Loading...
HomeMy WebLinkAboutSW3220304_O&M Agreement/Plan_20220323Operation & Maintenance Agreement Project Name: Project Location: Aldi East Spencer In -bound Traffic Improvements East Spencer, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & co Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: onding O&M sheets will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): No Location(s): No Location(s): Yes Type: De aaaea automaticai JCurb outlet system I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): i Email: Krysta Cearley Vice President, Salisbury Division 1985 Old Union Church Road Salisbury, NC 28146 704-642-0023 krysta.cearle aldi.us ly� Signature: V Date: e�-- I, a Notary Public for the State of N06, h n_ County of do hereby certify that Kru "Wa. CCLY1.CS4 personally appeared before me this day of M' ych top a- and acknowledge the due execution of the perations and Maintenance Agreement. Witness my hand and official seal, w 3 Notary Public N - Rowan County peal STORM-EZ Version 1.5 My commission expires O&M Agreement 2/23/2022 Page 1 of 4 Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area. After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetation Vegetation is too short or Maintain grassed vegetation such that the swale or vegetated too long. area does not erode during the peak flow from the 10-year storm Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re -sod erosive gullies have (or plant with other appropriate species) and water until Vegetated receiving areas formed. established. Provide lime and a one-time fertilizer application. Trees and/or other woody Remove the trees and woody vegetation from the swale, regrade vegetation are present in the swale if necessary and re-establish grass as shown on the the swale. approved plans. Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re -sod erosive gullies have (or plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application. Sediment covers the grass Remove sediment and dispose in an area that will not impact Vegetated conveyances / at the bottom of the swale. streams or SCMs. Re -sod if necessary. swales / roadside ditches (other than curb outlet The side slope is steeper Regrade the slopes to the permitted configuration per the swales) than the approved approved plan and reestablish vegetation. If as -built or existing configuration. conditions do not allow the slopes to be regraded, contact the applicable permitting agency. Grass is dead, diseased or Determine the source of the problem: soils, hydrology, disease, dying. etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Trees and/or other woody Remove the trees and woody vegetation from the vegetated vegetation are present in conveyance, regrade the vegetated conveyance if necessary and the vegetated conveyance. re-establish grass as shown on the approved plans. The longitudinal slope Regrade to meet the permitted longitudinal slope as shown on the exceeds 5%. approved plans. The swale profile does not Regrade the swale to the approved profile as shown on the Curb outlet swales or vegetated areas match the approved detail. approved plans. The length of the swale or Extend the swale to achieve the 100-foot minimum length. If as - vegetated area is less than built or existing conditions do not allow the slopes to be regraded, 100 feet. contact the applicable permitting agency. Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device (if applicable) The outlet device is Repair or replace the outlet device. damaged Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. Discharges from the site The receiving water are causing erosion or sedimentation in the Contact the local NCDEQ Regional Office. receiving water.