Loading...
HomeMy WebLinkAboutSW8070435_Historical File_20080502H�Q� Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Q Coleen H. Sullins Director Division of Water Quality May 2, 2008 Brian Dilsheimer, Manager Dilsheimer Communities of North Carolina, LLC, Manager DCNC North Carolina I, LLC 2528 Indepencence Blvd, Suite #104 Wilmington, NC 28412 Subject: Stormwater Permit No. SW8 070435 MOD The Villages at Turtle Creek - Phases 4 & 5 High Density Subdivision Project Pender County Dear Mr. Dilsheimer: The Wilmington Regional Office received a complete Stormwater Management Permit Application for The Villages at Turtle Creek - Phases 4 & 5 on April 18, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 070435MOD dated May 2, 2008, for the construction of the subject project. This permit modification revises Permit No. SW8 070435, issued September 18, 2007 as follows: 1. Adjusts the drainage area and for the infiltration basins. 2. Revises the allocated built -upon -area. 3. Adjusts the infiltration basin design Please replace the previously approved plan set with the set of plans approved with this permit modification. This permit shall be effective from the date of issuance until September 18, 2017, and shall be subject to the conditions and limitation ns as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christineleck or me at (910) 796-7215. Since ly, Edward Regional Supervisor Surface Water Protection Section ENB/can: S:\WQS\STORMWAT\PERMIT\070435MOD.may08 cc: Eric Seidel, Cavanaugh & Associates, P.A. Pender County Building Inspections Christine Nelson Wilmington Regional Office Central Files Nne orthCarohna Awmridy North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterguality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 070435MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Brian Dilsheimer & Dilsheimer Communities of North Carolina, LLC & DCNC North Carolina 1, LLC The Villages at Turtle Creek - Phases 4 & 5 Intersection of NC 210 and Lodge Hall Road, Surf City, Pender County FOR THE construction, operation and maintenance of two infiltration basins in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit modification revises Permit No. SW8 070435, issued September 18, 2007 as follows: 4. Adjusts the drainage area and for the infiltration basins. 5. Revises the allocated built -upon -area. 6. Adjusts the infiltration basin design Please replace the previously approved plan set with the set of plans approved with this permit modification. This permit shall be effective from the date of issuance until September 18, 2017, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The subdivision is permitted for 94 lots, each allowed a maximum amount of built -upon area as indicated in Section 11.15 and Attachment A of this permit. Page 2 of 9 State Stormwater Management Systems Permit No. SW8 070435MOD 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The basins must be operated with a 50" vegetated filter. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The following design elements have been approved for the two infiltration basin stormwater facilities, and must be provided in the system at all times: Basin 4A Basin 4B a. Drainage Area, acres: 22.42 8.45 Onsite, ft2: 976,425 367,895 Offsite, ft2: None None b. Total Impervious Surfaces, ft2: 408,996 173,485 Lot Built Upon Area, ft2: 259,128 97,857 Roads/Parking, ft2: 119,496 58,163 Sidewalks, ft2: 30,372 17,465 C. Design Storm, inches: 1.5 1.5 d. Basin Depth, feet: 3.00 2.75 e. Bottom Elevation, FMSL: 30.00 37.00 f. Bottom Surface Area, ft2: 23,785 23,833 g. Bypass Weir Elevation, FMSL: 32.00 38.25 h. Permitted Storage Volume, W: 54,786 33,279 i. Type of Soil: Onslow Mandarin j. Expected Infiltration Rate, in/hr: 0.60 1.51 k. Seasonal High Water Table, FMSL: 28.0 34.33 I. Time to Draw Down, days: 1.7 0.4 M. Receiving Stream/River Basin: Becky's Creek/Cape Fear n. Stream Index Number: 18-87-8 o. Classification of Water Body: SA; HQW II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 070435MOD 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 7. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. Access to all components of the system must be available at all times. 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 070435MOD 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 13. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 14. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 15. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 070435, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is indicated in Attachment A of this permit. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations. h. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. i. Built -upon area in excess of the permitted amount will require a permit modification. 18. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 070435MOD III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality signed by both parties involved, accompanied by the appropriate documentation as listed on page 2 of the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 10. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Permit issued this the 2nd day of May, 2008. NORTbVCAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for uoieen H. 6unins, uirector Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 9 State Stormwater Management Systems Permit No. SW8 070435MOD Attachment A. Maximum Built -Upon Area per Lot Lot # i Maximum Built- Upon Area ftz Lot # Maximum Built- Upon Area ft2 Lot # Maximum Built- i Upon Area ft2 127 3,700 159 3,630 191 3,770 128 3,500 160 3,645 192 3,810 129 3,725 161 3,615 193 4,510 130 3,780 162 4,200 j 194 5;015 131 3,785 , 163 3,740 195 4,510 E 132 3,700 164 3,750 196 3,830 133 3,700 165 3,750 197 3,785 134 3,815 166 3,750 198 3,750 135 4,200 167 3,745 ! 199 4,270 136 3,805 168 3,345 200 3,750 137 3,805 169 3,500 201 3,350 138 3,815 170 3,785 202 3,350 139 3,700 171 3,750 203 3,350 140 3,700 172 3,700 204 3,350 141 3,700 173 3,755 205 3,700 142 4,200 174 4,245 206 3,785 143 3,950 175 3,785 207 3,675 144 3,885 176 3,800 208 3,675 145 3,880 177 3,790 209 3,675 146 3,700 178 3,785 210 3,675 147 4,470 179 3,785 211 3,775 148 3,700 180 3,785 212 3,775 149 3,750 181 182 3,675 213 214 3,785 3,785 150 _ 3,750 3,675 151 4,245 183 3,675 215 4,260 152 3,750 184 3,675 216 3,780 153 3,750 185 3,775 217 3,780 154 3,760 186 3,775 218 3,785 155 3,760 187 4,300 219 3,755 156 3,640 188 3,780 220 3,795 157 3,665 189 3,500 158 3,645 190 3,730 Page 7 of 9 State Stormwater Management Systems Permit No. SW8 070435MOD The Village at Turtle Creek Phases 4 & 5 Stormwater Permit No. SW8 070435MOD Pender County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW8 070435MOD Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Pender County Building Inspections Page 9 of 9 DWQ USE ONLY Date Received Fee Paid Permit Number - l -v]*L-I—Abo,po 4 87 I <w 670 Y9 5 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): DCNC North Carolina I, LLC 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): 3. Mailing Address for person listed in item 2 above: jt 0� per Crv,„���� ,k ►.l th CGoliv.o�, LLC, rna not 2528 Independence Blvd. Suite #104 City:Wilmin Ion State:NC Zip:28412 Phone: (910 ) 790-9880 Fax: Email:jbd®dilsheimer.com 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): The Villages at Turtle Creek - Phase 4 & 5 5. Location of Project (street address): NC 210 and Lodge Hall Road City: Surf City County: Pender Zip: 28445 6. Directions to project (from nearest major intersection): From the intersection of US 17 and NC 210, travel East on NC 210 two (2) miles Turn left after Lodge Hall 7. Latitude:340 27 0.45" N Longitude:770 32' 55.24" W of project 8. Contact person who can answer questions about the project: Name:Tom Miner Telephone Number: (610 ) 617-9703 EmaiI:TA4iner@dilsheimer.com H. PERMIT INFORMATION: 1. Specify whether project is (check one): ❑New ❑Renewal ®Modification Form SWU-101 Version 03.27.08 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8 060608 and its issue date (if known) Tuly 20, 2006 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SUP ❑Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control Z404/401 Permit ❑NPDES Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater runnoff from the impervious and non impervious areas will sheet flow to valley curb for eventual discharge to two (2) proposed infiltration ponds by way of swales curb inlets yard inlets and ]iped stormwater conveyance system. 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Property Area: 74.90 acres 4. Total Wetlands Area: 38.52 acres 5. 100' Wide Strip of Wetland Area: 0 acres (not applicable if no wetlands exist on site) 6. Total Project Area**: 36.38 acres 7. Project Built Upon Area: 36.61 % 8. How many drainage areas does the project have? 2 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, co m lete the table with one drainage area for each engineered stormwater device. Basin Information Drainage .Area 1 Drainage Area 2 Receiving Stream Name Becky's Creek Becky's Creek Stream Gass & Index No. SA l�_� - SA Total Drainage Area (sf) 976,425 367,895 On -site Drainage Area (sf) 976,425 367,895 Off -site Drainage Area (sf) 0 0 Existing Impervious* Area (sf) 0 0 Proposed Impervious*Area (sf) 408,996 173,485 % Impervious* Area (total) 41.9% 47.2% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) 259,128 97,857 On -site Streets (sf) 119,496 58,163 On -site Parking (sf) 0 0 On -site Sidewalks (sf) 30,372 17,465 Other on -site (sf) 0 0 _ 0 Off -site (sf) 0 Total (sf): 408,996 173,485 * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (B UA). Form SBVU-101 Version 03.27.08 Page 2 of 4 'Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (BUA). 10. How was the off -site impervious area listed above derived? Computer Generated IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include a1I the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BUT specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from httv://h2o.enr.state.nc.us/su./bmv forms.htm. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off -Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW40140ermeable Pavement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Form SWU-101 Version 03.27.08 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • OriginaI and one copy of the Stormwater Management Permit Application Form fis • Original and one copy of the Deed Restrictions & Protective Covenants Form (if LA S required as per Part IV above) • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP F— A S • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR E AS • Calculations & detailed narrative description of stormwater treatment/management F—AS • Copy of any applicable soils report EA S • Two copies of plans and specifications (sealed, signed & dated), including: ZR S - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm): Cavanaugh & Associates, P.A. Mailing Address:130 North Front Street Suite 202 City: Wilmington State: NC Zip: 28401 Phone: (910 392-4462 Fax: (910 ) 392-4612 Email:eric seidel@cavanaug_hsolutions.com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) T.B. Dilsheimer , certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 21H.1000. A /i Date: 3 �-09 Form SWU-l0J-" Version 03.27.08 Page 4 of 4 P,01 TRANSACTION REPORT 1K MAY-05-2008 MON 09:20 AM >K �K FOR: NCDENR 9103502004 �c � >K �c 1K SEND >K � 1K DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP � >K MAY-05 09:18 AM 93924612 1'31" 10 FAX TX OK 346 1c � >K TOTAL 1M 31S PAGES: 10 �K �c Y 1c>Ic1c1c1c�1c���1c�cicic���>K1c1c�K��c�Xrlc�lc�cic�c1c1c1c�c�K����c>Ic1c1c��1c�c1c�K�1c1c>Ic�c>Ic1c���1c�K��c�c>K�c1c�K��1c>Ic1c��1c�����c>Ic1cic�cic���Kx<��1c�c������ State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor FAX COVER SE EST Date: es To: Cam► N ,4� r �k-r Co: Fax: 41 CC> � �, �i a � `"�� t Z. M.? -3 �� RIMiam G. Russ, Jr., Secretary No. Pages (excl. cover): Express Permitting From: Sandra Exum Phone: l9I0i 796-7265 Fax: (910) 350-2004 127 Cardinal Drivc Extension, Wilmington, NC 28405 a (910) 796-7215 • An Equal Opportunity Affirmative Action Employer �K P. 01 �K �K TRANSACTION REPORT �K �K MAY-02-2008 FRI 01:25 PM �c �c FOR: NCDENR 9103502004 �c SEND �c DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP �K MAY-02 01:23 PM 93924612 1'41" 10 FAX TX OK 335 �t TOTAL : 1M 41S PAGES: 10 State of North Carolina Department of Environment and Natural Resources Wihnlaeton Regional Office Mkhaol F. Easley, Governor {fW 1= � Ross, Jr., Secretary FAX COVER SHICET Date: Hay 2, 2008 No. Pages (exal, cover): 9 Express Permitting TO From: Randxa Exum Co: CavenaWb & Associates, PA Mono: (910) 796-7265 Fax: 910-392-4612 Fax: 010)350-2004 Re: 9=99 wit The Villas s g1 Lic2a Qm&Phases 4 �, CODY to follow 127 Cardinal Drive extrusion, Wihrungron, NC 2W5 . (910) 796.7215 • An Equal Opportentty Affl mauve Action Employer State of North Carolina Department of Environment and Natural Resources Wslinington Regional Office MIchild A Barley, Governor WtWM O. Ross, Jr, secretary FAX COVER WMT Date: No. Pages (exeL cover): 2 Express Permitting To: From: Sandra Exam Co: _ Phone: Q101796-7265 Fax: Fax: (910) 350-2004 Re: 127 Cardinal Drvo Extension, Wilminoan, NC 29405 v (910) 796-7215 a An Hgaal Opporha ity Affirmative Acton Efisployer 4�NNW�M PN AIdM4 �R�MoB HmnvNvAvo NV7d 311S lIV83AQ 'u ra/aaivaoa uanm tlaav3a .ua aans so nwoi N3380 3uaini 1V S30VIIIA 3H1 OD V r saor W lvd Y -i w c n�i !-X. a01-5 it1$i �. w o a�gs Ra> pig, w 0�- i� LETTER OF TRANSMITTAL �I D :.,?R 18 A'."08 DWQ PRQj Date: 4/18/2008 Job No. 041.05.043 Attn.: Christine Nelson Ref.: The Villages at Turtle Creek - Phase 4 & 5 TO: Christine Nelson 127 Cardinal Drive Ext. Wilmington, NC 28405 jE C APR 1 DVIr�. PROD # r» CAVANAU G H Solutions through integrity and partnership The Following ltem(s): a Shop Drawings Cl Prints d Copy of Letter ® Plans P`f ("^nfrnrf 1-7 Plat We are sending you. 0 Attached d Under Separate Cover VIA d Technical Specifications d Pay Application No. Co ies Description 1 Submittal Package w/ $4000 review fee 1 Engineering Report 2 Construction Plans These are Transmitted as Checked Below: ® For Approval ® For Your Use ® As Requested a For Review and Comment d Recommended for Payment d Approved as Submitted 11 Approved as Noted a Returned for Corrections a Resubmit a Submit d For Distribution Prints b Corrected Prints NOTE: Please give me a call if you have any questions or need anything else sent over. Thanks. (910) 392-4462 FROM: Eric Seidel, E.I. Cavanaugh Associates, P.A., 130 N. Front Street, Suite 202, Wilmington, NC 28401 Phone: 910/392-4462 Fax: 910/392-4612 www.cavanaughsolutions.com IFA North Carolina Department of Environment and FT MA Natural Resources Request for Express Permit Review NCDENR For DENR Use ONLY Reviewer: Submit 4-15- Time: 10 Confirm 3 ` 2$ -O FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF Ole) and vicinity map (same items expected in the application package of the project location. Include this form in the application package. b � • Asheville Region Alison Davidson 828-296-4698;alison.davidson(cD-ncmailnet • Fayetteville or Raleigh Region -David Lee 919-7914203; david lee(B-ppmailnet • Mooresville & -Patrick Grogan 704-663-3772 or patrick.grogan(aD-ncmail net • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardisone-ncmail.net • Wilmington Region -Janet Russell 910450-2004 or janetrussell0mcmail not NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name:1 If,'Qg5$ AT TURTLE CREEK PI-tA�E��a''6-� County: PENDER Applicant: Tom Miner (Representative) Company: DCNC North Carolina I, LLC Address: 401 CITY AVENUE City: BALA CYNWYD, State: PA Zip:19004-1150 Phone:610-617-9700 Fax:610-617-9933 Email: tminer(cDdilsheimer.com ®E C I y Project is Drains into : - - ;graters Project Located in Cape Fear River Basin ED Engineer/Consultant: Eric Seidel Company: Cavanaugh &Associates, PA MAR 2 5 2008 Address:130 N. FRONT STREET City: WILMINGTON, State: NC Zip: 28401 Phone: 910-392-4462 Fax::910-392-4612 Email: eric.seidel(cD_cavanaughsolutions.com PROJ # DWQ (Check all that apply) ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: ❑ Stream Origin Determination: # of stream calls — Please attach TOPO map marking the areas in questions ® State Stormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _# Treatment Systems #T OW ms ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —Constructive Wetlands —# Treatment Systems ❑ High Density -Other _ # Treatment Systems ❑ MODIFICATION SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with acres to be disturbed.(CK # (for DENR use)) WETLANDS QUESTIONS MUST BE ADDRESSED BELOW ® Wedands (401): Check all that apply Isolated wetland on Property ® Yes ❑ No Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: acre(s) Wetlands Delineation has been completed: ❑ No Minor Variance: ® No ❑ YES US ACOE Approval of Delineation completed: ` Yes�] No Major General Variance ® No ❑ YES 404 Application in Process wl US ACOE: IZ Yes ❑ No 401 Application required: ®Yes ❑ No if YES, ® Regular Permit Received from US ACOE ® Yes ❑ No Perennial, Blue line stream, etc on site ❑ yes Z No For DENR use only Fee Split for multiple permits: (Check # A Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance ❑ Ma'; ❑ Min) $ SW ❑ HD, ❑ LD, ❑ Gen $ 401: $ LQS $ Stream Deter,_ $ ................ THE VILLAGES AT TURTLECREEK TOWN OF SURF CRY, ERCO Ilk NORTH CARO ry MANHOLLOW CHU 46 OAD ,we us 17 V. BF-Ck (yq E�K PEE PRox. PROJECT I Lol I r% OP ROA NC 210 t ko `7 %ATION bi FACILITY LO( PROJECT INFORMATION NOTTO SCALE PROJECT _NAME 34- 27,21.52"N LATITUDE: 770 34! 52-13(yl w LONGITUDE: QUAD #: HOLLY RIDGE QUADRANGLE STREAM CLASS: SA; HOW RECEIVING STREAM: BECKYS CREEK CAPE FEAR PRO."C& BASIN, STREAM INDEX: CAVANAUGHeupn clof I A—dWKPA 130 =1&,.o Sub 202 Wo.kvmmc II 11 ,,,"121- 91OM"12 u u MAK2 5 2008 DWO PROD # Hsu .s NV7d 311S 17b213A0 d!4Euowmd Pus AWftul 46noag suopnloS >133N0 3118n1 1V S30VIIIA 3H1 0 8meop«A.1.9 wwulmg� B��o1�' m 8==�Sa��F88$g n$�m14.da�8�>$R `gi a W�ssxg"sgs�5����s9����"s�3R;g sa O m Z O m ~� Wj {{ � �sRam=.sa„rass�aa a � _ U � Zw J z a uxoNs sr ti SV3 rrom 1 roN a No w Holum 8 HER DECEIVE MAP, 2 5 200 DWO PROJ # y NV1d 311S 77V83AO dlLl— M pue A1NB%+l y6na4{ suoW4ob` f, 3SVHd HmnvNVAVO N33N,0 2uanl 1V S30V77ln 3W wsaas sr a 9 n I d no�ar+ro mx � soot = Hum S USES€89 o 9' NV7d 311S 71V83AO dILI—I ed Pus kpBmul g6nmgt suoonlos B 3SVHd ws eo H rE3 n d N d^d M vNrroar,� canon .wvnoo d sve .wo AMAMwwi >133N0 371N(11 1V S39V711A 3H1 '�' 07 auv xauso®o 1nx im e=TV/ m arr asro a � 3 �o a� TJRTLEC�2EEK TOWN OF SURF CITY, PENDER COUNTY, NORTH CAROLINA PHASES 4 & 5 STORMWATER MANAGEMENT HIGH DENSITY EXPRESS PERMIT REQUEST NARRATIVE March 24, 2008 CAVANAUGH Solutions through integrity and partnership We provide superior client service and environmentally sound designs through integrity, communication and partnership. Consulting Engineers Land Surveyors Environmental Professionals Design Professionals 130 N. Front Street, Suite 202, Wilmington, North Carolina 28401, Phone 910/392-4462, Fax 910/392-4612 C E I V E 0 MAP, 2 4 2008 DWQ PROJ # TABLE OF CONTENTS PAGE I. SITE DESCRIPTION 2 II. PROJECT DESCRIPTION 3 III. STORMWATER MANAGEMENT PLAN 3 IV. ABOVE -GROUND INFILTRATION 4 BASIN MAINTENANCE AGREEMENT V. CONSTRUCTION SCHEDULE 5 & VEGETATION PLAN E C E I V E MAR 2 4 2008 I'ROJ # DWQ The Villages at Turtle Creek 1 Of 5 Stormwater Management High Density Permit Application Narrative Site Description The subject development, formally identified as The Villages at Turtle Creek, is located in the Town of Surf City, Pender County, North Carolina. The 248.2 (+/-) acre property has frontage along NC 210 and US Highway 17. Please note that the site will be permitted and constructed in multiple phases, and the current application is for the t pp 1 �tY r ted HMV z .-T I j744!� 1ff for Phases 4 and 5 only. Phases 4 and 5 have a limit of disturbance of approximately 37 acres and an assessed drainage area of approximately 33 acres. A modification has been proposed for this permit due to the realignment of Turtle trleva!, which has slightly altered previously approved impervious surface area totals. The proposed road realignment was necessitated for continued coordination with the Army Corps of Engineering and the ongoing Individual Wetlands Permit application that is currently underway. In addition, grading of the land has been updated to better bayanve the mass vo.!,.j,, ie for The changes in grading to the phase have altered the drainage boundaries for the proposed management devices as well as the stormwater conveyance system. The site is currently undeveloped and heavily forested with Army Corp of Engineer approved 404 wetlands located throughout the property. Currently, the site drains by way of overland flow through the wetlands for ultimate discharge to Becky's Creek. �1 �;?fc �f"A The property can be described as mildly sloping, with an average slope of approximately 1.0%. The elevations throughout the property range from 9 ft mean sea level (MSL) near the wetlands to 65 ft MSL towards US 17. It is important to note that the area proposed within Phases 4 and 5 ranges in elevation from 29 ft MSL to approximately 49 ft MSL. The geotechnical site review conducted by an independent soil scientist found seasonal high water table elevations (SHWTE) r '' 4.. sk-A below ground surface (BGS) in this phase. Estimated infiltration rates between 0.42 in/hr and 1.51 in/hr were determined by the soils evaluation. Mr. Vincent Lewis from the North Carolina Department of Environment and Natural Resources, Division of Water Quality (NCDENR-DWQ) fir Project Description D E C F I V E The Villages at Turtle CreekIVIA 2 of 5 Stormwater Management High Density Permit Application DWO PROJ # — Phases 4 and 5 of this multi -phased development consist of the construction of a portion of the subdivision containing 94 single family homes. These phases will include approximately 288,261 ft2 of rooftop area, 60,069 ft2 of driveway area, 62,957 ft2 of sidewalk area, and 174,418 ft2 of street and gutter area. Pursuant to the watershed classification of the site, HQW:SA, the project will employ infiltration type best management practices (BMPs). ecffallr, (*? Stormwater from the tributary drainage areas, as identified within the submission documents, will travel by sheet and shallow concentrated flow to a series of flat grate curb and yard inlets for eventual discharge to the two (2) proposed stormwater management basins. Stormwater will be collected and conveyed from these inlets through a series of HDPE & RCP. * TOTAL DRAINAGE AREA: 1,377,533 ft2 = 31.62 acres = 32 acres Impervious Areas Pro'ect Built U on Area — BUA Dwellings and Driveways: 348,330 = 8.00 acres Sidewalk: 62,957 ft2 = 1.45 acres Street and Gutter: 174,418 ft2 = 4.00 acres Calculation 8.00 + 1.45 + 4.00 acres = 13.45 acres impervious 13.45 acres (Impervious)/37 acres (Total LOD) = 0.36354 24.41 01;, P* Stormwater Management Plan Collection and Conveyance: The residential lots, roads and streets will be graded so that runoff enters the stormwater management system by way of sheet flow over the residential lots and roadway system and shallow concentrated flow within the valley curb to the curb and yard inlets. From these inlets, the stormwater will be conveyed by way of the aforementioned HDPE & RCP for discharge to the two (2) strategically - placed stormwater management basins. Please note, runoff from the rooftops will be collected by down spouts and directed to the right-of-way, as specified within the notes, where the runoff will then enter the stormwater management system. Yard inlets will also be utilized where necessary to collect runoff in the grassed and landscaped areas. Treatment: The Villages at Turtle Creek 3 of 5 Stormwater Management High Density Permit Application The project site is located in a coastal county and within Y2 mile of SA:HQW waters. Therefore, the project requires stormwater to be treated with an infiltration type system. After discussions with NCDENR-DWQ's staff, it has been determined that the best option for stormwater treatment for this project is infiltration basins. The SHWTE investigation confirmed that the proposed locations of the two (2) infiltration basins are appropriate for this type of BMP. As mentioned previously, the two (2) proposed locations had SHWTEs of 24 and 32 inches BGS. 4 -:a +d n i r cry _sins-desig to°tread the- rsf rt f.._Tal "Off-line" bypass systems will divert excess runoff from large storm events to the wetlands f� i IF u l �tpaf#_=We�E �; Mf vegetative filters will be used to discharge runoff in excess of the 1.5" volume into the existing 404 jurisdictional wetlands at the east and north corners of the treatment areas for Basins 4A and 4B, respectively. As well, Basin 4A soils will be excavated to the SHWTE and backfilled with suitable infiltrative soils to increase infiltration rates in the basin location. The proposed stormwater management system will be redesigned in accordance with NCDENR requirements and will not adversely affect any downstream drainage patterns. Above -Ground Infiltration Basin Maintenance Agreement 1. Stormwater management facilities shall be regularly maintained to ensure they function at design capacity and to prevent health hazards associated with debris build-up and stagnant water. The privately -owned portion of the system must be privately maintained. 2. Responsibility for operation and maintenance of stormwater facilities, including periodic removal and disposal of accumulated particulate material and debris, but not limited to the following: visual inspection of all system components at least twice each year; vacuuming of all storm sewer inlets once every six months (frequency of vacuuming may be adjusted to once a year if first year maintenance records indicate that sediment and debris accumulation is insignificant); reverse flushing and vacuuming if system inspections indicate significant accumulation of sediment in the pipes; and periodic removal and disposal of other material and debris shall remain with the owner or owners of the property, with permanent arrangements that shall pass to any successive owner, unless assumed by a governmental agency. 3. In the event that the facility becomes a danger to public safety or public health, or if it is in need of maintenance, the owner shall effect such maintenance and repair of the facility in a manner that is approved by the township engineer or his designee. If the owner fails or refuses to perform The Villages at Turtle Creek 4 of 5 Stormwater Management High Density Permit Application such maintenance and repair, the municipality may immediately proceed to do so in accordance with the maintenance bond. Additional Information Construction Schedule 1. Perform construction stake out. 2. Install temporary gravel construction entrance. 3. Clear site, but do not grub. 4. install all erosion and sediment control measures. 5. Grub site. 6. Construct sediment traps. 7. Commence rough grading of the site. 8. Install stormwater management appurtenances inclusive of infiltration basins. 9. Construct sewer collection system. 10. Construct water system. 11. Rough grade the site. 12. Shape shoulders and cut -and -fill slopes. 13. Scarify, seed, fertilize, and mulch all disturbed areas. 14. Install dry utilities (electrical, fiber-optic, cable, phone, etc.). 15. Re -scarify, re -seed, re -fertilize and mulch all disturbed area. 16. Construct roadbed base course and intermediate asphalt course. 17. Apply final asphalt course. 18. After disturbed areas are stabilized with vegetation, the contractor shall return to the site and remove all temporary erosion control measures. Vegetation Plan 1. The contractor shall provide seeding and mulching on all disturbed areas within fifteen (15) working days following the completion of any phase of grading. Seeding requirements shall include soil preparation, seed mixtures, and mulching. 2. Contractor shall provide sod cover on all areas or comply with permanent seeding schedule. The Villages at Turtle Creek 5 Of 5 Stormwater Management High Density Permit Application about:blank The Villages At Turtle Creek, Phase 4 & 5 March 27, 2008 Gentlemen: The Express stormwater submittal meeting has been scheduled with Christine Nelson on April 8, 2008 at 10:00 AM here in the Wilmington Regional Office. The applicant is required to attend the meeting. Please be sure to use the latest stormwater application form, supplement sheets, initialed check sheet, maintenance agreements, etc. from the BMP web site. The link for the web site is contained in the attachment, "submittal requirements". Please respond within 2 business days to confirm and reserve the submittal date / time. Thanks, Janet Russell Express Coordinator 1 of 1 3/27/2008 1:36 PM about:blank Eric: I'm sorry; I forgot that you wanted the week of April 14th. But, that's no problem. Christine Nelson can meet with you on April 15th at 10:00 AM here in the Wilmington Regional Office. If that's O.K., let me know and we'll finalize the calendar. Thank you, Janet Eric Seidel wrote: Janet, I appreciate the quick response and turn around. For all parties on our end to be able to make the meeting we would like to request the week of April 14th. I apologize if this causes you any inconvenience. Please give me a call if you have any questions or need anything else sent over. Thanks. Eric Seidel, E.I. Cavanaugh & Associates, P.A. (910) 392-4462 -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Thursday, March 27, 2008 1:42 PM To: Eric Seidel; tminer@dilsheimer.com Subject: The Villages At Turtle Creek, Phase 4 & 5 *The Villages At Turtle Creek, Phase 4 & 5* March 27, 2008 Gentlemen: The Express stormwater submittal meeting has been scheduled with *Christine Nelson on April 8, 2008 at 10:00 AM *here in the Wilmington Regional Office. The applicant is required to attend the meeting. Please be sure to use the latest stormwater application form, supplement sheets, initialed check sheet, maintenance agreements, etc. from the EMP web site. The link for the web site is contained in the attachment, "submittal requirements". Please respond within 2 business days to confirm and reserve the submittal date / time. Thanks, Janet Russell Express Coordinator 1 of 1 3/27/2008 3:14 PM about:blank Eric, you're all set for the 15th. Janet Eric Seidel wrote: Janet, April 15th works great for everyone here. Thanks for working with us. Please send me a confirmation when everything is scheduled. ID -----Original Message ----- From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Thursday, March 27, 2008 3:14 PM To: Eric Seidel Cc: tminer@dilsheimer.com Subject: Re: The Villages At Turtle Creek, Phase 4 & 5 Eric: I'm sorry; I forgot that you wanted the week of April 14th. But, that's no problem. Christine Nelson can meet with you on April 15th at 10:00 AM here in the Wilmington Regional Office. If that's O.K., let me know and we'll finalize the calendar. Thank you, Janet Eric Seidel wrote: Janet, I appreciate the quick response and turn around. For all parties on I end to be able to make the meeting we would like to request the week I of April 14th. I apologize if this causes you any inconvenience. Please give me a call if you have any questions or need anything else sent over. Thanks. Eric Seidel, E.I. Cavanaugh & Associates, P.A. (910) 392-4462 -----Original Message ----- From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Thursday, March 27, 2008 1:42 PM 1 of 2 3/28/2008 9:14 AM about:blank To: Eric Seidel; tminer®dilsheimer.com Subject: The Villages At Turtle Creek, Phase 4 & 5 *The Villages At Turtle Creek, Phase 4 & 5* March 27, 2008 Gentlemen: The Express stormwater submittal meeting has been scheduled with *Christine Nelson on April 8, 2008 at 10:00 AM *here in the Wilmington Regional Office. The applicant is required to attend the meeting. Please be sure to use the latest stormwater application form, supplement Isheets, initialed check sheet, maintenance agreements, etc. from the t3MP web site. The link for the web site is contained in the attachment, I'submittal requirements Please respond within 2 business days to confirm and reserve the submittal date / time. Thanks, Janet Russell Express Coordinator 2 of 2 3/28/2008 9:14 AM RE: Turtle Creek, 4 & 5 Subject: RE: Turtle Creek, 4 & 5 From: "Eric Seidel"<eric.seidel@cavanaughsolutions.com> Date: Fri, 28 Mar 2008 11:23:30 -0400 To: "Janet Russell" <Janet.Russell@ncmail.net> Janet, Vince has been out there and reviewed the 2 locations for the infiltration basins. This Phase was submitted and approved approx. 