Loading...
HomeMy WebLinkAbout20140311 Ver 1_More Info Received_20140422Homewood, Sue From: Chris Brown < Chris Brown@ Mcgillengineers Com> Sent: Tuesday, April 22, 2014 147 PM To: Homewood, Sue Cc: Edwards, Charles N, Parker, Jerry A, Doug Chapman, Shad Walters Subject: Buffer Impacts Attachments: 70817_C -400 STORMWATER PLAN pdf, PCN_Ben Wilson-REVISED PAGE 3 #3D pdf, IMPACT MAP REVISED_22Apr14 pdf I had a call from Jennifer Burdette (NCDENR DWR), whom I spoke with in February about drawing the bubble as a circle on the end, (she had informed me, at that time, that there would be no off set circle where there is wetland since this was the end of the stream and it ended at the wetland), she now has clarified that that is the case when there is mitigation, since there is no mitigation required it is looked at as all buffer (wetland is not to be subtracted out) Sue - please look over the enclosed Exhibit showing the revised buffer impacts Let me know if you concur before I change the PCN and the construction drawings Will you need anew signature on the PCN or Just the revised pages? Also, I have attached the Morinaga property, Stormwater Plan The project is currently under review for Stormwater by the City of Mebane Chuck - once Sue O K's it, do you want us to reissue to you, sheet Number 7 with a revision date or Just a new seal, or let me know how you want that done Once we have the PCN and the plan revised, I will send Craig Brown (USACE) a revised copy as well Christine D. Brown, CPSWO, CPESC Engineering Technician 111 3 t� 1240 191h Street, Lane NW I Hickory, NC 28601 Phone 828 328 2024 1 Fax 828 328 3870 Email chris brown @mcgillengineers com I Website www mcgillengineers com B Project Information and Prior Project History 1 Property Identification 1a Property Identification no (tax PIN or parcel ID) Right of Way 1 b Site coordinates (in decimal degrees) Latitude 36 07527 Longitude 79 2589 1c Property size 578 acres 2 Surface Waters 2a Name of nearest body of water to proposed project unnamed tributary to Haw Creek 2b Water Quality Classification of nearest receiving water WS -V, NSW 2c River basin Cape Fear 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The property runs east/west along the southern boundary of the 1- 40/1 -85 corridor The properties south of the r/w are currently undeveloped, but future development is expected The land is partially cleared and part wooded 3b List the total estimated acreage of all existing wetlands on the property 007 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 56 3d Explain the purpose of the proposed project Presently a property Is land locked, the Project will provide access to a state road The new road will serve the proposed Monnaga Factory site 3e Describe the overall project in detail, including the type of equipment to be used Grading equipment to build approx 2,600 L F of new road, Including cut and fill areas, and placement of pipes for storm drainage 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ro ect includin all rior hases in the ast? ❑X Yes ❑ No ❑ Unknown Comments Field delineated by Consultant and State 4b If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑X Final 4c If yes, who delineated the jurisdictional areas? Name (if known) Mr Craig Brown USACOE, Agency /Consultant Company ECS Carolinas Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Jurisdictional determination was done by Mr Craig Brown with USACOE, and also Ms Sue Homewood with the NCDENR, Div of Water Resources Wetland delineation by ECS,LLP Carolinas 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? El Yes ❑ No ❑X Unknown 5b If yes, explain In detail according to "help file" Instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes X❑ No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4 January 2009 rn� m� 06 Z10 � z lz \_ r 41 \ z I84 N a pail, vjz laz�� z 0 1 � 1 w� N N• � r r rn� m� 06 Z10 � z lz \_ r 41 \ z I84 N a pail, vjz laz�� z 0 1 � 1 w� r_ 0 31-UR 1� 8 00 \ ..._....\ Z \\ �i y 1 � I N N• � r r_ 0 31-UR 1� 8 00 \ ..._....\ Z \\ �i y 1 � I COOL'6ME09 #Hd 122, 6 V VM'aJow Wo3'jlBw6�Djuau,w,An6 ON ]Wllh rf Uvero #011 V d 9 'ONI 'SCl00zl VOlH3V4V VE 3d 'lV3N 'n Ann WNWON :U99NIUN9 dDJ oNiciiina M3N Sm MW A I n 1. !W.V; HMS to z . -I OR 0 WG 9� Z w M N z 0 0 Z WIap z Z w -.98 "61 0 . ot w R 0=, U hi W N WHO Ho 10-ndU az ir H HH, 1 0 t! 0 -6 ml w 0 0 sw ffi kg 9 �rSZ p jP, Z �m , L-7 X m u-1 �g gs NP ---------- rc -2r MH i$ U W P5" vs W.3