7056 D 336-955-8259 hdrinc.com/follow-us From: Lowe, Alexander <alex.lowe@ncdenr.gov> Sent: Thursday, March 24, 2022 11:28 AM To: Watt, Matthew <Matthew.Watt@hdrinc.com> Subject: Greensboro -Randolph Megasite CAUTION: [EXTERNAL] This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning Matt: Just following up per our phone conversation. After speaking with Jenny about the FTA 06-21 changes, she agrees that the project name should be changed to "Greensboro -Randolph Megasite" on both the FTA (item 11.1) and FTSE forms to reflect the entirety of the project, but she says the total feet of line DOES NOT have to be included on the FTA. That is our responsibility to reflect in the permit, and 1 was mistaken about the need for that change. I also noted that the volume listed in the FTA is 1.33M GPD, but the volume listed on the FTSE is 1.80M GPD. We will obviously need that number to be corrected in whichever place it is incorrect. Whenever you can get those revisions to me is just fine. For now I'm working to get a permit number created with the information I have. Best, Alex Lowe (he/him) Environmental Specialist II Division of Water Resources Department of Environmental Quality Winston-Salem Regional Office i 450 W. Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Cell: (336) 403-4684 Office: (336) 776-9689 2 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: City of Greensboro Water Resources (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Michael Borchers per 15A NCAC 02T .0106(b) Title: Director of Water Resources 4. Applicant's mailing address: 2602 S. Elm -Eugene Street City: Greensboro State: NC Zip: 27406- 5. Applicant's contact information: Phone number: (336) 373-2055 Email Address: Michael.Borchers@,greensboro-nc.gov II. PROJECT INFORMATION: 1. Project name: Greensboro -Randolph Megasite 2. Application/Project status: ❑ Proposed (New Permit) ® Existing Permit/Project If a modification, provide the existing permit number: WQ0040884 and issued date: May 20, 2019, For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Randolph 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.87° Longitude: -79.62° 5. Parcel ID (if applicable): 8718520081 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Matthew Watt License Number: 037518 Firm: HDR Engineering Inc. of the Carolinas Mailing address: 440 S. Church St., Suite 1200 City: Charlotte State: NC Zip: 28202-2075 Phone number: (704) 338-6855 Email Address: matthew.watt@hdrinc.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: T. Z. Osborne Water Reclamation Facility Permit Number: NC0047384 Owner Name: City of Greensboro V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQCS00006 2. Downstream (Receiving) Sewer Information: 18 inch ® Gravity ❑ Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00006 Owner Name(s): City of Greensboro FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® N/A 4. Origin of wastewater: (check all that apply): ❑ Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Food and drink facilities ❑ Church ® Businesses / offices / factories ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool/Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : % Domestic 100 % Commercial % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ® No ➢ If ves, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Factory excluding industrial waste 25 gal/Per employee per shift 1.8M GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 0 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i e , minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 1.8M GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and proiects requiring a variance approval may be subject to longer review times. For proiects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the vroiect. the full technical review is required. 2. Professional Engineer's Certification: I, Matthew Watt , attest that this application for Greensboro -Randolph Megasite (Professional Engineer's name from Application Item III.1.) (Project Name from Application Item 11.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest versionj. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Michael M. Borchers , attest that this application for (Signature Authority Name from Application Item 1.3.) SEAL 037518 Greensboro -Randolph Megasite (Project Name from Application Item II.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 3) 3 /zca_ FORM: FTA 06-21 Page 5 of 5 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Greensboro Project Name for which flow is being requested: Greensboro -Randolph Megasite More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: T.Z. Osborne Water Reclamation Facility b. WWTP Facility Permit #: NC 0047384 All flows are in MGD c. WWTP facility's permitted flow 56.0 d. Estimated obligated flow not yet tributary to the WWTP 0.3100 e. WWTP facility's actual avg. flow 33.93 f. Total flow for this specific request 1.8 g. Total actual and obligated flows to the facility 37.46 h. Percent of permitted flow used 66.90 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Approx. Obligated, Pump Pump Daily Current Not Yet Total Current Station Station Firm Flow** Avg. Daily Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** Big 1.207 0.274 0.062 0.000 0.062 0.212 Stewart A ir:11 11,1 WQ0038555 10.224 4.626 1.52 0.058 1.516 3.110 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): City of Greensboro T.Z.Osborne Downstream Permit Number: NC0047384 Page 1 of 6 FTSE 10-18