1 year ago. The developer asked us to do a redesign, so we are now submitting for a brand new permit. However, we have not changed the locations of the two infiltration basins. The soils report with Mr. Lewis's findings will be part of our submittal package. Thanks for the heads up. Eric -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Friday, March 28, 2008 11:13 AM To: Eric Seidel Subject: Turtle Creek, 4 & 5 Eric: Did I asked you if our soil scientist, Vince Lewis has specifically looked at the 2 locations for the 2 newly proposed infiltration basins? If he hasn't, we need to get him scheduled to go up there again before the 15th. I'm attaching an Infiltration Site Visit Request form to this email. This is what I need to get Vincent started. If you're not sure whether he's looked at these sites or not, please contact your soil's consultant (Josh?). Vince felt that he would know. Janet 1 of 1 3/28/2008 12:01 PM THE VILLAGES AT T-.JRT EC -'RE I� TOWN OF SURF CITY, PENDER COUNTY, NORTH CAROLINA PHASES 4 & 5 STORMWATER MANAGEMENT HIGH DENSITY EXPRESS PERMIT REQUEST NARRATIVE April 17, 2008 C AVA N A U C; SokAons through integrity and partnership We provide superior client service and environmentally souk designs through integrity, communication and partnership. Consulting Engineers Environmental Professionals 130 N. Front street, suite 202, Land Surveyors Design Professionals North Carolina 28401, Phone 81002-4462, Fax 910/392-4612 TABLE OF CONTENTS PAGE I. SITE DESCRIPTION 2 II. PROJECT DESCRIPTION 3 III. STORMWATER MANAGEMENT PLAN 3 IV. ABOVE -GROUND INFILTRATION 4 BASIN MAINTENANCE AGREEMENT V. CONSTRUCTION SCHEDULE 5 VI VEGETATION PLAN 5 VII. APPENDIX 6 The Villages at Turtle Creek ] Stormwater Management High Densit+l Permit Application Narrative I. Site Description The subject development, formally identified as The Villages at Turtle Creek, is located in the Town of Surf City, Pender County, North Carolina. The 248.2 (+/-) acre property has frontage along NC 210 and US Highway 17. Please note that the site will be permitted and constructed in multiple phases, and the current application is for the modification of the previously approved State Stormwater Permit (SW8 070435) dated September 18, 2007 for Phases 4 and 5 only. Phases 4 and 5 have a limit of disturbance of approximately 36.5 acres and an assessed drainage area of approximately 31 acres. A modification has been proposed for this permit due to the realignment of Turtle Creek Boulevard, which has slightly altered previously approved impervious surface area totals. The proposed road realignment was necessitated for continued coordination with the Army Corps of Engineering and the Individual Wetlands Permit application that is currently underway. In addition, grading of the land has been updated to better balance the mass volumes for these phases of the development. The changes in grading to the phase have altered the drainage boundaries for the proposed management devices as well as the stormwater conveyance system. The site is currently undeveloped and heavily forested with Army Corp of Engineer approved 404 wetlands located throughout the property. Currently, the site drains by way of overland flow through the wetlands for ultimate discharge to Becky's Creek. Becky's Creek has a watershed classification of SA:HQW as confirmed by DENR-DWQ on July 24, 2006. The property can be described as mildly sloping, with an average slope of approximately 1.0%. The elevations throughout the property range from 9 ft mean sea level (MSL) near the wetlands to 65 ft MSL towards US 17. It is important to note that the area proposed within Phases 4 and 5 ranges in elevation from 29 ft MSL to approximately 49 ft MSL. The geotechnical site review conducted by an independent soil scientist found seasonal high water table elevations (SHWTE) ranging from 24 to 32 inches below ground surface (BGS) in this phase. Estimated infiltration rates between 0.42 in/hr and 1.51 in/hr were determined by the soils evaluation. Mr. Vincent Lewis from the North Carolina Department of Environment and Natural Resources, Division of Water Quality (NCDENR-DWQ) also tested the site for the SHWTE on August 15, 2006, and found the depth to SHWTE ranged from approximately 24 to 32 inches BGS, which is in accordance with the soil scientist's geotechnical report. The Villages at Turtle Creek 2 Stormwater Management High Density Permit Application II. Project Description Phases 4 and 5 of this multi -phased development consist of the construction of a portion of the subdivision containing 94 single family homes. These phases will include approximately 356,985 ft2 of dwelling and driveway area, 47,837 ft2 of sidewalk area, and 177,659 ft2 of street and gutter area. Pursuant to the watershed classification of the site, High Quality Waters: SA (HQW:SA), the project will employ infiltration type best management practices (BMPs). Specifically, two (2) infiltration basins are proposed. Stormwater from the tributary drainage areas, as identified within the submission documents, will travel by sheet and shallow concentrated flow to a series of flat grate curb and yard inlets for eventual discharge to the two (2) proposed stormwater management basins. Stormwater will be collected and conveyed from these inlets through a series of HDPE & RCP. TOTAL DRAINAGE AREA: 1,344,320 ft2 = 30.86 acres — 31 acres Impervious Areas (Project Built Upon Area — BUA) Dwellings and Driveways: 356,985 ft2 = 8.20 acres Sidewalk: 47,837 ft2 = 1.10 acres Street and Gutter: 177,659 ft2 = 4.08 acres Calculation 8.20 + 1.10 + 4.08 acres = 13.38 acres impervious 13.38 acres (Impervious)/36.38 ac. (Total LOD) = 0.3678436.78% Project BUA III. Stormwater Management Plan Collection and Conveyance: The residential lots, roads and streets will be graded so that runoff enters the stormwater management system by way of sheet flow over the residential lots and roadway system and shallow concentrated flow within the valley curb to the curb and yard inlets. From these inlets, the stormwater will be conveyed by way of the aforementioned HDPE & RCP for discharge to the two (2) strategically - placed stormwater management basins. Please note, runoff from the rooftops will be collected by down spouts and directed to the right-of-way, as specified within the notes, where the runoff will then enter the stormwater management system. Yard inlets will also be utilized where necessary to collect runoff in the grassed and landscaped areas. The Villages at Turtle Creek 3 S"torrnwater Management High Density Permit Application Treatment: The project site is located in a coastal county and within 'h mile of SA:HQW waters. Therefore, the project requires stormwater to be treated with an infiltration type system. After discussions with NCDENR-DWQ's staff, it has been determined that the best option for stormwater treatment for this project is infiltration basins. The SHWTE investigation confirmed that the proposed locations of the two (2) infiltration basins are appropriate for this type of BMP. As mentioned previously, the two (2) proposed locations had SHWTEs of 24 and 32 inches BGS. Basins 4A and 4B are infiltration basins designed to treat the first 1.5" of rainfall runoff. "Off -fine" bypass systems will divert excess runoff from large storm events to the wetlands. Rip rap aprons will be used to dissipate the velocity of the incoming runoff, and level spreaders will be used to prevent channelized flow at the entry points to the basins as well as at the bypass box discharges. 50' vegetative filters will be used to discharge runoff in excess of the 1.5" volume into the existing 404 jurisdictional wetlands at the east and north corners of the treatment areas for Basins 4A and 46, respectively. As well, Basin 4A soils will be excavated to the SHWTE and backfilled with suitable infiltrative soils to increase infiltration rates in the basin location. The proposed stormwater management system will be designed in accordance with NCDENR requirements and will not adversely affect any downstream drainage patterns. IV. Above - Ground Infiltration Basin (Maintenance Agreement 1. Stormwater management facilities shall be regularly maintained to ensure they function at design capacity and to prevent health hazards associated with debris build-up and stagnant water. The privately -owned portion of the system must be privately maintained. 2. Responsibility for operation and maintenance of stormwater facilities, including periodic removal and disposal of accumulated particulate material and debris, but not limited to the following: visual inspection of all system components at least twice each year; vacuuming of all storm sewer inlets once every six months (frequency of vacuuming may be adjusted to once a year if first year maintenance records indicate that sediment and debris accumulation is insignificant); reverse flushing and vacuuming if system inspections indicate significant accumulation of sediment in the pipes; and periodic removal and disposal of other material and debris shall remain with the owner or owners of the properly, with permanent arrangements that shall pass to any successive owner, unless assumed by a governmental agency. The Villages at Turtle Creek 4 Stormwater Management High Density Permit Application 3. In the event that the facility becomes a danger to public safety or public health, or if it is in need of maintenance, the owner shall effect such maintenance and repair of the facility in a manner that is approved by the township engineer or his designee. If the owner fails or refuses to perform such maintenance and repair, the municipality may immediately proceed to do so in accordance with the maintenance bond. V. Construction Schedule 1. Perform construction stake out. 2. Install temporary gravel construction entrance. 3. Clear site, but do not grub. 4. Install all erosion and sediment control measures. 5. Grub site. 6. Construct sediment traps. 7. Commence rough grading of the site. 8. Install stormwater management appurtenances inclusive of infiltration basins. 9. Construct sewer collection system. 10. Construct water system. 11. Complete rough grade of the site. 12. Shape shoulders and cut -and -fill slopes. 13. Scarify, seed, fertilize, and mulch all disturbed areas. 14. Install dry utilities (electrical, fiber-optic, cable, phone, etc.). 15. Re -scarify, re -seed, re -fertilize and mulch all disturbed area. 16. Construct roadbed base course and intermediate asphalt course. 17. Apply final asphalt course. 18. After disturbed areas are stabilized with vegetation, the contractor shall return to the site and remove all temporary erosion control measures. VI. Vegetation Plan 1. The contractor shall provide seeding and mulching on all disturbed areas within fifteen (15) working days following the completion of any phase of grading. Seeding requirements shall include soil preparation, seed mixtures, and mulching. 2. Contractor shall provide sod cover on all areas or comply with permanent seeding schedule. The Villages at Turtle Creek 5 Stormwater Management High Density Permit Application I VII. Appendix • Drainage Area Design Sheet • Pre & Post Development Summaries • Pipe Area Weighted `C' Values • Pipe Sizing Calculations • Conduit Outlet Protection • OeotechnicallReport • Watershed Classification • Army Corps of Engineers Determination Approval Letter • Site Location Map • Drainage Area Map Condition Hydrographs and Notification of Jurisdictional The Villages at Turtle Creek 6 Stormwater Management High Density Permit Application DRAINAGE AREA DESIGN SHEET The Villages at Turtle Creek Stormwa ter Management High Density Permit Application E AREA DESIGN SHEET urn i c: 4/l nZuuo SHEET 1 OF 2 PROJECT: Turtle Creek - Phases 4 and 5 DESIGN BY: EAS PROJECT NO.: 041.05.043 CHECKED BY: LSM DESCRIPTION: Sub -Basin Drainaoe Area AnalvsIs DRAINAGE AREA 4A Post Development C Aft A ac 1 Dwelling & Driveway 0.96 259,128 5.95 2 Sidewalk 0.95 30,372 0.70 3 Street & Gutter 0.95 119,496 274 4 Grass 0.25 587 429 13.03 6 7 8 Weighted C 0.54 Total Area 976,425 22.42 Impervious Area 408,996 9.39 Percent Impervious 41.9% Q=CIA i = 7.2 in/hr C = Weighted C A = Total area in acres Q = 87.67 Volume Runoff to be Controlled From 1.5" Storm Rv=0.05+0.009(I) (Simple Method, Scheuler) 1= 41.9 Percent Impervious Rv= 0.43 Runoff Coefficient V=P*Rv*Ad P= 1.5 in Design Rainfall V= 1.196 ac-8 Volume To Be Treated V= 52,115 ft3 Volume To Be Treated A= 23,785 if Area of Treatment Device D= 2.00 ft Pool Depth 2,671.29 V=1 54,786 ft3 Volume of Treatment 28.00 ft Seasonal High Water Table Elevation 30.00 ft Bottom of Treatment Device 32.00 ft Water Suface Elevation Drawdown Calculation V= 52,115 ft3 Volume To Be Drawn Down A= 23,785 ft Area of Treatment Device k= 0.60 in/hr Most Restrictive Infiltration Rate t= 40 hrs Drawdown Time t= 1.7 days I 4 DRAINAGE AREA DESIGN SHEET PROJECT: PROJECT NO.: DESCRIPTION: 8 DRAINAGE AREA 4B Post Development C A ft3 A ac 1 Dwelling & Driveway 0.95 97,857 2.25 2 Sidewalk 0.95 17,465 0.40 3 Street & Gutter 0.95 58,163 1.34 4 Grass 0.25 194 410 446 5 6 Weighted C 0.58 Total Area I 3677895 8.45 Impervious Area 1 173,485 3.98 Percent Im ervious 47.2% SHEET 2 OF DESIGN BY: CHECKED BY: Q = CiA i = 7.2 in/hr C = Weighted C A = Total area in acres Q e 35.27 Volume Runoff to be Controlled From 1.5" Storm Rv=0.05+0.009(1) (Simple Method, Scheuler) 1= 47.2 Percent Impervious Rv= 0.47 Runoff Coefficient V=P'Rv"Ad P= 1.5 in Design Rainfall V= 0.501 aaft Volume To Be Treated V= 21,816 ft3 Volume To Be Treated A= 23,833 f? Area of Treatment Device D= 1.25 ft Pool Depth 11,462.59 V= 33,279 ft Volume of Treatment 34.33 ft Seasonal High Water Table Elevation 37.00 ft Bottom of Treatment Device 38.25 ft Water Suface Elevation Drewdown Calculation V= 21,816 tt3 Volume To Be Drawn Down A= 23,833 fl? Area of Treatment Device k= 1.51 in/hr Most Restrictive Infiltration Rate t= 10 hrs Drawdown Time t= 0.4 days PRE & POST DEVELOPMENT CONDITIONS HYDROGRAPHS AND SUMMARIES The Villages at Turtle Creek 2 Stormwater Management High Density Permit Application Table of Contents Phases 4-5 Basins Regrade.gpw Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hydrograph Return Period Recap...................................................................... 1 2 - Year SummaryReport................................................................................................................. 2 HydrographReports........................................................................................................... 3 Hydrograph No. 1, Rational, PRE -DEVELOPMENT 4A.................................................... 3 Hydrograph No. 2, Rational, POST -DEVELOPMENT 4A................................................. 4 Hydrograph No. 4, Rational, PRE -DEVELOPMENT 4B................................................... 5 Hydrograph No. 5, Rational, POST -DEVELOPMENT 413 ................................................. 6 Hydrograph No. 9, Reservoir, 4A TO BASIN 4A.............................................................. 7 PondReport ................................................................................................................. 8 Hydrograph No. 10, Reservoir, 413 TO BASIN 413 ............................................................ 9 PondReport ............................................................................................................... 10 Hydrograph No. 13, Combine, PRE -DEVELOPMENT PHASE 4................................... 11 Hydrograph No. 14, Combine, POSTDEV 4A, 4B.......................................................... 12 10 -Year SummaryReport............................................................................................................... 13 HydrographReports......................................................................................................... 14 Hydrograph No. 1, Rational, PRE -DEVELOPMENT 4A................................................. 14 Hydrograph No. 2, Rational, POST -DEVELOPMENT 4A............................................... 15 Hydrograph No. 4, Rational, PRE -DEVELOPMENT 4B................................................. 16 Hydrograph No. 5, Rational, POST -DEVELOPMENT 413 ............................................... 17 Hydrograph No. 9, Reservoir, 4A TO BASIN 4A............................................................ 18 PondReport ............................................................................................................... 19 Hydrograph No. 10, Reservoir, 413 TO BASIN 413 .......................................................... 20 PondReport ............................................................................................................... 21 Hydrograph No. 13, Combine, PRE -DEVELOPMENT PHASE 4................................... 22 Hydrograph No. 14, Combine, POSTDEV 4A, 4B.......................................................... 23 25 - Year SummaryReport............................................................................................................... 24 HydrographReports......................................................................................................... 25 Hydrograph No. 1, Rational, PRE -DEVELOPMENT 4A................................................. 25 Hydrograph No. 2, Rational, POST -DEVELOPMENT 4A............................................... 26 Hydrograph No. 4, Rational, PRE -DEVELOPMENT 413 ................................................. 27 Hydrograph No. 5, Rational, POST -DEVELOPMENT 4B............................................... 28 Hydrograph No. 9, Reservoir, 4A TO BASIN 4A............................................................ 29 PondReport ............................................................................................................... 30 Hydrograph No. 10, Reservoir, 4B TO BASIN 4B.......................................................... 31 PondReport ............................................................................................................... 32 Hydrograph No. 13, Combine, PRE -DEVELOPMENT PHASE 4................................... 33 Hydrograph No. 14, Combine, POSTDEV 4A, 413 .......................................................... 34 100 - Year SummaryReport .............................................................................................................. 