HomeMy WebLinkAbout20140311 Ver 1_More Info Received_20140422Homewood, Sue
From: Chris Brown < Chris Brown@ Mcgillengineers Com>
Sent: Tuesday, April 22, 2014 147 PM
To: Homewood, Sue
Cc: Edwards, Charles N, Parker, Jerry A, Doug Chapman, Shad Walters
Subject: Buffer Impacts
Attachments: 70817_C -400 STORMWATER PLAN pdf, PCN_Ben Wilson-REVISED PAGE 3 #3D pdf,
IMPACT MAP REVISED_22Apr14 pdf
I had a call from Jennifer Burdette (NCDENR DWR), whom I spoke with in February about drawing the bubble as a circle
on the end, (she had informed me, at that time, that there would be no off set circle where there is wetland since this
was the end of the stream and it ended at the wetland), she now has clarified that that is the case when there is
mitigation, since there is no mitigation required it is looked at as all buffer (wetland is not to be subtracted out)
Sue - please look over the enclosed Exhibit showing the revised buffer impacts Let me know if you concur before I
change the PCN and the construction drawings Will you need anew signature on the PCN or Just the revised
pages? Also, I have attached the Morinaga property, Stormwater Plan The project is currently under review for
Stormwater by the City of Mebane
Chuck - once Sue O K's it, do you want us to reissue to you, sheet Number 7 with a revision date or Just a new seal, or
let me know how you want that done
Once we have the PCN and the plan revised, I will send Craig Brown (USACE) a revised copy as well
Christine D. Brown, CPSWO, CPESC
Engineering Technician 111
3
t�
1240 191h Street, Lane NW I Hickory, NC 28601
Phone 828 328 2024 1 Fax 828 328 3870
Email chris brown @mcgillengineers com I Website www mcgillengineers com
B
Project Information and Prior Project History
1
Property Identification
1a
Property Identification no (tax PIN or parcel ID)
Right of Way
1 b
Site coordinates (in decimal degrees)
Latitude 36 07527 Longitude 79 2589
1c
Property size
578 acres
2
Surface Waters
2a
Name of nearest body of water to proposed project
unnamed tributary to Haw Creek
2b
Water Quality Classification of nearest receiving water
WS -V, NSW
2c
River basin
Cape Fear
3
Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
The property runs east/west along the southern boundary of the 1- 40/1 -85 corridor The properties south of the r/w are currently undeveloped, but
future development is expected The land is partially cleared and part wooded
3b
List the total estimated acreage of all existing wetlands on the property 007
3c
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 56
3d Explain the purpose of the proposed project
Presently a property Is land locked, the Project will provide access to a state road The new road will serve the proposed Monnaga Factory site
3e Describe the overall project in detail, including the type of equipment to be used
Grading equipment to build approx 2,600 L F of new road, Including cut and fill areas, and placement of pipes for storm drainage
4
Jurisdictional Determinations
4a
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
ro ect includin all rior hases in the ast?
❑X Yes ❑ No ❑ Unknown
Comments Field delineated by Consultant and State
4b
If the Corps made the jurisdictional determination, what type
of determination was made?
❑ Preliminary ❑X Final
4c
If yes, who delineated the jurisdictional areas?
Name (if known) Mr Craig Brown USACOE,
Agency /Consultant Company ECS Carolinas
Other
4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
Jurisdictional determination was done by Mr Craig Brown with USACOE, and also Ms Sue Homewood with the NCDENR, Div of Water Resources
Wetland delineation by ECS,LLP Carolinas
5
Project History
5a
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
El Yes ❑ No ❑X Unknown
5b
If yes, explain In detail according to "help file" Instructions
6
Future Project Plans
6a
Is this a phased project?
❑ Yes X❑ No
6b
If yes, explain
Page 3 of 10
PCN Form — Version 1 4 January 2009
rn�
m� 06
Z10 �
z lz \_
r 41 \
z I84
N a pail,
vjz
laz��
z
0
1 �
1 w�
N
N•
�
r
r
rn�
m� 06
Z10 �
z lz \_
r 41 \
z I84
N a pail,
vjz
laz��
z
0
1 �
1 w�
r_
0
31-UR
1�
8 00 \
..._....\ Z \\
�i
y
1 � I
N
N•
�
r
r_
0
31-UR
1�
8 00 \
..._....\ Z \\
�i
y
1 � I
COOL'6ME09 #Hd 122,
6 V VM'aJow
Wo3'jlBw6�Djuau,w,An6 ON ]Wllh rf Uvero #011 V d 9 'ONI 'SCl00zl VOlH3V4V VE
3d 'lV3N 'n Ann WNWON
:U99NIUN9 dDJ oNiciiina M3N
Sm
MW
A I
n 1. !W.V;
HMS
to z
. -I OR
0
WG 9� Z w
M N
z
0
0
Z
WIap
z
Z
w -.98 "61
0 .
ot
w R 0=, U
hi
W N
WHO Ho 10-ndU az
ir H
HH, 1 0 t!
0
-6
ml w
0
0
sw ffi
kg
9 �rSZ p
jP, Z �m
, L-7
X m u-1
�g
gs
NP
---------- rc
-2r
MH
i$
U
W
P5"
vs
W.3