35 HydrographReports......................................................................................................... 36 Hydrograph No. 1, Rational, PRE -DEVELOPMENT 4A................................................. 36 Contents Phases 4-5 Basins Regrade.gpw Hydrograph No. 2, Rational, POST -DEVELOPMENT 4A............................................... 37 Hydrograph No. 4, Rational, PRE -DEVELOPMENT 4B................................................. 38 Hydrograph No. 5, Rational, POST -DEVELOPMENT 4B............................................... 39 Hydrograph No. 9, Reservoir, 4A TO BASIN 4A............................................................ 40 PondReport ............................................................................................................... 41 Hydrograph No. 10, Reservoir, 4B TO BASIN 413 .......................................................... 42 PondReport ............................................................................................................... 43 Hydrograph No. 13, Combine, PRE -DEVELOPMENT PHASE 4................................... 44 Hydrograph No. 14, Combine, POSTDEV 4A, 4B.......................................................... 45 Hydrograph Return Period Recap Hyd. Hydrograph I Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational - i 22.36 22.56 25.86 28.25 32.04 35.25 38.33 PRE -DEVELOPMENT 4A 2 Rational 60.38 60.91 69.82 76.27 86.50 95.19 103.49 POST -DEVELOPMENT 4A 4 Rational 8.43 8.50 9.75 10.65 12.08 13.29 14.45 PRE -DEVELOPMENT 4B 5 Rational 24.44 24.66 28.27 30.88 35.02 38.53 41.90 POST -DEVELOPMENT 413 9 Reservoir 0.28 0.28 0.29 0.29 0.30 0.59 1.94 4A TO BASIN 4A 10 Reservoir 5 0.83 0.83 0.84 0.85 0.86 0.88 0.89 4B TO BASIN 4B 13 Combine 1, 4, 30.79 31.06 35.61 38.90 44.11 48.54 52.78 PRE -DEVELOPMENT PHASE 4 14 Combine file: Phases 9, 10, 4-5 1.09 Basins 1.09 - 11 1.12 1.15 1.45 2.82 POSTDEV 4A, 4B Proj. Regrade.gpw _ I Wednesday, Apr 16 2008, 1:24 Pull Hydraflow+ Hydrographs by Intelisolve Hydrograph Summary Report Hyd. Hydrograph No. type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 22.56 1 10 13,536 --- --- - ----- PRE -DEVELOPMENT 4A 2 Rational 60.91 1 10 36,547 -- -- ------ POST -DEVELOPMENT 4A 4 Rational 8.50 1 10 5,102 --- PRE -DEVELOPMENT 4B 5 Rational 24.66 1 10 14,795 — --- POST -DEVELOPMENT 4B 9 Reservoir 0.28 1 20 30,081 2 31.38 36,350 4A TO BASIN 4A 10 Reservoir 0.83 1 20 14,784 5 37.56 14,165 4B TO BASIN 4B 13 Combine 31.06 1 10 18,637 1, 4, ------ PRE -DEVELOPMENT PHASE 4 14 Combine 1.09 1 20 44,218 i 9, 10, - --- POSTDEV 4A, 4B Phases 4-5 Basins Regrade.gpw Return Period: 2 Year Wednesday, Apr 18 2008, 1:24 PM Hydraflow Hydrographs by Intelisolve 3 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 PRE -DEVELOPMENT 4A Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 22.420 ac Intensity = 5.031 in/hr Mir ram.. '_ - IAIII RAIAIrYMKI_In[: Irll= Q (cfs) J0 I M 20.00 1 16.00 12.00 M Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 22.56 cfs Time interval = 1 min Runoff coeff. = 0.2 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 PRE -DEVELOPMENT 4A Hyd. No. 1 -- 2 Yr Hydrograph Volume = 13,536 cult Q (cfs) 24.00 20.00 16.00 12.00 ii o.00 z ' I N 000 0.0 I Hyd No. 1 0.1 0.2 0.3 0.3 Time (hrs) 4 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 2 POST -DEVELOPMENT 4A Hydrograph type = Rational Peak discharge = 60.91 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 22.420 ac Runoff coeff. = 0.54 Intensity = 5.031 in/hr Tc by User = 10.00 min IDF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 111 Q (cfs) 70.00 ........................... .. 60.00 .................................................................................. ................................................................................ 50.00 ... .............. .... 40.00 _.. ................ . .................................................... 30.00 }f .....- 20.00 10.00 o Oo -Z Hydrograph Volume = 36,547 cult Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.0 0.1 0.2 0.3 0.3 Time (hrs) LHyd No. 2 L POST -DEVELOPMENT 4A Hyd. No. 2 -- 2 Yr 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 4 PRE -DEVELOPMENT 4B Hydrograph type = Rational Peak discharge = 8.50 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 8.450 ac Runoff coeff. = 0.2 Intensity = 5.031 in/hr Tc by User = 10.00 min IDF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (cfs) 9 0.00 8.00 6.00 4.00 2.00 l t o Oo PRE -DEVELOPMENT 4B Hyd. No. 4 -- 2 Yr Hydrograph Volume = 5,102 cult Q WS) 10.00 8.00 6.00 4.00 2.00 0 00 ( 0.0 0.1 0.2 0.3 0.3 Time (hrs) l Hyd No. 4 Hydrograph Plot nyU1411UW nyulwyldpliu Uy II0.tlIpUNC Hyd. No. 5 t POST -DEVELOPMENT 4B Hydrograph type = Rational Storm frequency = 2 yrs ' Drainage area = 8.450 ac Intensity = 5.031 in/hr IDF Curve = WILMINGTON-IDF.IDF v.vv 0.0 Hyd No. 5 0.1 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 24.66 cfs Time interval = 1 min Runoff coeff. = 0.58 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 POST -DEVELOPMENT 4B Hyd. No. 5 -- 2 Yr 0.2 0.3 Hydrograph Volume = 14,795 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0.3 Time (hrs) 6 7 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 9 4A TO BASIN 4A Hydrograph type = Reservoir Peak discharge = 0.28 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 31.38 ft Reservoir name = Infiltration Basin 4A Max. Storage = 36,350 cuft Storage Indication method used. 60.00 50.00 40.00 i I 30.00 20.00 t 10.00 4A TO BASIN 4A Hyd. No. 9 -- 2 Yr Hydrograph Volume = 30,081 cult Q (cfs) 70.00 50.00 40.00 20.00 10.00 0 5 10 15 19 24 29 34 39 44 48 Time (hrs) Hyd No. 9 Hyd No. 2 Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Pond No. 1 - Infiltration Basin 4A Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (curt) Total storage (cult) 0.00 30.00 23,785 0 0 1.00 31.00 27,383 25,584 25,584 1.50 31.50 29,201 14,146 39,730 1.75 31.75 30,115 7,415 47,145 2.00 32.00 31,018 7,642 54,786 2.50 32.50 32,863 15,970 70,756 3.00 33.00 34,722 16,896 87,653 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 48.00 0.00 0.00 0.00 Span (in) = 48.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) 30.20 0.00 0.00 0.00 Length (ft) 45.00 0.00 0.00 0.00 Slope (°/0) = 0.27 0.00 0.00 0.00 N-Value .009 .000 .000 .000 nrif_ Ceeff_ 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 3.00 2.00 1.00 0 00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 5.00 15.00 0.00 0.00 Crest El. (ft) = 32.00 32.50 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type Riser Rect Multistage Yes No No No ExHItration = 0.420 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: CulverVOrlfloe outflows have been analyzed under inlet and outlet control. Stage / Discharge J 11 Stage (ft) 3.00 2.00 1.00 000 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 36.00 Total Q Discharge (cfs) 9 Hydrograph Plot ` Hydraflow Hydrographs by Intelisolve Hyd. No. 10 4B TO BASIN 4B Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 5 Reservoir name = Infiltration Basin 413 Storage Indication method used. Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 0.83 cfs Time interval = 1 min Max. Elevation = 37.56 ft Max. Storage = 14,165 cuft Hydrograph Volume = 14,784 cult 413 TO BASIN 4B Q (cfs) Hyd. No. 10 -- 2 Yr Q (off) ` 28.00 24.00 20.00 16.00 f 12.00 f 8.00 p 4.00 L_ i 0 00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 000 0.0 1.5 3.0 4.5 6.0 7.5 9.0 10.5 12.0 13.5 15.0 16.5 Time (hrs) Hyd No. 10 Hyd No. 5 Pond Report 10 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Pond No. 2 - Infiltration Basin 413 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 37.00 23,833 0 0 0.33 37.33 25,135 8,080 8,080 1.00 38.00 28,471 17,958 26,038 1.25 38.25 29,456 7,241 33,279 1.50 38.50 30,445 7,488 40,766 1.75 38.75 31,437 7,735 48,501 2.00 39.00 32,432 7,984 56,485 2.25 39.25 33,431 8,233 64,718 Culvert Orifice Structures [A] [B] [C] [D] Rise (in) = 36.00 0.00 0.00 0.00 Span (in) = 36.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 36.00 0.00 0.00 0.00 Length (ft) = 100.00 0.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multistage = n/a No No No Stage (ft) 3.00 2.00 1.00 0.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 5.00 15.00 0.00 0.00 Crest El. (ft) = 38.25 38.75 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type = Riser Rect -- --- Multistage = Yes No No No EAItration = 1.360 in/hr (Contour) Tailwater Elev. = 0.00 It Note: CulverttOrifice outflows have been analyzed under inlet and outlet control. Stage I Discharge Stage (ft) 3.00 2.00 1.00 0 00 0.00 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 13 PRE -DEVELOPMENT PHASE 4 Hydrograph type = Combine Peak discharge = 31.06 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 1, 4 PRE -DEVELOPMENT PHASE 4 Q (ofs) Hyd. No. 13 -- 2 Yr 35.00 f ........ ....... ... ... ... - 30.00 ......... ._... ................. .. ......... .. ................................... ............. 25.00 ........ ................. ... ......... ......... __ - ... ...... ! _ ... ........ .................. ..... -- t 20.00 \, ......... ......... .......... _. ... ... ... ... . ... ......... ..... .......... ... ... . ........ .......... ......... ......... _ .. _.... .......... ........... ........ ................ .................................... _ ....... -- .................................. ........... ............. ........ ........ ................... 15.00 10.00 ......... ...... . ... ... ....... -- . ........._ . _ ...... ..___ .... . ... _..... ........... ...... ......... ....... ..... 5.00 ........ ... ... .. ...... 0.00 _ . 0.0 0.1 Hyd No. 13 Hyd No. 1 Hydrograph Volume = 18,637 cult Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.2 0.3 0.3 Hyd No. 4 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 14 POSTDEV 4A, 4B Hydrograph type = Combine Peak discharge = 1.09 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 9, 10 1.00 M POSTDEV 4A, 4B Hyd. No. 14 -- 2 Yr 5 10 15 19 Hyd No. 14 Hyd No. 9 24 29 34 Hyd No. 10 Hydrograph Volume = 44,218 cult 39 44 Q (cfs) 2.00 1.00 0.00 48 Time (hrs) 12 L 13 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cis) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational I 28.25 1 10 16,950 --- ------ PRE -DEVELOPMENT 4A 2 Rational 76.27 1 10 45,764 --- -- ----- POST -DEVELOPMENT 4A 4 Rational 10.65 1 10 6,388 --- ------ PRE -DEVELOPMENT 4B 5 Rational 30.88 1 10 18,526 — — - POST -DEVELOPMENT 4B 9 Reservoir 0.29 1 20 36,720 2 31.70 45,548 4A TO BASIN 4A 10 Reservoir 0.85 1 20 18,516 5 37.60 17,850 4B TO BASIN 4B 13 Combine 38.90 1 10 23,338 1, 4, PRE -DEVELOPMENT PHASE 4 14 Combine 1.12 1 20 54,342 9, 10, POSTDEV 4A, 4B Phases 4-5 Basins Regrade.gpw Return Period: 10 Year Wednesday, Apr 15 2008, 1:24 PM Hydraflow Hydrographs by Intallsolve Hydrograph Plot 14 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 PRE -DEVELOPMENT 4A Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 22.420 ac Intensity = 6.300 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) i 30.00 25.00 15.00 i 81111l M Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 28.25 cfs Time interval = 1 min Runoff coeff. = 0.2 Tc by User = 10.00 min Asc/Rec limb fact = 1 /1 PRE -DEVELOPMENT 4A Hyd. No. 1 --10 Yr Hydrograph Volume = 16,950 cult 0.00 v I I I N 0.0 Hyd No. 1 0.1 0.2 0.3 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.3 Time (hrs) Hydrograph Plot 15 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 POST -DEVELOPMENT 4A Hydrograph type = Rational I Storm frequency = 10 yrs Drainage area = 22.420 ac Intensity = 6.300 in/hr IDF Curve = WILMINGTON-iDF.IDF Q (cfs) 80.00 70.00 -—........... —.......................... ............................ . ....... ..... .._.... 60.00 I .......... .- 50.00 -- ................. ---...... ....... ....... --- ... ......... ............ ... ... 40.00 30.00 ............... .. 20.00 .......................... ...................... . .......... 10.00 000 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 76.27 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 POST -DEVELOPMENT 4A Hyd. No. 2 --10 Yr Hydrograph Volume = 45,764 cult Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 o Oa 0.0 0.1 0.2 0.3 0.3 Hyd No. 2 Time (hrs) Hydrograph Plot 16 Hydraflow Hydrographs by Intelisolve Hyd. No. 4 PRE -DEVELOPMENT 413 Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 8.450 ac Intensity = 6.300 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 12.00 10.00 i c 8.00 6.00 4.00 l 2.00 0.00 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 10.65 cfs Time interval = 1 min Runoff coeff. = 0.2 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 6,388 cult PRE -DEVELOPMENT 4B Hyd. No. 4 --10 Yr ....... ........ ....... _.._. _.-.- ...-_... , ........ ...,.,,,,.., ,.. ......... ...... ..._.,..-... ............ .._-..-... ,.. _...- .. _....._.1--- ...- ---------. ....... 0.0 Hyd No. 4 i L. Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0 00 0.1 0.2 0.3 0.3 Time (hrs) Hydrograph Plot 17 Hydraflow Hydrographs by Intelisolve Hyd. No. 5 POST -DEVELOPMENT 4B Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 8.450 ac Intensity = 6.300 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 'i 0.00 0.0 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 30.88 cfs Time interval = 1 min Runoff coeff. = 0.58 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 POST -DEVELOPMENT 4B Hyd. No. 5 —10 Yr Hydrograph Volume = 18,526 cult Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 0.1 0.2 0.3 0.3 Hyd No. 5 Time (hrs) Hydrograph Plot 18 Hydraflow Hydrographs by Intelisolve Hyd. No. 9 j 4A TO BASIN 4A Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 2 Reservoir name = Infiltration Basin 4A Storage Indication method used. Q (cfs) 80.00 ......... 70.00 60.00 . .. .... ......... ... _....... j 50.00 j 40.00 30.00 .............. .. ... ... . 20.00 ..................................... ....... ................................................................................. 10.00 0 00 0 5 i Hyd No. 9 I 4A TO BASIN 4A Hyd. No. 9 --10 Yr 10 15 19 Hyd No. 2 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 0.29 cfs Time interval = 1 min e� Max. Elevation = 31.70 Max. Storage = 45,548 cuft Hydrograph Volume = 36,720 cult Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 24 29 34 39 44 48 Time (hrs) Pond Report 19 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Pond No. 1 - Infiltration Basin 4A Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 30.00 1.00 31.00 23,785 27,383 0 25,584 0 25,584 1.50 31.50 29,201 14,146 39,730 ' 1.75 31.75 30,115 7,415 47,145 �p� •s 2.00 32.00 31,018 7,642 54,786 yv�,l.. !�' 2.50 32.50 32,863 15,970 70,756 3.00 33.00 34,722 16,896 87,653 Culvert / Orifice Structures Weir Structures 5ro"SS r [A] [B] [C] [D] [A] [C] [D] Rise (in) = 48.00 0.00 0.00 0.00 Crest Len (ft) = 5.00 15.00 0.00 0.00 Span (in) = 48.00 0.00 0.00 0.00 Crest El. (ft) = 32.00 32.50 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 30.20 0.00 0.00 0.00 Weir Type = Riser Rect --- Length (ft) = 45.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.27 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No Exi'lItration = 0.420 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: CulverVOririce outflows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 0.00 1 0.00 Stage / Discharge Stage (ft) 3.00 2.00 1.00 I I I I I I I I I I I 1 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 36.00 Total Q Discharge (cfs) Hydrograph Plot 20 Hydraflow Hydrographs by Intelisolve Hyd. No. 10 4B TO BASIN 4B Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 5 Reservoir name = Infiltration Basin 4B Storage Indication method used. Q (cfs) f 35.00 30.00 25.00 20.00 i 15.00 10.00 5.00 0 00 413 TO BASIN 4B Hyd. No. 10 -- 10 Yr Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 0.85 cfs Time interval = 1 min Max. Elevation = 37.69 ft Max. Storage = 17,850 cuft Hydrograph Volume = 18,516 cult Q (cfs) 35.00 FC111M 25.00 20.00 15.00 10.00 5.00 0.0 1.7 3.3 5.0 6.7 8.3 10.0 11.7 13.3 15.0 16.7 Time (hrs) Hyd No. 10 Hyd No. 5 Pond Report 21 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Pond No. 2 - Infiltration Basin 4B Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 37.00 23,833 0 0 r 0 f.� �(`oV►O 0.33 1.00 37.33 38.00 25,135 28,471 8,080 8,080 17,958 26,038,E 1.25 38.25 29,456 7,241 33,279 1.50 38.50 30,445 7,488 40,766 1.75 38.75 31,437 7,735 48,501 2.00 39.00 32,432 7,984 56,485 2.25 39.25 33,431 8,233 64,718 Culvert/Orifice Structures Weir Structures byewsS 4.►e:r�� [A] [B] [C] [D] [A] [C] [D] Rise (in) = 36.00 0.00 0.00 0.00 Crest Len (ft) = 5.00 15.00 0.00 0.00 Span (in) = 36.00 0.00 0.00 0.00 Crest El. (ft) = 38.25 38.75 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 36.00 0.00 0.00 0.00 Weir Type = Riser Rect -- -- Length (ft) = 100.00 0.00 0.00 0.00 Multi -Stage Yes No No No Slope (%) = 11.00 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 oric Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No ExIfiltration = 1.360 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: CulverVOrifioe outflows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 0.00 0.00 Stage / Discharge Stage (ft) 3.00 2.00 1.00 I I I I I I I I 1 0.00 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 Total Q Discharge (cfs) Hydrograph Plot I` Hydraflow Hydrographs by Intelisolve i Hyd. No. 13 r j PRE -DEVELOPMENT PHASE 4 Hydrograph type = Combine Storm frequency = 10 yrs Inflow hyds. = 1, 4 Q (cfs) 40.00 I 30.00 20.00 10.00 Hyd No. 13 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 38.90 cfs Time interval = 1 min PRE -DEVELOPMENT PHASE 4 Hyd. No. 13 --10 Yr 0.1. Hyd No. 1 Hydrograph Volume = 23,338 cult Q (cfs) 40.00 *0111l11 20.00 10.00 0.00 0.2 0.3 0.3 Hyd No. 4 Time (hrs) 22 Hydrograph Plot 23 Hydraflow Hydrographs by Intelisolve Hyd. No. 14 POSTDEV 4A, 4B Hydrograph type = Combine Storm frequency = 10 yrs Inflow hvds. = 9. 10 Q (cfs) 2.00 1.00 0.00 A 0 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 1.12 cfs Time interval = 1 min POSTDEV 4A, 4B Hyd. No. 14 =-10 Yr 5 10 15 19 24 29 34 Hyd No. 14 Hyd No. 9 Hyd No. 10 Hydrograph Volume = 54,342 cult Q (cfs) 2.00 1.00 ' ' 0.00 39 44 48 Time (hrs) 24 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 32.04 1 10 19,223 -- ---- ------ PRE -DEVELOPMENT 4A 2 Rational 86.50 1 10 51,902 -- --- ----- POST -DEVELOPMENT 4A 4 Rational 12.08 1 10 7,245 -- ------ PRE -DEVELOPMENT 4B 5 Rational 35.02 1 10 21,011 --- -- ----- POST -DEVELOPMENT 4B 9 Reservoir 0.30 1 20 40,672 2 31.90 51,675 4A TO BASIN 4A 10 Reservoir 0.8F — 21,000 5 37.79 20,308 4B TO BASIN 4B 13 Combine 26,468 1, 4, ------ ------ PRE -DEVELOPMENT PHASE 4 14 1 Combine I I i __ 60,576 9, 10, � POSTDEV 4A, 4B � Phases 4-5 Basins Regrade.gpw Return Period: 25 Year Wednesday, Apr 15 2008, 1:24 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 25 Hydraflow Hydrographs by Intelisohre Hyd. No. 1 PRE -DEVELOPMENT 4A Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 22.420 ac Intensity = 7.145 in/hr IDF Curve = WILMINGTON-IDF.IDF i Q (cfs) 35.00 ` 30.00 25.00 20.00 1 15.00 10.00 5.00 000 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 32.04 cfs Time interval = 1 min Runoff coeff. = 0.2 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 PRE -DEVELOPMENT 4A Hyd. No. 1 -- 25 Yr Hydrograph Volume = 19,223 cult Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 0.0 0.1 0.2 0.3 0.3 Hyd No. 1 Time (hrs) Hydrograph Plot 26 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 2 POST -DEVELOPMENT 4A Hydrograph type = Rational Peak discharge = 86.50 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 22.420 ac Runoff coeff. = 0.54 Intensity = 7.145 in/hr Tc by User = 10.00 min IDF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 Hydrograph Volume = 51,902 cult Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.0 0.1 0.2 0.3 0.3 Hyd No. 2 Time (hrs) POST -DEVELOPMENT 4A Hyd. No. 2 -- 25 Yr Hydrograph Plot 27 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 4 PRE -DEVELOPMENT 4B Hydrograph type = Rational Peak discharge = 12.08 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 8.450 ac Runoff coeff. = 0.2 Intensity = 7.145 in/hr Tc by User = 10.00 min IDF Curve = WILMINGTON-IDF.IDF Asc/Rec limb fact = 1/1 Q (cfs) 14.00 12.00 10.00 8.00 i 6.00 I 4.00 2.00 000 0.0 Hydrograph Volume = 7,245 cuft Q(Cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0.1 0.2 0.3 0.3 Hyd No. 4 Time (hrs) PRE -DEVELOPMENT 4B Hyd. No. 4 -- 25 Yr Hydrograph Plot 28 Hydraflow Hydrographs by Intelisolve Hyd. No. 5 POST -DEVELOPMENT 4B Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 8.450 ac Intensity = 7.145 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 40.00 30.00 P4111I111 10.00 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 35.02 cfs Time interval = 1 min Runoff coeff. = 0.58 Tc by User = 10.00 min Asc/Rec limb fact = 111 POST -DEVELOPMENT 4B Hyd. No. 5 -- 25 Yr Hydrograph Volume = 21,011 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.0 0.1 0.2 0.3 0.3 Hyd No. 5 Time (hrs) Hydrograph Plot 29 Hydraflow Hydrographs by Intelisolve Hyd. No. 9 4A TO BASIN 4A Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 2 Reservoir name = Infiltration Basin 4A Storage Indication method used. Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 5 Hyd No. 9 4A TO BASIN 4A Hyd. No. 9 -- 25 Yr 10 15 19 Hyd No. 2 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 0.30 cfs Time interval = 1 min Max. Elevation = 31.90 ft Max. Storage = 51,675 cuft Hydrograph Volume = 40,672 cult Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 24 29 34 39 44 48 Time (hrs) Pond Report 30 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Pond No. I - Infiltration Basin 4A Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 30.00 23,785 0 0 1.00 31.00 27,383 25,584 25,584 1.50 31.50 29,201 14,146 39,730 1.75 31.75 30,115 7,415 47,145 2.00 32.00 31,018 7,642 54,786 2.50 32.50 32,863 15,970 70,756 3.00 33.00 34,722 16,896 87,653 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 48.00 0.00 0.00 0.00 Crest Len (ft) = 5.00 15.00 0.00 0.00 Span (in) = 48.00 0.00 0.00 0.00 Crest El. (ft) = 32.00 32.50 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 30.20 0.00 0.00 0.00 Weir Type = Riser Rect --- --- Length (ft) = 45.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 0.27 0.00 0.00 0.00 N Value = .009 .000 _000 .000 Orif. Coeff. 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No Exfiltration = 0.420 in/hr (Contour) Tailwater Elev. = 0.00 It Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 0.00 Stage / Discharge Stage (ft) 3.00 2.00 1.00 0 00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 ' 33.00 36.00 Total 4 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 10 j 4B TO BASIN 4B Hydrograph type = Reservoir Peak discharge = 0.86 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 5 Max. Elevation = 37.79 ft Reservoir name = Infiltration Basin 4B Max. Storage = 20,308 cuft Storage Indication method used. Hydrograph Volume = 21,000 cult 4B TO BASIN 4B Q (cfs) Hyd. No. 10 -- 25 Yr Q (cfs) 40.00 ........ _........ 40.00 -- ........ .... ...._... ..... ...... ......... —.—. .. 30.00 ........... .........__ .......- - ......... ........ - ..... ...... — ........ 30.00 ......_._ ........ _-.- — - ---- --- .. _.... .. ......... ......... --- -.. ....... ......... ...... --- 20.00 ... -- ---- 20.00 ...... _ ......... ....... ...... . ......... .... ........ _ _ _.... ........ .... ..... 10.00 s - ......... ........ -.- - 10.00 - --- -- _...... ............... ... ......... i 0.00 1 0.00 0.0 1.7 3.3 5.0 6.7 8.3 10.0 11.7 13.3 15.0 16.7 18.3 Time (hrs) Hyd No. 10 Hyd No. 5 31 Pond Report 32 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Pond No. 2 - Infiltration Basin 4B Pond Data Pond storage is based on known contour areas. Average end area method used. Stage : Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 37.00 23,833 0 0 0.33 37.33 25,135 8,080 8,080 1.00 38.00 28,471 17,958 26,038 1.25 38.25 29,456 7,241 33,279 1.50 38.50 30,445 7,488 40,766 1.75 38.75 31,437 7,735 48,501 2.00 39.00 32,432 7,984 56,485 2.25 39.25 33,431 8,233 64,718 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 36.00 0.00 0.00 0.00 Span (in) = 36.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 36.00 0.00 0.00 0.00 Length (ft) 100.00 0.00 0.00 0.00 Slope (%) 1.00 0.00 0.00 0.00 N-Value .009 .000 .000 .000 Orif. Coeff. 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 3.00 2.00 1.00 L 000 weir structures [A] [B] [C] [D] Crest Len (ft) = 5.00 15.00 0.00 0.00 Crest El. (ft) 38.25 38.75 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type = Riser Rect --- --- Multi-Stage = Yes No No No ExHftration = 1.360 in/hr (Contour) Tailwater Elev_ = 0.00 ft Note: CulverllOrifice outflows have been analyzed under inlet and outlet control. Stage / Discharge .... . . ........... ........................... ........ . ... . .......... . . .. . . ........ . . . . . . ... ................... . . . ..... . .. . . . . ........... . ............. . . .. I . ............. . . . ....... .... ... . . 11.11,111,11111.1 . ... ...... . - ..... ...... . ......... . .. ... .. 0.00 4.00 8.00 - Total Q Stage (ft) 3.00 2.00 1.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve I Hyd. No. 13 PRE -DEVELOPMENT PHASE 4 Hydrograph type = Combine Storm frequency = 25 yrs Inflow hyds. = 1, 4 i Q (Cfs) 50.00 40.00 30.00 20.00 10.00 0.00 - 0.0 0.1 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 44.11 cfs Time interval = 1 min PRE -DEVELOPMENT PHASE 4 Hyd. No. 13 -- 25 Yr 0.2 Hyd No. 13 Hyd No. 1 Hyd No. 4 0.3 Hydrograph Volume = 26,468 cult Q (Cfs) 50.00 40.00 30.00 lKS 11 10.00 - 0.00 0.3 Time (hrs) 33 Hydrograph Plot 34 Hydraflow Hydrographs by Intelisobe Hyd. No. 14 POSTDEV 4A, 4B Hydrograph type = Combine Storm frequency = 25 yrs Inflow hyds. = 9, 10 Q (C%) 2.00 M11811 0.00 1 0 5 10 Hyd No. 14 POSTDEV 4A, 4B Hyd. No. 14 -- 25 Yr Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 1.15 cfs Time interval = 1 min Hydrograph Volume = 60,576 cuR Q (cfs) 2.00 1.00 I I I I I 0.00 15 19 24 29 34 39 44 48 - Hyd No. 9 Hyd No. 10 Time (hrs) 35 L_. Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 38.33 1 10 22,999 --- ------ PRE -DEVELOPMENT 4A 2 Rational 103.49 1 10 62,097 --- POST -DEVELOPMENT 4A 4 Rational 14.45 1 10 8,668 --- ----- ---- PRE -DEVELOPMENT 4B 5 Rational 41.90 1 10 25,138 --- ---- POST -DEVELOPMENT 4B 9 Reservoir 1.94 1 20 48,302 2 32.21 61,567 4A TO BASIN 4A 10 Reservoir 0.89 1 20 25,127 5 37.94 24,398 4B TO BASIN 4B 13 Combine 52.78 1 10 31,667 1, 4, --- - PRE -DEVELOPMENT PHASE 4 14 Combine 2.82 1 20 72,140 9, 10, ------ i POSTDEV 4A, 4B Phases 4-5 Basins Regrade.gpw Return Period: 100 Year Wednesday; Apr 16 2008, 1:24 PM Hydraflow Hydrographs by intelisolve Hydrograph Plot 36 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 PRE -DEVELOPMENT 4A Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 22.420 ac Intensity = 8.548 in/hr IDF Curve = WILMINGTON-IDF.IDF r Q (cfs) 40.00 30.00 20.00 0.00 0.0 Hyd No. 1 0.1 Wednesday, Apr 16 2008, 1:24 PM Peak discharge. = 38.33 cfs Time interval = 1 min Runoff coeff. = 0.2 Tc by User = 10.00 min Asc/Rec limb fact = 111 PRE -DEVELOPMENT 4A Hyd. No. 1 —100 Yr 0.2 0.3 Hydrograph Volume = 22,999 cult Q (cfs) 40.00 20.00 10.00 N 0.00 0.3 Time (hrs) 37 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 POST -DEVELOPMENT 4A Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 22.420 ac Intensity = 8.548 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 120.00 i11I111I7 80.00 f 1:I111I1l 40.00 20.00 -- - - -- . 0.00 i 0.0 Hyd No. 2 L 0.1 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 103.49 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 POST -DEVELOPMENT 4A Hyd. No. 2 --100 Yr 0.2 0.3 Hydrograph Volume = 62,097 cult Q (cfs) 120.00 100.00 40.00 20.00 0.00 0.3 Time (hrs) Hydrograph Plot 38 Hydraflow Hydrographs by Intelisolve Hyd. No. 4 PRE -DEVELOPMENT 4B Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 8.450 ac Intensity = 8.548 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) F 12.00 9.00 6.00 3.00 000 0.0 0.1 Hyd No. 4 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 14.45 cfs Time interval = 1 min Runoff coeff. = 0.2 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 PRE -DEVELOPMENT 4B Hyd. No. 4 --100 Yr Hydrograph Volume = 8,668 cult Q (cfs) 15.00 12.00 3.00 1 0.00 0.2 0.3 0.3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 POST -DEVELOPMENT 4B Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 8.450 ac Intensity = 8.548 in/hr IDF Curve = WILMINGTON-IDF.IDF I Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.0 I l_ Hyd No. 5 0.1 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 41.90 cfs Time interval = 1 min Runoff coeff. = 0.58 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 POST -DEVELOPMENT 4B Hyd. No. 5 —100 Yr 0.2 0.3 Hydrograph Volume = 25,138 cult Q (cfs) 50.00 40.00 30.00 20.00 flrl1df N 0.00 0.3 Time (hrs) 39 Hydrograph Plot 40 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 9 4A TO BASIN 4A Hydrograph type = Reservoir Peak discharge = 1.94 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 32.21 ft Reservoir name = Infiltration Basin 4A Max. Storage = 61,567 cuft Storage Indication method used. Hydrograph Volume = 48,302 cult Q (cis) 120.00 100.00 80.00 60.00 40.00 20.00 f 0.00 — 0 5 10 Hyd No. 9 4A TO BASIN 4A Hyd. No. 9 --100 Yr Q (cfs) 120.00 100.00 40.00 20.00 ^--�I 10.00 15 19 24 29 34 39 44 48 - Hyd No. 2 Time (hrs) Pond Report 41 Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Pond No. 1 - Infiltration Basin 4A Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 30.00 23,785 0 0 1.00 31.00 27,383 25,584 25,584 1.50 31.50 29,201 14,146 39,730 1.75 31.75 30,115 7,415 47,145 2.00 32.00 31,018 7,642 54,786 2.50 32.50 32,863 15,970 70,756 3.00 33.00 34,722 16,896 87,653 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A►] [B] [C] [D] Rise (in) = 48.00 0.00 0.00 0.00 Crest Len (ft) = 5.00 15.00 0.00 0.00 Span (in) = 48.00 0.00 0.00 0.00 Crest El. (ft) = 32.00 32.50 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 30.20 0.00 0.00 0.00 Weir Type = Riser Rect --- --- Length (ft) = 45.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 0.27 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multistage = n/a No No No Exfiltration = 0.420 inthr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 3.00 2.00 1.00 000 Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage / Discharge ....... ... ....... .... . ....... . ...... .......... .... ...... . .... .. .. ...... . . . . .. .......... .. . I . - 1, 1 -1 .. ... ....... .. . . .......... . . ... . .......... . I . . . ...... . --- - � - . 1. - I I ------ - J Stage (ft) 3.00 2.00 1.00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 30.00 33.00 36.00 Total Q Discharge (cfs) 42 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Hyd. No. 10 4B TO BASIN 4B Hydrograph type = Reservoir Peak discharge = 0.89 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 5 Max. Elevation = 37.94 ft Reservoir name = Infiltration Basin 4B Max. Storage = 24,398 cuff Storage Indication method used. Hydrograph Volume = 25,127 cuFt Q (cfs) 50.00 U1111111 30.00 20.00 10.00 1.8 3.7 5.5 Hyd No. 10 — 4B TO BASIN 4B Hyd. No. 10 -- 100 Yr Q (cfs) 50.00 40.00 30.00 20.00 ED111I6] 0.00 7.3 9.2 11.0 12.8 14.7 16.5 18.3 20.2 Time (hrs) Hyd No. 5 Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Apr 16 2008, 1:24 PM Pond No. 2 - Infiltration Basin 4B Pond Data I Pond storage is based on known contour areas. Average end area method used. Stage I Storage ► able Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuff) Total storage (curt) 0.00 37.00 23,833 0 0 0.33 37.33 25,135 8,080 8,080 1.00 38.00 28,471 17,958 26,038 1.25 38.25 29,456 7,241 33,279 1.50 38.50 30,445 7,488 40,766 1.75 38.75 31,437 7,735 48,501 2.00 39.00 32,432 7,984 56,485 2.25 39.25 33,431 8,233 64,718 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 36.00 0.00 0.00 0.00 Crest Len (ft) = 5.00 15.00 0.00 0.00 Span (in) = 36.00 0.00 0.00 0.00 Crest El. (ft) = 38.25 38.75 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coelf. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 36.00 0.00 0.00 0.00 Weir Type = Riser Rect --- --- Length (ft) = 100.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 Orit Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No ExfiItration = 1.360 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 3.00 2.00 1.00 0.00 11 0.00 4.00 8.00 T otal Q Stage I Discharge Note: Culvert/Orifice outllows'have been analyzed under inlet and outlet control. Stage (ft) 3.00 2.00 1.00 0.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 Discharge (cfs) 43 Hydrograph Plot 44 Hydraflow Hydrographs by Intelisolve Hyd. No. 13 PRE -DEVELOPMENT PHASE 4 Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 1, 4 Q (cfs) 60.00 50.00 40.00 30.00 10.00 f Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 52.78 cfs Time interval = 1 min Hydrograph Volume = 31,667 cult PRE -DEVELOPMENT PHASE 4 Hyd. No. 13 — 100 Yr 0.00 0.0 0.1 Hyd No. 13 Hyd No. 1 0.2 Hyd No. 4 0.3 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.3 Time (hrs) 45 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 14 POSTDEV 4A, 4B Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 9, 10 I POSTDEV 4A, 4B Q (S) Hyd. No. 14 —100 Yr 2.00 1.00 0.00 1 0 Wednesday, Apr 16 2008, 1:24 PM Peak discharge = 2.82 cfs Time interval = 1 min 5 10 15 19 24 29 34 Hyd No. 14 Hyd No. 9 Hyd No. 10 Hydrograph Volume = 72,140 cult 39 44 Q (cfs) 3.00 PX1111 1.00 -1 0.00 48 Time (hrs) PIPE AREA WEIGHTED `C' VALUES The Villages at Turtle Creek Stormwater Management High Density Permit Application DRAINAGE AREA DESIGN SHEET DATE: 4/17/2008 SHEET 1 OF 13 PROJECT: Turtle Creek - Phases 4 and 5 DESIGN BY: EAS PROJECT NO.: 041.05.043 CHECKED BY: DESCRIPTION: Sub -Basin Drainage Area Analysis DRAINAGE AREA CI-66 Post Development C A A ac 1 Dwelling & Driveway 095 8,860 2 Sidewalk 095 2,635 096 3 Street&Gutter D 00 8403 0it 4 Gress 6 7 8 Wal hted C 1 1 0.52 Total Area 50.881 1.17 Im rviow Area 19 791 0.45 Percent Impervious M.9% DRAINAGE AREA CI-67 Post Development C A A ac 1 Dwelling & Ddveway 0.95 10.814 0.25 2 Sidewalk 833 002 3 Street & Gutter 0.95 3,307 008 4 Grass 025 9.217 021 6 7 e Weighted C 0.68 Total Area 24.171 0.55 Impervious Area 14 954 0.34 1p—.ntI-oarvlous 61.9% DRAINAGE AREA CI-58 Post Development C Aft° A as 1 Dwelling & Driveway 0 18 91 2 Sidewalk 095 1424 0 3 Street & Gutter 096 41177 0, 1 4 Grass 6 7 8 .Weighted C 0.76 Tl _ 34,141 0.78 Imrvaa 24,8921 0.57 Percent Impervious 72.9% DRAINAGE AREA CI-69 Post Development C A Afee) 1 Dwelling & Dflyeway 095 3,744 0 DO 2 Sldwalk 096 1917 3 Street & Gutter 0. 6,290 .14 4 Grass 020 2BJ43 6 7 8 Wel hted C 1 0.46 Total Area 40 094 0.92 Im aMous Area 11,951 0.27 Percent Impervious Q = CIA I = 7.21Nhr C = Weighted C A • Total area in acres Q = CIA i = 7.2 in/hr C = Weighted C A = Total area In acres Q • 2.7$ Q • CIA 1= 7.2 in/hr C = Weighted C A = Total area in acres • 4.29 Q = CIA I = 7.21nmr C = Weighted C A • Total area in acres = 3114 SHEET 2 OF 13 DESIGN SY: EAS DRAINAGE AREA CI-70 CHECKED BY: Post Development C A A ac 1 Dwelling & Driveway 0j§ 3.570 % 2 Sidewalk ON 1574 004 3 Street & Gutter 095 4,623 0.11 4 crass 0,26 4,320 010 6 7 8 Wal hied C 0.74 Total Ann 14.0871 0.32 Im rvious Area 1 9767 0.22 Percent Impervious 69.3% DRAINAGE AREA CI-71 Post Development C A (fel A tat 1 Dwelling & Driveway 7,537 9.17 2 Sidewalk 0,45 1,163 003 3 Street & Gutter 0,95 4.055 0.00 4 Grass 0.25 0431 01.1 6 7 8 _ Weighted C 0.71 Total Area 1 19.276 1 0.44 Impervious Area 1 12,745 1 0.29 Percent Impervious 66.1% DRAINAGE AREA CI-72 Post Development C AM I A ae 1 Dwelling & Driveway 15.172 2 Sidewalk 08(r,_ 1487 �I Q.L 3 Street & Gutter 4 — 5_500 4 8 Grass _ 029 16 238 1 037 7 1 1 8 Weighted C 0.65 Total Area 38,39710.88 Impervious Area 22.159 0.51 Percent Impervious 57.7% DRAINAGE AREA CI.73 F - ----T--T c I eWAT nme� 1 Dwellin &D 098 14972 asa 2 Sidewalk 0 1058 0 3 Street & Gutter 0. 4 435 0.10 4 Gress 02 t 029 B 7 8 Weighted C 0.68 Total Area 32 953 0.76 Im rvious Area 2D 466 0.47 Percent Impervious 62.1% Q = CIA i = 7.2 inlhr C = Weighted C A =- Total area in acres Q= 9T1 Q-CiA i = 72 INhr C = Weighted C A = Total area in acres Q = CIA 1= 7.2 inlhr C - Weighted C A = Total area in acres Q - CIA 1= 72 irdhr C = Weighted C A = Total area In acres Q= 373 SHEET 3 OF 13 DESIGN BY: EAS DRAINAGE AREA CI-74 CHECKED BY: Post Development C A Alee) 1 Dwelling & Driveway 995 14.972 034 2 Sidewalk 0. PA 959 002 3 Street & Gutter 0.06 4.203 01 4 Gress 026 JR.JR1 028 6 7 8 Wel hted C 0.69 Total Area 1 32 235 0.74 Impervious Area 1 20.1311 0.46 Percent ImDervlous DRAINAGE AREA CI-75 Post Development C A gel A ac 1 Dwelling & Driveway 98 116,686 036 2 Sidewalk 0 95 909 002 3 Street & Gutter 0.95 4,640 911 Gress 925 16 4 6 7 8 Weighted C 0.65 it Total Area 36,942 1 0.85 Impervious 1 21,1151 0.48 Percent Impervious 572% DRAINAGE AREA CI-76 Post Development C A M A ae 1 Dwelling & UrIveway 4323 09 2 Sidewalk Q. 5 138 Q-QD 3 Street & Gutter 095 4.662 010 4 Gress _ Q 8 0n 6 Other (Pump Station 093 000 7 8 Weighted C 0.56 Total Area 1 20.5781 0.47 Impervious Area 9,0131 0.21 Percent Impervious 43.8% Post Development C A M AJac) 1 Dwelling & Driveway 005 11,257 2 Sidewalk 005 000 3 Street & Gutter 095 8,273 014 6 Grass 025 29895 089 7 8 Weighted C 0.51 Total Area 47 425 1.09 Im ervlous Area 17 1530 0.40 Percent Im ervlous 37.0% Q=CIA i = 7.2 inlhr C = Weighted C A = Total area In acres @= 3.06. Q = CIA 1-7.2inmr C = Weighted C A = Total area in acres Q = CIA I = 7.2 INhr C = Weighted C A - Total area in acres - 1 88 Q - CIA 1=72inmr C = Weighted C SHEET 4 OF 13 DESIGN BY: EAS DRAINAGE AREA CI-79 CHECKED BY: Post Development C A A se 1 Dwelling & Ddvewav 0 96 0.an 2 Sidewalk .96 1.334 0. 3 Street & Gutter 095 4.054 000 4 Grass 025 5 G 6 _ 8 Niel kited C 0.61 Total Area 10,436M51d Im rvious Area 5 388Poroard Im rvious DRAINAGE AREA CI-79 Post Development C A A ac 1 Dwelling & Driveway Is,"" 2 Sidewalk 096 804 002 3 Street & Gutter 095 4.752 0.11 4 Gross 02J 15.M 0. 8 7 8 .Weighted C 0.57 Total Aroa 39.993 0.92 Im loos Area1 23,99 0.55 Percent Impervious 60.0% DRAINAGE AREA Cl Post Development C A AInc) 1 Dwelling & Ddvewav 096 3,991 2 Sidewalk 0 9 931 002 3 Street & Gutter _ 0 96 3.012 091 4 Gross .g;:,¢_ 2 6 7 8 Wet hied C 0.77 Total Area 15.609 024 Impervious Area 1 7,9341 0.16 Percem Impamlous LUdl�Ud14JldJi,Vjnl Post Development C A A ac 1 Dwelling & Ddvewav 0�0lL, 2 Sidewalk 0.96 1269 3 Street & Gutter 0.95 3,168 007 4 Grass 1 8 _ 7 6 Weighted C 0.82 Total Araa - 5.44 0.12 Im rvious Area 4.413 0.10 Percent Impervious Q = CIA i - 7.2 inRk C = Weighted C A = Taal area in acres Q = CiA I = 7.2 Inlhr C = Weighted C A = Total area in acres Q - CIA 1= 7.2 irVhr C = Weighted C A= Total area in acme t.36 Q - CIA I = 72 ingv C = Weighted C A - Total area in acres Q= O.T4 SHEET 5 OF 13 DESIGN BY: EAS DRAINAGE AREA CM CHECKED BY: Develo mend C A A aellin &Driveway 000 Sidewalkreet. & Gutter 095 684 0Grass 000 Z 797 0.02 730 0.02 91.6% DRAINAGE AREA CI-83 Post Develo ment C A A ac 1 Dwelling & Ddv .9. 3 805 2 Sidewalk 0.96 668 0. 3 Street & Gutter 2 799 4 Grass A. 0 6 7 8 Wei hied C 1 0.69 Total Area 11,537 0.27 Im ervlous Area 1 7,2721 0.17 Percent Impervious 52.5% DRAINAGE AREA CI-84 eM C A A ac ewa 0 95 S i 366 0 II96 �_ 581 001_ er 00 65 3 342 04 Grass MCI 0.70 Total Area 23,580 0.54 Im rvious Area 15,2891 0.35 PorceM Impervious DRAINAGE AREA C485 Post Develo mart C AM21 A ac 1 Dwellin & Dri 96 7 168 old 2 Sidewalk 095 1.340 0. 3 Street & Gutter age 4 482 0.1 4 Grass 025 10.027 6 7 8 Weighted C 0.64 Total Aree 23.51171 0.54 Im rvbus Area 1 12.990 1 Mau Percent Impervious 55.2% Q - CIA 1= 7.2In/hr C = Weighted C A - Total area In acres Qa 9.1 Q - CIA I = 7.2 inlhr C = Weighted C A = Total area in acres Q= 1. Q=CIA I = 72 inglr C = Weighted C A = Total area In acres Q = 74 Q - CIA 1= 7.21Nhr C = Weighted C A = Total area in acres SHEET 6 OF 13 DESIGN BY: EAS DRAINAGE AREA C146 CHECKED BY: Post Development C A A ae 1 Dwelling; &Drivewa 2.0,6 10723 2 Sidewalk _ 0.05 1,389 003 3 Street & GLMef 095 5,359 4 Gmem oil 13.251 0,30 6 7 8 .WeIghtedC 0.65 Total Area 1 30.7221 0.71 Impervious Area 1 17.471 1 0.40 Percent Impervious 66.9% DRAINAGE AREA Cl Post Development C A A(so) 1 Dwelling & Driveway 0 is 22,650 052 2 Sidewalk Q,96 29/5 007 3 Street & Gutter 096 10289 0.24 4 Grass 0-25 24-910 0.57 6 7 8 Weighted C 0.66 Total Area 1 60.6641 1.39 Impervious Area 1 35,7541 0.82 Percent Impervious 58.9% DRAINAGE AREA CI-88 Post Develo merit C A A fact 1 Dwelling8 Ddvewa ,._9�__ 29 322 __ 8117 2 Sidewalk Q 9$� 2 296 _ 6_i 3 Street & Gutter _ Q.96 ,,, 10 023 0 4 Grass I Q;6,____1 29 70 0.68 6 I 7 8 Wei 1 0.66 Total Area 71 374 1.84 Im rvious Area 41,641 1 0.96 PorceM Im rvbus 58.3% DRAINAGE AREA CI-89 Post Development C A M A ac 1 Dwelling & Driveway 095 3731 002 2 Sidewalk 095 1130 003 3 Street & Gutter 095 3 826 002 4 Grass 026 11 025 6 7 8 We" hied C 1 0.58 Total Area 19 689 0.45 Im ervlous Area B 687 0.20 Percent Impervious ".1% Q - CIA I = 7.2 INhr C = Weighted C A = Total area in acres Q� 3.29 Q = CIA I = 7.2 inmr C - Weighted C A = Total area In acres Q = CIA 1- 72 irVhr C = Weighted C A = Total area In acres Fa-.--? -771 Q = CIA 1- 7.2 inthr C = Weighted C A = Total area In acres Qa t.lt9 SHEET 7 OF 13 DESIGN BY: EAS DRAINAGE AREA CI-90 CHECKED BY: Post Development C A A ae 1 Dwelling & Driveway 7,117 018 2 Sidewalk 09.5 586 3 Street & Gutter ago 2.473 4 Gmss S / 7. 1 6 7 8 WeE kited C 0.65 Total Area 17.964 1 0.41 impervious Area 1 10,1761 C.23 PerceM Impervious 56.6% I-]'LTJI 111x n Post Development C A M A 8e 1 Dwelling & Driveway 28,785 OGG 2 Sidewalk RM 1582 004 3 Street & Gutter 0,06 5,488 0A3 4 Grass 026 38 COS 6 7 8 .Weighted C 0.54 Total Aresi 71.9051 1.65 Im rvious Area 36,833 0.82 Percent Impervious 49.8% DRAINAGE AREA CI-92 Post Development C A rtZ A ac 1 Dwelling & Driveway 0.06 7.306 017 2 Sidewalk 090 1573 0 3 Street & Gutter 0 5.040 QM_ 4 Gress 0 25 6 7 ....__ .._._,�.. 8 .Weighted C 0.55 Total Area 22,8101 0.62 Im rvious Area 13.9191 0.32 Porcem Impervious 61.0% DRAINAGE AREA CI-93 Post Development C A as 1 Dwelling& DrivewayC 95 1107 2 Sidewalk 03 Street & Gutter I 0.05 4 Grass 0,257 8 _.-.._. -.'_.. .Weighted C 0.84 Total Area 10,862 0.25 Im rvious Area 6.0921 0.14 Porcent Impervious 56.1% Q e CiA 1= 7.2 Inlhr C = Weighted C A = Total area in acres Q= t. Q = CIA 1- 7.2 inlhr C = Weighted C A = Total area In acres Q - 6.42 Q - CIA 1= 72 inlhr C = Weighted C A = Total area in acres Q - CIA I=7.2 inter C = Weighted C A = Total area in acres SHEET 8 OF 13 DESIGN BY: EAS DRAINAGE AREA CI-94 CHECKED BY: Post Develo mem C A A facl 1 Dwelling & Driveway 0.95 8.424 19 2 Sidewalk 095 086 0.23 3 Street & Gutter PRO 3.618 QUO 4 Grass 025 SmO41 014 6 7 8 Weighted C 0.88 Total Area 1 21.0891 0.48 Impervious Area 1 13,0281 0.30 Percent Impervious 61.8% DRAINAGE AREA CI-95 Post Development C A A ac 1 DweMn & D.1mm 02§0. 2 Sidewalk 0,05 136 0 3 Street & Gutter 0" 534 001 4 Grass 0.25 1 0.00 6 7 _ 8 Weighted C 0.85 Total Area 7851 0.02 Impervious Area 1 670 1 0.02 Percent Impervious 85A% DRAINAGE AREA CI-96 Post Development C ac1 Dwellin & Drivewa 0. 2 Sidewalk 095 aAA 0;03 3 Street & Gutter 0 85 0114 Grass 25 Q 4 — 8 7 8 .Weighted C 0.59 Total Area 12,2451 0.28 Im rvious Ara 5,9351 0.14 Percent Impervious 48.5% DRAINAGE AREA CI-97 Post Develo rent C A T A ac 1 Dwelling & Driveway 990 14462 0,33 2 Sidewalk 095 7618 004 3 Street & Gutter 0 Lm 5.181 0.1 4 Grass 0 zi 14:M 034 6 7 8 Wel hted C 0.66 Total Area 35,999 0.83 Im srvlous Area1 21241 1 0.49 Percent Impervious 59.0% Q - CIA i = 7.2 in/hr C = Weighted C A = Total area in acres 61• 288 Q - CIA I = 7.2 iM1r C = Weighted C A - Total area In acres BE = 8!1 Q = CIA I = 7.2 Whir C = Weighted C A = Total area in acres Q = 148 Q - CIA 1= 7.2 Inlhr C = Weighted C A = Total area in acres Q= 386 SHEET 9 OF 13 DESIGN BY. EAS DRAINAGE AREA CI-99 CHECKED BY: Post Development C A ALac) 1 Dweltnq &Dri 000 2 Sidewalk 00 466 001 3 Street & Guller 0. 1,752 004 Grass 026... 2.983 _ 0.^.7 6 7 _ 8 ---- Wei hted C 0.55 Total Area 1 6.2041 0.12 Im envious Area 1 2,2181 0.05 Percent Impervious 42.6% DRAINAGE AREA CI-99 Post Develo mem C A A as 1 Dwell:na & Driveway Qua 3080 007 2 Sidewalk cgs 1,031 002 3 Street & Gu0er 005 3.212 007 4 Grass .25 12 8 7 a .Weighted C o.65 Total Area 12 0.28 Im rWoua Area 1 7323 1 0.17 Percem Impervious 59.1% DRAINAGE AREA C140D Post Development C A A ac 1 Dwelling & Drivem 7405 017 2 Sidewalk gam _ _ 1 166 �(LT 3 Street & Gutter 10,0 6. 4 Grass 0 6 7 a .Weighted C 0.63 Total Area 23.597 0.64 Im rvious Ares 12,3721 0.30 Percent Impervious 54.5% DRAINAGE AREA CI.101 Q - CIA 1= 7.2 inlhr C = Weighted C q = Tom! area in acres Q• 047 Q - CIA I = 7.2 inlhr C = Weighted C A = Total area in acres Q R 1.80 Q = CIA t = 7.21nlhr C = Weighted C A - Total area in acres Q= 2.46 Q = CIA I = 7.2 inlhr C = Weighted C A = Total area in acres QR { SHEET 10 OF 13 DESIGN BY: EAS DRAINAGE AREA CI-102 CHECKED SY: Post Develo mein C A A ac 1 Dwelling & Driveway Off 7586 0.1 2 Sidewalk 093 1.164 003 3 Street & Gutter 4.455 a. t 4 1 9 0,31 8 Weighted C D.53 Total Area 1 25.5231 0.61 Impervious Area 1 13,2051 0.30 Portent Impervious 49.8% DRAINAGE AREA C1403 Post Development C A A ae 1 Dwelling & Driveway 095 7,668 017 2 Sidewalk 095 850 3 Street & Gutter OS5 2.672 005 4 Gress ID,24 0313. 4 6 7 8 Weighted C 0.70 Total Area 1 17.3931 0.40 Impervious Area 1 11,080 0.25 Porcewt Impervious 63.7% DRAINAGE AREA CI-104 Post Development C A A ac 1 Dwelling & Driveway 7,907 011111 2 Sidewalk 096 782 0,02 3 Street & Gutter 00_2.738. 0 4 Grass 6 7 8 Weighted C 0.65 Total Area 1 20.2471 0.46 Impervious Area 11,4271 0.26 Percent Impervious 56.4% DRAINAGE AREA 106 Pose Development — --- E - A.M A ac 1 Dwelling & Driveway0. 2 Sidewalk 006 t 554 3 Street & Gutter 0064,601 1 4 Grass 025d 9 00 8 7 8 Wei hted C 0.67 Total Area 10,287 024 Im rvious Area e,1551 0.14 PercentIm rvious 59.8% Q - CIA I = 7.2 Inlhr C = Weighted C A = Total area in acres Q • $.32 Q = CIA I = 7.21nmr C = Weighted C A - Total area in acres Q= 200 Q = CIA 1= 7.2 INhr C = Weighted C A = Total area in acres Q= 2.16 Q = CIA i = 7.2 in/hr C - Weighted C A = Total area In acres Q =� 1.14 L SHEET 11 OF 13 DESIGN BY. EAS DRAINAGE AREA YI.9 CHECKED BY. Post Development C A A ac 1 Dwelling & Driveway 98 ow 2 Sidewalk ago OPQ 3 Street & Gutter 0 Ilk ovo 4 Grass 0 93 6 7 8 Wal hred C 1 0.25 TotalArea 40482 0.93 Im loos Area 0.00 PemeM Impervious 0.0% DRAINAGE AREA Y140 Post Development C A A Jac) 1 Dwelling & Driveway 0.95 000 2 Sidewalk 0.98 0 3 Street & Gutter 005 099 4 Grass 025 28. 0.62 8 7 8 Wei hted C 1 025 Total Area 25 82E 0.82 Im rvious Area 0.00 Famed Impervious 0.0% DRAINAGE AREA YI-11 Post Develo men C A A ac 1 Dwelling & Driveway 096 00.0 2 Sldowalk _0.96 Ogg 3 Street & Gutter 091 - I - ^0 0 4 Grass 0. 773 D 1 6 I 7 _ 8 Weighted C 025 Total Area 28,713 0.61 Impervious Area 0.00 Percent Impervious 0.0% DRAINAGE AREA Y14 Post Development C A AJac] 1 Dwelling & Driveway0. 0 2 Sidewalk 0900 3 Street & Gutter 0.95 0. 4 Grass 025 M.713 061 8 7 8 Wel hied C 1 0.25 Total Area 26.713 0.81 Im rvlous Area 0.00 Percent Impervious 0.0% Q - CiA I = 7.2 inlhr C = Weighted C A = Total area In acres Q« 16T Q - CIA i = 7.2 iNhr C = Weighted C A = Total area in acres Q« 1.11 Q = CIA 1= 72 inlhr C = Weighted C A - Total area in acres Q W 1.10 Q = CIA i = 7.2 inrhr C = Weighted C A = Total area In acres SHEET 12 OF 13 DESIGN BY: EAS DRAINAGE AREA YI43 CHECKED BY: Post Do lopment C A A ac 1 Dwelling & Driveway 095 2 Sidewalk 022 3 Street & Gutter 0 % 0.00 4 Grass 5 2 .713 0. 6 7 Weighted C 0.25 Total Area 28.713 0.81 Impervious Area 0.00 Percent Impervious 0.0% DRAINAGE AREA YI-14 Post Dewlo mart C A A ac t Dwelling & Driveway 0.95 0,W 2 Sidewalk 0-95 ORR 3 Street & Gutter 0 85 goo 4 Gress _ 0.25 T 3 Pei 6 7 e Weighted C 0.25 Total Area 26,713 0.61 Impervious Area 0.00 Percent Impervious 0.0% DRAINAGE AREA YI-15 Post Development C A A ac 1 Dwelling & Dfiveway 0.95 2 Sidewalk 095 000 _ 3 Street & Gutter Q iB ._.Q:QQ._. 4 Grass 02.5 2$ 1 6 j 7 8 _ Wei htsd C 0.25 Total Anew 26,71310.61 Im ervious Ares 0.00 Percent Impervious 0.0% DRAINAGE AREA YI-16 Post Development C A A ae 1 Dwelling & Driveway 0.00, 2 Sidewalk 09 012 3 Street & Gutter U0, --PAP_ 4 Grass 0 297 3 06 6 7 8 .Weighted C D.25 Total Area 26,7131 0.61 Im ".usAreaI 1 0.00 Percent Impervious 0.0% Q m CIA t = 72 inlhr C = Weighted C A = Total E ec In acres qs 1.1 Q = CIA I - 7.2 k9hr C = Weighted C A = Total area in acres Q- L10 Q - CIA i = 7.2 ifAu C = Weighted C A = Total area in acres Q� 1.10 Q - CIA I=72 inmr C = Weighted C A = Total area In acres w 1.10 f L r-- SHEET 13 OF 13 DESIGN BY: EAS DRAINAGE AREA YI47 CHECKED BY: Post Development C A A ae 1 Dwe:lina & Driveway 2 Sidewalk 0. 3 Street & Gutter 0,96 000 h Grass 025 13.0 030 6 7 a .Weighted C 0.2 Total Area 13268 0.30 Im arvlour Area 0.00 Percent Impeervious 0.0% DRAINAGE AREA Y148 Post Develo meM C A e, I A ac 1 Dwah! & Driveway .% 0.00 2 Sidewalk 0. 3 Street & Gutter 0450. 4 Grass 42671 8 7 8 Weighted C 0.25 Total Area 1 17.104 0.39 Impervious Area 0.00 PereeM Impervious 0.0% DRAINAGE AREA YI-19 Post Development C A fe) A (ae 1 Dwellinp & Driveway 2 Sidewalk 096 000 3 Street & Gutter 095 000 4 Grass 025 t 6 7 a Wel hted C 0.25 Total Areaa 11873 0.36 Impervious_ Area OAO Percent Impervious 0.0% DRAINAGE AREA CIA06 Post Development C A A ac 1 Dwelling & Driveway 2 Sidewalk 095 1451 3 Street & Gutter 095 4 41M 010 4 Grass 020 4 6 7 B Wal hied C 1 0.65 Total Area 9 8- 0 0.23 Im rvious Area 5915 0.f4 Portent Impervious DRAINAGE AREA CI-107 Port Development C A A ae 1 Dwelling & Dnmwav 905 7,644 018 2 Sidewalk 004 493 001 3 Street & Gutter 095 3,867 000 4 Gress 0 6 7 8 Wei hied C 1 0.63 Total Area 1 21.66 0.50 Impervious Area 1 11,8041 027 Percent Impervious 54.5% DRAINAGE AREA CI-108 Post Devalo meM C A M A aC 1 Dwell:nq & Ddyeway ago 3,992 Q 09 2 Sidewalk 01111 883 001 3 Street & Gutter 0.06 3171 QqZ 4 Grass 0,25 0,04 8 7 a Weighted C 0.82 Total Area 1 9.560 1 0.22 Impervious Area 1 7,746 1 0.18 Percent Impervious 80.8% Q = CIA i = 7.2 in/hr C Weighted C A = Tctaf =& :n acms '®8 Q - CIA t=7.2irfir C = Weighted C A = Total area In acres = 471 Q=CiA i - 72 iAii C = Weighted C A = Total area in acres Q v 0.86 Q - CIA t=7.2in/hr C = Weighted C A = Total area In acres Q+ L9 Q=CIA I = 7.21Nhr C = Weighted C A = Total area In acres Q= R Q = CIA 1- 72 :Nhr C = Weighted C A = Total area in acres : 1.plr PIPE SIZING CALCULATIONS The Villages at Turtle Creek 4 Stormwater Management High Density Permit Application Ptoj.: Sob 41: Locefim Pmipe CaI4 Project: Turtle Creek- Phases 4 and 5 ible Job #: 041.05.043 ed Location: Surf City, NC PIPE SECTION AREA (Acres) TRIM ATION GRATE/RIM TO INVERT FROM I TO i Inc. Ac Total Ac Lower End Upper End (Ft) Lower End (Ft) FROM TO BASW ;r 44.000 3.000 3120 C19I CI.92 CI-91 CI-92 1.651 1.651 CI-92 YI-17 0.524 2.174 43.900 3.120 3.450 CI-92 YI-17 YI-17 CI-93 0.305 2.479 43.700 3.450 3.700 Y1.17 Ct 93 CI-93 CI-94 0.249 2.729 42.900 3.700 3.180 CI-93 CI-94 CI-94 Yi49 0.484 3.212 43.850 3180 4453 CI-94 YI-19 YI-18 YI-19 0.393 0.393 43 850 2 600 4 453 YI-1R Y1-19 YI-19 JB-26 0.364 3.969 46.100 4.453 7,168 YI-19 J13-26 CI-95 JB-26 0.018 0.018 46.100 7 V 9 7.169 CI-95 JB-26 JB-26 CI-96 0.001 3.999 45.000 7.168 6.408 JB-26 CI-96 CI-96 CI-98 0.281 4.269 45.000 6.408 6,513 CI-96 CI-98 CI-97 CI-98 0.826 0.826 45.000 6.420. 6.513 CI-97 C1-98 CI-98 JB-27 0.119 5.215 44.000 6.513 5.936 CI-99 JB-27 JB-27 CI-99 0.001 5.216 42.100 5.836 4.349 18-27 CI-99 CI-99 CI-100 0.285 5.501 42.450 4.349 4.802 0-99 CI-100 CI-105 CI-106 0.236 0236 43.150 3.650 4150 CI-105 CI106 CI-106 CI-100 0.229 0.465 42.450 4.150 4 802 CI-106 CT 100 CI-100 JB-28 0.542 6.508 42.900 4.802 5.382 C1-100 a28 CI-101 CI-102 0.467 0.467 41.600 3.666 3.737 CI-101 CI102 CI-102 JB-28 0.609 1,076 42.900 3.737 5.382 C1-102 JB-28 JB-28 BP4B 0.001 7 585 41.500 5.382 4.355 JB-28 BP4B CI-103 CI-104 1 0.399 41350 3.350 3.450 CI-103 C1-104 0.399 CI-10 JB-29 0.465 0.WA 42000 1.450 4.300 0-04 A3-29 3B-29 BP-4B 0.001 0.865 41500 4.300 4.355 8-29 W-45 BP 4B POND 4B 0.001 8.451 N/A 4355 NIA BP-4B POND 4B BP 4E SWALE4B 1 0.001 N/A 3250 RVALUEI BP43 SWALEQ Pipe Calculations NOTES Prc&ct: Turtle Crack -Phases 4 and 5 Compated By. EAS 1) Design method used is Rational Method 5) Velocity percent (Y V) from hydraulic elements table sob A: 04L05.043 Chacked By. 3M 2) "7C demotes e�dsting structure 6) All pipe shall be iIDPE Pipe unless o.her5vise noted I.om= Serf City, NC Date: 4117l09 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak rcnot's for basin outflows PEE SECTION AREA (Aces) INC. TOTA1 AREA SUM p m I R TIME OF CONCEN. PR�DdG INPUT PIPING DATA INVERT ELEVATION1 �VA�TiOON IM GRATE/RIMTO INVERT FROM TO Inc. Ae Total Ac "C" A x C Ac A x C Ac Yeu In/Hr. Qa (CFS) To Snlet (Min) �-'FE Dia. (In) Isngih (Ft) .""$lcPe ) Qf Full (p'S) V'F1dI (��, D'IS) x100) (VaNf x100) Vacmal (FIS) Upper End Lowe E� UPper End Lower End Upper End (It) LowerFROM End (FQ TO 3.ASN 4A - _ -_ - _ _ 5.00 900 p66 p67 1.168 1168 0.32 OelO n610 1 30 72 4_393 O S 15 164.0 0.009 0 8243 672 53 1035 G96 37.9C0 37.40C 40.900 4090 UOC 35 Cl-"C p00 CI-69 CI67 0.784 0784 0.76 0596 0. IO 72 4291 5.00 .4 0.1 15 46.0 0.009 04'1 6149 501 70 1139 546 37.600 37.400 40.50 40900 19W 35 Cl CI67 CI67 CI69 0.555 2.507 0.68 6379 1 I0 72 I14133 5.00 3 $ 0 18 174.0 0.009 U60 t17' 667 97 14 760 37A00 36.350 40,90 41100 3 5DD 475D C2-67 p69 CI69 CI-70 0.920 1427 0.46 10 -. Otf.' 10 72 14 AP 5.00 533 00-4 I 18 24.5 0.009 1 G2 15319 667 .94 114 989 36.350 36.IDO 1 41.10 41100 47S 5.0w CI-69 T-7U CI-70 IB-21 0.323 3 751 1 0.74 0 238 2243 10 72 1 W 5.00 5 58 035 24 �, 125.5 0.009 0.25 16 02 525 98 114 599 36.100 35,780 41.10 40 300 500 4 520 VI-70 JB-21 JB-21 CI-71 0.001 375,1 OAO 0000 2243 ]0 72 1 65 5.00 593 015 1 24 16.0 0.009 029 17457 6Sf 93 114 674 35.790 35,620 40.30 39900 450 4280 JB-21 CI-71 CI-71 p-72 0.443 4194 0.71 03ts 2 56l 10 72 IB 437 5.00 607 00b 24 24.0 0.009 013 18 856 601 98 I 114 6 BS 35.620 35.540 39.90 39 ; 280 4360 C1-71 C1-72 CI-72 YI.10 0.881 3074 0.65 0,16 3137 10 72 '7 5.00 613 023 30 1380 0.W9 0 .11 3$ 719 7 h9 58 1043 8 25 35.340 34.950 39.90 40 U 4 360 5 SW CI-72 YI-10 CI-73 CI-74 0.756 0756 0 5t4 OMS10 72 373.0 5.00 500r056 15 26.0 0.009 192 2 942 1054 29 M 5 913 37.500 37.000 41.30 42 430 1 WO 4450 CI-71 6-74 CI-74 YI.9 0.740 1 0.69 0 1QW 10 72 Toy 5,00 5 25 138.0 0.009 072 7919 u47 93 114 7 37.000 36,000 41.45 4). O0 4450 6 Q74 11-9 YI-9 Y140 0.929 0.23 0 .. 1 10 72 9064 5.00 $ 18 225.0 O.W9 047 10159 587 87 11.15 666 36.000 34,950 4220 40$00I 1} 620O 5550 Yl-9 Y1.10 YI-10 CI-75 0.616 9117 0.25 01 4.55p 10 7 1 7" 5.W 641 048 30 232.0 0.009 U14 34'71 709 94 114 9" 34.950 34A50 40.50 40 th0ft 5550 6AM YT-10 CI-75 CI-75 CI-76 0.848 8 0.65 0551 5 01 10 12 36729 S*W q 30 27.0 0.009 05 137 900 85 1135 1021 34.150 34.000 40.60 40000 6450 bp00 CI-15 7 Cl-76 CI-79 0.472 4 0.56 0 a 1s4 10 72 38 5.00 693 04S 30 242.0 0.009 045 3! S14 W 114 92, 34.0G0 32.900 40.60 78 66g0 5 p-76 CI-79 p-8l C1-80 0.125 0 0.82 0192 01 10 72 738 5.00 Soo 0 15 24.5 0.009 204 13 3 1086 6 62 671 35.500 35.000 39.90 39 900 4 400 4 9W L'I-61 •S0 CI-90 CI-77 0.244 09 0.77 01S8 0221 IO 7 2094 5.00 06 95it 15 Iv05 0.009 754 616 28 a 54 35.000 33.750 39.900 385D0 49M 4750 (.140 CT-77 CI-78 CI-77 0.240 0 240 0.61 0146 0141 IO 72 105S 5.W 5 00 0 25 15 51.0 0.009 0 508 412 21 3 i8 33.900 33.750 39.10 38 500 .200 4 750 CI-78 CF- CI-77 CI-79 1.089 '9'7 0.51 0554 ua91 10 72 7117 5.00 564 00 15 41.0 0.009 133 1 611 028 51 1045 1975 33.650 32.900 38.500 38500 4850 1600 am 79 CI-79 JB-30 0.918 12 ^ 0.67 W o9T( 10 72 40 5.00 737 047 16 258.0 0.009 035 36 74 $ 05 88 14 9I9 32.900 32.ODO 38.500 ;7 DOD 56U0 5 ODD CI.79 la-10 p42 p-83 0.018 01410 0.89 U 16 d. ib 10 ' O 5.00 5 0. 15 59.0 0.W9 U 5l 6 65U 542 2 $3 237 33.000 32.7W 36.050 33 NO 3050 1 100 cl-V CIA11 CI-83 CI-84 0.267 285 0,69 01 02W2 10 72 1... 3.00 334 08 15 4si.0 0.009 043 6149 $Ol 23 34 421 32,700 32.500 35.800 95 3100 3400 CI.83 ('14.1 CI-84 JB-30 0.541 0 827 0.70 u 381 491 10 77. 41 5.W 5 52 0 02 15 14.0 0.009 3 37 7 ( 417 24 85 1221 32.500 32.000 36.000 37 3 500 5 %0 CI-94 30 JB-30 YI-11 0.001 2680 0.10 90 7. 10 72 54112 5.W 7 Old 36 1 88.5 0.009 034 56 7 97 114 905 32mOW 31.7GO 37.DOO %W 5 51 1840 11-31 YI-11 YI-12 0.613 34 0.25 0153 10 7 5547 5.00 $ 014 42 72.0 0.009 0 761!4 196 72 110 76 31,700 31,500 MAN 16500 5100 96DO 11-11 11-12 YI-12 YI-13 0,613 14 0.25 a 2 786,8 30 72 579 5.00 814 018 42 61.0 0.009 025 72 u2.8 749 79 12 819 31.500 31.350 36.5W 35 WO 5 OOD 4 450 t7.12 I-L1 CI-85 CI-96 0.340 0 540 0.64 0 344 0144 10 72 24 5.00 500 007 13 24.5 0.009 U61 7297 195 34 511 32.000 31.850 35,250 35 250 1 250 3 400 C185 p46 CI-86 YI-13 0.705 245 0.65 04$7 9 10 72 5,00 507 0 15 91.0 0.009 051 6 913 564 83 1135 b 31.850 31.350 35.250 35 WO 3 4450 U-13 YI-13 YI-14 0.613 15 0.25 0151 912 IO 72 b3449 5.00 $26 oil 42 66.0 0.009 23 $1%I 8T2 76 Ill 972 31.350 31.130 35.800 15800 4450 4670 Y1.13 1I.14 CI-87 CI-88 1.393 1393 0.66 O "1 10 7 6 5.00 $ 007 15 25.0 0.009 0 52 6 723 S 49 99 114 6 25 32.250 32.120 35.250 35 250 3 OW 3 110 C147 I4t8 CI48 JB-22 1.639 3031 0.66 1OW 2.002 10 72 144) 5.00 5 07 18 43.0 0.009 0 1_ .987 949 96 lib 967 32,120 31.700 35.250 15700 11% 40M C148 JB.22 ]B-22 YI-15 0.001 5932 0.10 Owu 10 72 14412 5.00 514 029 24 101.0 0.009 025 16249 517 89 114 590 31.700 31.450 35.7DO 15 4000 4,350 JB-22 -15 YI-15 YI-16 0.613 3. 0,25 - OtS5 2153 10 72 1561 5.00 543 015 24 56.0 O.OD9 0, 7 16903 539 92 114 614 31.450 31.3DO 35.800 31300 4350 4%0 fl-1 1T-16 YI-16 YI-14 0.613 4 259 0.25 015? 2 10 72 16 619 5.00 5 SI 017 30 66.0 0.009 0 30ID53 6 13 55 104 637 31300 31A30 35.900 35 800 4 500 4 67D 11-I6 YI-14 YI.14 JB-23 0.613 208i7 0.25 0153 11274 10 72 1 5.00 037 014 42 98.0 0.009 044 96214 1001 84 1135 11. If 31.130 30.700 35ADO 162% 4A70 5 11-]4 3 IB-23 JB-24 0.001 20 8 0.10 O 21274 30 7 2 171 5.00 851 O l l 42 70.0 0.009 016 S6 901 94 114 10 30.700 30.450 36.2 36 250 S SSO 5 no J$-21 24 Cl-107 p-]OB 0.497 0,497 0.63 g414 0114 10 72 2261 5.00 5 .023 15 62.0 0.009 032 5 432 41 97.5 4.21 31,400 31,200 34.400 14400 3WO I20A ("M07 -308 p-]OB p-90 0.220 079 0.ffi 0980 O4y3 10 72 3133 5.00 525 05I IS 133.0 0.009 O2b 4784 39A 7; UO] 431 31.200 30.850 34AGO 35 SA 1200 4300 -1 CI-90 CI49 p-90 0.452 - 2 0.56 253 92 10 72 1 819 5.00 S QO 15 24.5 0.009 61 9 297 595 25 I 96 $12 31.000 30.850 35.150 150 4 ISG ; 30U Cl-R9 p-40 CI.90 1B-24 0.412 I 2 0.63 02 1213 IO 72 7291 5.00 $7 016 16 152.5 0.009 023 1 7 524 426 97 114 496 30.850 30.450 35.150 1 Sri 730 4.300 9 40 CIAO 1834 JB-24 HP-4A 0.001 22 421 0. to 0000 P Z07 0 72 465 5.00 03 927 48 025 102 996 S20 86 1l35 9,;1 30.450 30.080 36.250 35100 5 $00 5 VA JB-24 BP-4A BP-4A POND4A 0.001 :22 O.IO MO 1 87 10 12 88 5.00 003 48 040 131158 1044 67 i08 Ila 30.080 30.000 35.100 NA 5020 NA HP4A POND4ABP6A JB-25 0.001 0.10 C9 10 72 DOM 5.00 90 II)1W41! 30 gO 0 44 V7 900 0 3I.500 31]B-23 SWALE 4A 0.001 0.10 OQM 10 72 0000 5.00 IV!(9 '+01 30 244 9362! 1908 0 31.250 31.000 36.100 NA 4850 Nq SB•25 $W ALE 47 1 I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I 1 Z:14I.05.0001041.05.043 Turtle CreadDomWesign%tmmweterki bm 4 and 51PIpe sizing P4-5 Regade Pipe Calculations NOTES Project: Turtle Creek - Phases 4 and 5 Computed By: LAT 1) Design method used is Rational Method Job #: 041.05.043 Checked By: EST 2) "X" denotes existing structure Location: Surf City, NC Date:-4/17/08 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows 5) Velocity percent (%V) from hydraulic elements table 6) All pipe shall be HDPE pipe unless otherwise noted PIPE SECTION AREA (Acres) INC. TOTAL AREA SUM 9 y I PEAK RUNOFF TIME OF CONCEN. P1Prti G INPUT PIPING DATA INVERT ELEVATION GRATE/RIM ELEVATION GRATFAUM TO INVERT TO Inc. Ac Total Ac "C" AxC Ac A x C Ac Year hi/Hr. Qa (CFS) 1 o Inletr ^ (Min) ' Pipe LE�d n (Mtn) B a Len Man "n" (In) (F:) !'-�-`---`- Slope (%) Q f Full (CFS) Vf Full (F/S) ° �0Q (Qa'Qf x100) ° �0V (Va/Vf x100)_�_ Vactual (F/S) U er End Lower End U er PP End Lower End PP U er LowerFROM End (Ft) End (Ft) FROM TO BASIN 4ii3 CI-92 1.651 1.651 0.54 0.891 0.891 10 7.2 6.418 5.00 5DO 0.07 15 24.5 0.009 0.49 6.527 5.32 98 114 6.07 41.000 40.880 44.000 44.000 3 Of10 3.120 CI-91 CI-92 CI-91 CI-92 YI-17 0.524 2174 0.55 0.288 1.179 10 72 8 492 5.00 5,07 038 18 129.0 0.009 034 8.790 4.98 97 114 567 40.880 40.450 44.00 43.900 3 120 3.450 CI-92 YI.17 YI-17 CI-93 0.305 2.479 0.25 0.07E 1 1.256 10 7.2 9.040 5.00 544 0.30 18 111.0 0.009 041 9.656 5.47 94 114 623 40.450 40.000 43.90 43 700 3 450 3.700 YI-17 CI-93 CI-93 CI-94 0.249 2 728 0.64 0.160 1 416 10 7.2 10194 5.00 574 0.13 18 56.0 0.009 0.50 10.723 6.07 95 114 692 40.000 39.720 43.70 42.900 3 700 3 180 CI-93 CI-94 CI-94 YI-19 0.484 3.212 0.68 0.330 1.746 10 72 12.572 5.00 588 0.38 24 131.0 0.009 0.25 16.217 5.16 78 02 5.78 39.720 39.397 42.90 43.850 3 180 4 453 CI-94 Y1-19 YI-18 YI-19 1 0.393 0.393 0.25 0 ft98 0.098 10 7.2 0 707 5.00 5,00 092 15 160.0 0.009 0.25 4.690 3.82 15 76 2.90 1 39.800 39.397 42.40 43 850 2.600 4 453 'r I.18 YI-I() YI-19 JB-26 0.364 3.969 0.25 O.D91 1.935 10 72 13,934 5.00 6.25 0.53 24 186.0 0.009 025 16.330 5.20 8.5 113.5 5.90 39.397 38.932 43.85 46 100 4.453 716,8 Y I-19 JB-26 CI-95 JB-26 0.018 0.019 0.85 0.015 0 015 10 72 0.110 5.00 5.00 132 IS 160.0 0.009 0.25 4 663 3.80 2 53 201 39.332 38.932 46.35 46 100 7.018 7 168 CI-95 JB-26 JB-26 CI-96 0.001 3 999 0.10 0.000 1.951 10 72 14.045 5.00 678 0.38 24 136.0 0.009 0.25 1.16.330 520 1 86 113.5 590 38.932 38.592 46.10 45 000 7168 6 408 JB-26 CI-96 CI-96 CI-98 0.281 4.264 0.59 0.166 2.116 10 1 72 15 238 5.00 7.16 017 24 42.0 0.009 0 25 161.30 520 91, 114 593 38.592 38.487 45.00 45 000 6 408 6 513 CI-96 CI-98 CI-97 CI-98 0.826 0.826 0.66 0.548 0.549 10 72 3 945 5.00 500 014 15 37.0 0.009 025 4 675 381 84 1135 433 38.580 38.487 45.00 45 000 6 420 6 513 CI-97 CI-98 CI-98 JB-27 0.119 5.215 0.55 0.066 2 730 10 7.2 19 654 5.00 7.28 033 30 129.0 0.009 0.25 2Q 631 6-04 66 1075 649 38.487 38.164 45.00 44 000 6 513 5 836 CI-98 J13-27 JB-27 CI-99 0.001 5.216 0.10 0.000 2.730 10 7.2 19-655 5.00 7.61 0.42 30 165.0 0.009 025 29626 604 66 1075 649 38.164 37.751 44.00 42.100 5.836 4.349 JB-27 C1-99 CI-99 0-100 0.285 5 501 0.66 0.199 2 919 10 7.2 21015 5.00 8.03 0.10 30 41.0 0.009 0.25 29 690 6.05 71 1095 6.62 37.751 37.648 42.10 42 450 4 349 4 802 CI-99 CI.100 CI-105 CI-106 0.236 0.236 0.67 0.158 0.158 10 7.2 1.137 5.00 500 0.10 15 29.5 0.013 169 8.405 6.85 14 75 5.14 39.500 39.000 43.150 43150 3.650 4.150 CI-105 CI-106 CI-106 CI-100 0.229 0.465 0.66 0 152 0310 10 7.2 2.234 5.00 5.10 0.48 15 139.5 0.013 0.97 6.356 5.18 35 93,5 495 39.000 37.648 43.150 42 450 4 150 4 902 Cl-106 CI-100 CI-100 JB-28 0.542 6.509 0.63 0.342 3.571 10 7.2 25.713 5.00 814 0.13 30 52.0 0.009 0.25 29-609 6.03 87 1135 6.85 37.648 37.518 42.45 42.9(* 4 802 $ 382 CI-100 JB-28 CI-101 CI-102 0.467 0.467 0.46 0.213 0.213 10 72 1-530 5.00 5.00 044 15 28.5 0.009 0.25 4.655 3.79 33 92 349 37.934 37.863 41.600 41.000 3 666 3.737 CW01 CI--102 CI-102 JB-28 0.609 1076 0.53 0.323 0.535 10 7.2 3.854 5.00 5.14 0.53 15 138.0 0.009 0.25 4.663 3.90 83 1135 4.31 37.863 37.518 41.60 42 900 3.737 5 382 CI-102 JB-28 JB-28 BP-413 0.001 7.585 0.10 0.000 4.107 10 7.2 29.568 5.00 8.26 0.36 30 149.0 0.009 0.23 29.629 6.04 100 113.5 685 37.518 , 42.900 41.500 5 382 4 355 JB-28 BP-4B 37.145 37.900 CI-103 CI-104 0.399 0.70 0.278 0.278 10 72 2.001 5.00 5.00 0.09 15 24.5 0.009 0.41 5.959 4.86 34 93 4.52 38.000 41.350 41.350 3 350 3 450 CI-103 CI-104 0.399 CI-104 13-29 0.465 0.864 0.65 0.300 1 0.578 10 1 72 4159 5.00 5D9 0.16 ' 15 51.0 0.009 039 5.840 1 4.76 1,1 109.5 1 521 37.900 37.700 ' 41.350 42.000 3 450 4 300 CI-104 JB-2, JB-29 BP-413 0.001 0-865 0.10 0.000 0.578 10 72 4.160 5.00 5.25 0.71 15 195.0 0.009 028 4.975 406 84 1135 460 37,700 37.145 42.000 41.500 4 300 4.355 JB-29 BP413 BP-413 POND 4B 0.001 8 451 0.10 0.000 4.685 10 7.2 33.729 5.00 $ b3 0.13 36 58.0 0.009 025 48.146 681 70 109 743 37.145 37.000 41.500 N/A 4 355 N/A BP-413 POND 4B BPAB SWALE4B 0.001 0.10 0.000 4.685 10 72 33.729 5.00 8.63 #N/A 30 93.0 0.009 0.269 30.702 6.26 #N;A #N/A 38.250 38.000 41.500 NYA 3250 KVALUE! BPj113 SWALE4B Z:141.05.0001041.05.043 Turtle CreeklDocslDesignlStormwater\Phase 4 and 5\Pipe sizing P4-5 Regrade CONDUIT OUTLET PROTECTION The Villages at Turtle Creek Stormwater Management High Density Permit Application RIP RAP APRON DESIGN SHEET DAME Apra 10, 2008 10:10AM SHEET ''1 OF .. ...... . .. PROJECT: Turtle Creelr I.D. NO.: Basle 4A _ 48" HDPE PIPE TO BASIN - - - - DESIGN BY: EAS PROJECT NO.: D41.05.043 FILE Slonnwater CHECKED BY: LSM DESCRIPTION: Rip Rap Design LOCATION: Town ofS.rfCly. Pander Coady, NC 25 20 5 0+ 0 Rip Rap Zone Delineation 5 10 15 20 25 Do, Depth of Flow (ft) Notes: 1. Use nexthigher mne for wades>10%. 2. For pipe arch, arch box culveR paved channel outlets, use Oo--Cross eectlonal area or outlettlow. Number of Culverts:. 1 Design Velocity, Vd : lard ffA Flow, Q: 87.35 cgs (Qfromwatershed) Pipe Diameter, Do: 4 R Slope, aep,e = 0.004 RA Using NCDOT Rip Rap Apron Design: Use: Zone 3 L,: 16 ft. L2: 32 ft. W: 10.4 ft. W: 16.8 ft. CLASS 1 RIP RAP USE MINIMUM 24" STONE THICKNESS TOTAL STONE VOLUME= 332.8 if 10752 ft ■ Design Point *Based upon L, *Based upon L2 MINIMUM CLASS L, L2 STONE NCDOT RIP OF Coefficient Coefficient THICKNESS ZONE RAP CLASS STONE R in. 1 w FINE 3 4 12 2 'B LIGHT 3 6 18 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 8 36 5 2 HEAVY 5 10 38 6 2 HEAVY 5 10 38 7I Deslan Is Bevond the Scope of This Method L1 =L—tlrb Proter*CWert L2=Lenplh to Prevent Scour Hole NAME I WEIGHT SIZE SPECIFICATIONS RIP -RAP CLASS IT 5-200 30%SHALL WEIGH AT LEAST 60 Las EACH NO MORE THAN10% SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 25-250 60%BHALLWEIGH AT HALL W e* LBS. EACH NO MORE THAN 5% SHALL WEIGH LESS THAN 50 LBS. EACH OL STONE CLASS A 2-r 10%TOP 8 BOTTOM SIZES. NO GRADATION SPECIFIED CLASS B I 1530D 15_15' NO GRADATION SPECIFIED i RIP RAP APRON DESIGN SHEET i DATE: Apri 10, 20D8 10:13AM SHEET ` 2 OF 4 PROJECT: TIrrys Grcnk LO. NO.: @8SID 4A-4a"Hr1PF PIPE FROM BYPASS DESIGN BY: EAS PROJECT NO.: 041.05.043 FILE: St —Water CHECKED BY: L.SM DESCRIPTION: Rip Rap Design LOCATION: Town of SurrCtiy, Pender County, NC 25 20 �9 5 0 Rip Rap Zone Delineation 0 5 10 15 20 25 Do, Depth of Flow {ft) Notes: 1.1.1—A hloher zone for aradas >10%. 2. For pipe arch, arch, box cuhrart Pared channel outie■, tree DPCrose sectional area of o"flow. Number of Culverts: 1 Design Velocity, Vd : 1o:71 rtra Flow, Q: .. 07.35 ors (Q from watershed) Pipe Diameter, Do: 4 It Slope, a ,,,,= o.0042 IUIL Using NCDOT Rip Rap Apron Design: Use: Zone 3 LI: 16 ft. L2: 32 ft. W: 10.4 ft. W: 16.8 ft. CLASS 1 RIP RAP USE MINIMUM 24" STONE THICKNESS TOTAL STONE VOLUME= 332.8 ft3 1075.2 ft3 i ■ Design Point *Based upon L1 *Based upon L2 MINIMUM CLASS L, L2 STONE NCDOT RIP OF Coefficient Coefficient THICKNESS ZONE RAP CLASS STONE fl. f. m. 1 'A' FINE 3 4 12 2 v LIGHT 3 6 1S 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 8 3e 5 2 H EAW 5 1010 3636 8 2 H= 5 7 Design I. nd the Scope of This McDmd L1 =LenAth to Protect CuNed L2 -Lenath to Prevent Scour Hde NAME I WEIGHT SIZE SPECIFICATIONS LBS RIP -RAP CLASS 1 5-200 30%SW1LL WEIGH AT LEAST 80 Lee. EACH. NO MORE TW W 10%SHALL WEIGH LESS THAN 15 LB3. EACH CLASS 2 25-M 80%SHALL WEIGH AT LEAST So LB4' EACH. NO MORE THAN 5% SHALL WEIGH LESS TI U1N SO LBS. EACt' EROSION CONTROL STONE CLASS 2-S, 1o%TOP 8 BOTTOM svE3. NO GRADATION SPECIFIED CLASS B 15-300 5-15' NO GRADATION SPECIFIED RIP RAP APRON DESIGN SHEET DATE: April 10, ZOOS 16.14AM SHEET J '. OF 4 PROJECT: Turtle Creek I.D. NO.. Basin 4B - 36" HOPE PIPE TO BASIN DESIGN BY: EAS PROJECT NO.: 041.05.043 FILE: Stommader CHECKED Sr. LSM DESCRIPTION: Rip Rap Design LOCATION: Town of Surf City, Pander County, NC 25 20 15 0 10 �9 5 0 Rip Rap Zone Delineation 0 5 10 15 20 25 Do, Depth of Flow (ft.) Notes: 1. Use nod hinher zonefor predw -1O%. 2 For pipe arch, arch, boxculvert paved chmnel outlels, use Dexrass sectlonel arm or outlet low. Number of Culverts: i Design Velocity, Vd :. 6:a1 Rh Flow, 0:: 3527 ore (O from watershed) Pipe Diameter, Da : 3 f Slope, s,em = Calm tlt Using NCDOT Rip Rap Apron Design: Use: Zone 2 L1: 9 ft. L2: 18 fL W: 6.6 % W: 10.2 fL CLASS''' RIP RAP USE MINIMUM 18' STONE THICKNESS TOTAL STONE VOLUME= 89.1 ft3 275A fta ■ Design Point "Based upon L1 'Based upon L2 MINIMUM CLASS L1 L2 STONE NCDOT RIP OF Coefaderd Coefficient THICKNESS ZONE RAP CLASS STONE 1 R in. 1 'A' FINE 3 4 12 2 .1 LIGHT 3 6 18 3 1 MEDIUM 4 B 24 4 1 HEAVY 4 8 36 5 2 HEAVY 5 10 36 8 2 HEAVY 5 10 36 7 1 Dedanls Bevand1he ScopecfTWwMaftd L1 =Lm01h In Protect Culvert L2 =LwoM to Prevent Scour Hole NAME I WEIGHT SIZE SPECIFICATIONS I. RIP -RAP CLASS 5-200 30% SHALL WEIGH AT LEAST 60 LBS. EACH NO MORE THAN 10% SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 25-250 60% SHALL WEIGH AT LEAST 60 LBS. EACH. NO MORE THAN 5%SHALL WEIGH LESS I HAW 50 LBS. EJ E OSIONCONIKULbIONI= CLASSA 2S' 10%TOP'BOTTOM SIZES. NO GRADATION SPECIFIED CLASS 8 153w 5-1, NO GRADATION SPECIFIED RIP RAP APRON DESIGN SHEET DATE: Apri 10, 2008 10:15 AM SHEET 4 OF b ....! . :.:. P,^.GECT: TUNe Crook I.D. NO.: 38a;0 aE6" HOPE-3QPE PIPE FROM SYI'AuE DESIGN BY. EAS PROJECT NO.: 041.05.043 FILE Sbmrwa[er CHECKED BY: LSM DESCRIPTION: Rip Rap Design LOCATION: Town ofSud Ciy, Ponder County, NO Rip Rap Zone Delineation 25 20 EB 4p Z N 7 15 'J z N s ■ Design Point O 10 ZOI 4E 5 ZONE Z N 2 O E 0 0 5 10 15 20 25 De, Depth of Flow (ft.) No es: 1. Llwnexihloherzonefornradwy10%. 2. For pipe arch, arch, box culvert paved channel outleh, use Dd-Crosseecdonel area or oudatilow. Number of Culverts: 1 Design Velocity. Vd 7.a7 R/a Flow, Q: 35.27 cis (Ofromwehnhed) Pipe Diameter, Do:: 31t Slope, sue= 0.0027 ILA Using NCDOT Rip Rap Apron Design: Use: Zone 2 L1: 9 ft. L2: 18 ft. W: 6.6 fL W: 10.2 ft. CLASS 'B' RIP RAP USE MINIMUM 18' STONE THICKNESS TOTAL STONE VOLUME= 89.1 it 'Based upon L1 275.4 ft3 "Based upon L2 MINIMUM CLASS L1 L2 STONE NCDOT RIP OF Coefficient Coefficient THICKNESS ZONE RAP CLASS STONE R in. 1 'A' FINE 3 4 12 2 .1 UGHT 3 6 18 3 1 MEDIUM 4 8 24 4 1 HEAVY 4 6 36 5 2 HEAVY 5 10 36 6 2 HEAW 5 10 36 7 D ' n i nd Ore Sco of Ths Method L1=L-q%to Protect Culvert L2=Lenpdr to Proven[ Swur Hole NAME I WEIGHT CI)F SPECIFICATIONS (LB9 RIP -RAP CLASS 5.200 30% SHALL WEIGH AT LEAST 60 LBS. EACH, NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH CLASS 2 25-250 60%SHALL WEIGH AT LEAST 60 LBS EACH. NO MORE THAN 5% SHALL WEIGH LESS THAN 60 LBS. EACH EROSION CONTROL STONE CLA35 A 2a 10%TOP 8 BOTTOM 312E.3. NO GRADATION 3 CFIED CLASS B 15�OD 5-15" _ _ NO GRADATION SPECIFIED r- 1 GEOTECHNICAL REPORT The Villages at Turtle Creek Stormwater Management High Density Permit Application ENVIRONMENTAL SERVICES, INC. 524 S. NEW HOPE ROAD RALEIGH, NORTH CAROLINA 27610 919-212-1760 • FAX 919-212-1707 www.environmentalservicesinc.com 22 November 2006 Mr. Everett Gupton, E.I. Cavanaugh & Associates, P.A. 130 North Front Street, Suite 202 Wilmington, NC 28401 Re: Turtle Creek Phases 3-7 ESI Project # ER06-043.04 Soil Evaluation Pender County, North Carolina Dear Mr. Gupton: During August through October 2006, Environmental Services, Inc., (ESI) conducted soil evaluations for thirty areas proposed for stormwater disposal within Phases 3-7 of the Turtle Creek project located near Surf City, Fender County, North Carolina. 'this evaluation included the advancement of hand -auger borings throughout the site in areas previously determined to be non jurisdictional upland areas. These evaluations included determining the depth to seasonal high water table (SHWT) as well as a determining infiltration rates by conducting in -situ saturated hydraulic conductivity (K,.t) tests at twenty-six of these locations. Available information reviewed prior to the held investigation included the U.S. Department of Agriculture Soil Survey of Pender County, North Carolina and the United States Geological Survey (USGS) 7.5-minute topographic quadrangle (Holly Ridge, NC). The areas of the site evaluated are mapped as Kureb fine sand (KuB), Leon fine sand (LnA), Mandarin fine sand (Ma), and Onslow loamy fine sand (On) based on the Soil Survey of Pender County, North Carolina. Soil Evaluation Soil borings were advanced to a depth of greater than 60 inches below the ground surface (BGS) where possible within the proposed stormwater disposal areas within the project site. The borings were characterized for the following criteria: texture; color; structure; soil depth; depth and thickness of any restrictive horizon(s) if present; depth (if present) of a SHWT; and topography and landscape position. Onslow loamy fine sand Portions of the soils evaluated within Phases 3 through 5 are generally similar to the Onslow loamy fine sand series. The surface horizons extend to a depth of 10 inches BGS with textures generally consisting of fine sand. Soil structure within the surface horizons is generally weak medium granular. The subsurface horizons extend from depths ranging from 10 inches to greater than 60 inches BGS with textures generally ranging from sand to sandy clay loam. Soil structure within the subsurface horizons ranges from weak fine subangular blocky to massive. Restrictive horizons were not observed between within 60 inches of the soil surface at the areas evaluated. Evidence of a SHWT was observed from 12 to 34 inches BGS. Topography within these areas is generally flat with slopes ranging from 0 to 3%. LJACRSONVILLE • ST. AUGUSTINE 0 COCOA • JUPITER • DESTIN 0 SAVANNAH • ATLANTA • RALEIGH • CHARLOTTE • ASHEVILLE ENVIRONMENTAL SERVICES. INC. Turtle Creek Phases 3-7 Soil Evaluation 22 November 2006 Page 2 of 4 Mandarin flue sand Portion of the soils evaluated within Phases 4, 5 and 7 were generally similar to the Mandarin fine sand series. The surface horizons extend to a depth of 6 inches BGS with textures generally consisting of fine sand. Soil structure within the surface horizons is generally single grained. The subsurface horizons extend from a depth of 6 inches BGS to depths ranging from 18 to 20 inches BGS with textures generally consisting of fines sand. Soil structure within the subsurface horizons is generally single grained. The upper subsoil horizons extend from depths of 18 to 20 inches BGS to depths ranging from 36 to 42 inches BGS with textures generally consisting of fine sand to sand including weakly cemented fine sand. Soil structure within the upper subsoil is generally massive. The lower subsurface horizons extend from depths ranging from 36 to 42 inches BGS to. depths greater than 60 inches BGS with textures generally consisting of fine sand to sand. Soil structure within the subsurface horizons is generally fine sand. Restrictive horizons were not observed within 60 inches of the soil surface at the areas evaluated. Evidence of a SHWT was observed from 26 to greater than 44 inches BGS. Topography within these areas is generally flat with slopes ranging from 0 to 3%. Leon fine sand Portions of the soils evaluated within Phases 7 are generally similar to the Leon fine sand series. Portions of the soils evaluated within Phases 4 and 5 appear to be within the transition zone from Mandarin to Leon. The surface horizons extend to a depth of 6 inches BGS with textures generally consisting of fine sand to sand. Soil structure within the surface horizons is generally single grained. The subsurface horizons extend from depths of 6 inches to depths of 16 to 22 inches BGS with textures generally consisting of fine sand to sand. The lower portions of the subsurface horizons contain layers of weakly cemented fine sand. Soil structure within the subsurface horizons is generally single grained to massive. The subsoil horizons extend from depths of 16 to 22 inches BGS to depths greater than 60 inches BGS with textures generally consisting of fine sand to sand. Layers of weakly cemented fine sand are present within the subsoil horizons. Soil structure within the subsoil horizons is genemlIy single grained to massive. Restrictive horizons were observed at depths ranging from 16 to 22 inches of the soil surface at the areas evaluated. Evidence of a SHWT was observed less than 12 inches BGS. Topography within these areas is generally flat with slopes ranging from 0 to 2%. Infiltration Rates Infiltration rates were measured at twenty-six locations on the project site. KA measurements were conducted with a compact constant head permeameter (cchp). These measurements were conducted at soil depths ranging from 10 inches to 29 inches BGS. The measurement locations were areas that may be potentially used for wastewater infiltration basins and/or stormwater infiltration devices. A detailed soil profile description was completed at each test location. The in -situ KSat values were calculated based on field measurements using the Glover Equation. Km measurements ranged from 0.36 inches/hour (+n/hr) to 9.43 in/hr [5.38 gallon.s/day/square-foot (gpdW) to 141.04 gpd/ftz]. Table 1 summarizes the in -situ Kw measurements for each location and includes: location; soil series; depth to SHWT; depth and horizon of conductivity test; and conductivity measurement at each location. EwiRONmENTAL SERVICES, INC. Turtle Creek Phases 3-7 Soil Evaluation 22 November 2006 Page 3 of 4 Table 1. Soil Boring Information and In situ Saturated Hydraulic Conductivity Measurements. Soil Boring and/or Conductivity Test Number Soil Series Present Depth to Seasonal High Water Table inches BGS Depth/Horizon (inches BGS) Result gpol in/hr K.g 3-1* Onslow 34 29Bt 59.97 4.01 ,t 3-2* Onslow 26 21Bt 95.70 6A0 K,■t 3-3* Onslow 26 29Bt 25.70 1.72 K.■■t 3-4* Onslow 26 21Bt 94.78 6.34 K■■t 3-5* Onslow 26 28Bt 100.25 6.70 SB 3-6* Onslow 30 N/A N/A N/A SB 3-7* Leon 18 N/A N/A N/A RS-1+ Onslow 26 N/A N/A NIA RS-2+ Onslow 35 N/A N/A N/A RS-3+ Onslow 22 N/A N/A N/A ■ 4-1* Onslow 24 19B 6.28 0.42 K■,t 4-2* Onslow/Leon 18 11 2034 1.36 K■■t 4-3* Mandarin 32 24 22.63 1.51 K„t 4-4** Mandarin 44 11 5.60 0.37 Kyt 5-1** Mandarin 36 14 6.28 0.42 K..t 5-2* Mandarin/Leon 26 13 26.67 1.78 K.t 6-1 Onslow 28 16 5.38 036 K.t 6-2 Kureb 36 24 86.58 5.79 6-3 Kureb 36 16 118.48 7.92 K■■t 6-4 Kureb 26 23 9.03 0.60 &8t 6-5 Onslow 30 23 7.67 0.51 Kit 6-6 Kureb 31 14 24.33 1.63 K■■t 64 Onslow 34 12 109.37 7.31 K9■t 7-1** Leon <12 N/A NIA N/A K■pt 7-2** Mandarin 36 15 95.82 6.41 K.t 7-3** Leon <12 14 85.43 5.71 K■,t 7-4* * Leon 12 13 90.66 6.06 K■ 7-5* * Mandarin 28 12 65.88 4.40 K■.t 7-6** Mandarin 26 10 98.10 6.56 Kut 7-7** Mandarin 24 13 98.21 6.57 K3it 7-8** Mandarin 24 11 141.04 9.43 1(,t 7-9** Leon <12 10 129.61 8.66 A-1**+ Mandarin 30 N!A N/A N/A *Denotes SHWT depths approved by NCDENR personnel on 15 August 2006. **Denotes SHVJT depths approved by N,DENR personnel on 16 November 2006 +Denotes soil borings only; Ksat test have not been conducted at these locations as of the submittal of this evaluation. ENVIRONMENTAL SERVICES, INC. Turtle Creek Phases 3-7 Soil Evaluation 22 November 2006 Page 4 of 4 An on -site soil evaluation was conducted on 15 August 2006 and 16 November 2006 with Mr. Vincent Lewis of the N.C. Department of Environment and Natural Resources (NCDENR) — Division of Soil and Water Conservation. The SHWT depths, as approved by Mr. Lewis, are listed and denoted separately above in Table 1. The remaining SHWT depths have not been approved by NCDENR as of the submittal of this evaluation. Conclusion ESI evaluated soil borings at thirty locations and conducted saturated hydraulic conductivity tests in twenty-six locations in areas proposed for stormwater infiltration devices. Evidence of SHWT was observed within 12 inches of the soil surface to greater than 44 inches BGS within the areas evaluated. K,g measurements ranged from 0.36 in/hr to 9.43 in/hr (5.38 gpd/fe to 141.04 gpd/fO). Thank you for allowing ESI to be of service to Cavanaugh & Associates, P.A. Please call me if you have any questions. Sincerely, ENVIRONMENTAL SERVICES, INC. ]osh Witherspoon, LSS Senior Scientist Attachments. Soil Boring and K,. test Iocation map v qww � di � O�tvE. �+1�_ � 7� � r ii •- a �, fa"3 _ dp a.i p � ;y'•� im y L Property Boundary r C� Approximate Phase III _ z Boundary + Soil Boring Location ® K-sat Test and Sow S Boring Locationr7 0 200 500,E Fs FM , 11Wi.Oe gmfmc , Svuas' U603 Im cd.10aw Mope, _ HMYRW2.Q.*.VK6b OKrpa+I b/ cF�sr.�pn a aawaar., Fw. 'paawne:aYreu.+map�a.arp.rr �' .�.r,ucr �w+.�namr•.. ,� ENMON.MENTAL Project ER06043.04 SERVICES, INC K-sat Test and Soil Boring Locations Dale. Nov 2006 Turtle Creek Phases III VII Soil Evaluation Vy21b�'a1iNOt Pender Couriy, North Carolina DrwNChkd: Ad5fJ1N P`iwbswiww4V0o<a.xN�.n�..PFal.e,.vw006�9'.aPM WATERSHED CLASSIFICATION The Villages at Turtle Creek Stormwater Management High Density Permit Application State of North Carolina Department of Environment and Natural Resources Division of Water Quality WATERSHED CLASSMCATION ATTACEMENT Any -changes made to this form will result im the application being returned. (=S FVRMMAYBEPHOTOCOPIEDFOR USEASANORIO1NAr,) INSTRUCTIONS.' TO determine the classification of the watersheds) in which the subject project will be located, you are requiMd to submit this form, with Items 1 tbrough 8 completed, to the appropriate Division of orator Quality Regional Office water Quality Supervisor (see Page 2 of 2) prior to submittal bf the application for review. At a minimum, you must include an 8,5" by 1l" copy oi' the portion of a 7.5rminute USGS Topographic Map that slows the surlbcu waters immediately downslope of the project. You must identify the location of the project and the closest do•wnslope surface .waters (waters for which you are requesting the classification) on the submitted map copy. if the ki Loiiity is located in the Neuse River P asin, also include a copy of the soil survey map for the project locaadoa. The corresponding non-&scharge application may not be submitted until this form is complet by the approprist.: regional office and included with the submittal, 1. Applioanfa name (name of the.rrawaieipality, corporation, individual, etc.): Dilah ' er C:om—wmitll�. Inc. 2. Name and complete addre: s of applicant: Dilsheimer Communities Inc (T1Mium) - 401 9V Avek 7l. Q City: Bala State: Zip: 19004 T$lephone number: ( 610 ) 617. 9700 ' Facsimile number: (610) 617.9933 3. project name (name of ihe subdivision,, facility or establishment, etc.): The Village at T e Creole 4. County where project is 10:,ated: Pander CagM - 5, Name(s) of closest surface waters_ Beek -vs Creek 6. Riverbasin(s) in which th.' project is located: Pape FggCMOr Basin 7. Topographic map name MLd date: USG5 Quadronele Mao -Holly Ridge NC: Air 77 35' 35" "016 8. North Carolina Profession al Engineer's seal, signature, and date: • 407� $ TO: REGIONAL OFJV1CT'VVA') ER QIUALXTY STJPEP-VISOR please provide me with the cl ssaif'acation(s) of the surface waters, wa s), "A pprop river basul(s) where these activities will occur, as i Jeitified on the attached map segment: Names) of surface waters and river basin(s). � r �,,s Cr �6k W t. 4r BA1.Z0L- Classifioation(s)(as establishcd by the EMC): "_ ► Hd.Vd,, iNt Y 1$-A Proposed classifteation(s), if i.pplicable: River basin buffer rules, if ap: placable: 544L ?61ft*- kV L41 �U&M0C.. Signature of reglonal office personnel: Date: r FORM: WSCA 10199 Page 1 of Me UHNIMS'IIa M 60:9T 600Z/60/0 Army Corps of Engineers Notification of Jurisdictional Determination Approval Letter The Villages at Turtle Creek &ormwater Management High Density Permit Application AUG. 3.2006 2:36PM NO.626 P.2 U.S. ARMY CORPS OF ENGIl + IRS 4VIITOTON DISTRICT Ac m 1d. may: Pmder U.S.t3.S. QUEL. HaLaft NOTMCATION OF JURISDIC130NAL DETERKMATION hmpmV Owner: VAm nikefiner Aft: Robert Tumba A mer Commumm ofNor&C I" Environmental Service, Inc. Addrms: 401 Ciiy A"jnW, Salto 710 534 Sour New Hope Road Bala CyWOs PA 19M RalaWk, MCC 27610 Phom Number: (910.212.1760 Size (ores) 244 sera Nemist Town HOW Nearest Waterway Creek River Basin VOLEM * ,,,,,,�.�UJ�S08 HUC �n.� .. 8300MOI �e 1. Co ffmatm �T N 3"567 W ,77 JM Lw c%ft de ion: he J"CZad nrdWOM R i1BAt� 20 thl 1� WA AU r7 t M n�_f__S�JFM_AIVI Indicate Wit ch of &gFONgEk_S ADDI<{►3 Based on pmlmtiuq fGflOutm fiM thm-e may be wedmxb an the above deecftil property. We sti'm* mw.9 you have brio property iris dzd to actnnuino tba w*& of DVmtnad of dw Army MA) jurbdicft To be aonsidwMaL a judsdic mal determimtion mast be verified by the Cmps. This preliminary determinadon is not an appealable aatkm miler the Regalatmy PMFom AdmmLghm Iva Appad ftems (Rahrence 33 CPR Part 331). _ Thera my Nrv%able Wow oftbe UWted Ewa within the above desmibed property subjeat to the permit mgmrma*s of Section 10 of die Rm= and Herbora Act and Section 404 of 9Le Glean water Act. Unless there is a change in the law or = peiidmd regulations, Us determhMon mey be relied apoo Or a period not to exceed ilve yearn from the date of this won. We straogiy suggest you have live We&A on your properly delineated. Dae to f1m size of ycw properly an&0 r our prvsmg wu&oad, the Caps may riot be ab1Q to soaonaplish tl h wetland dew in a timely manner. For a more timely dew, you may wish to obtain a Couultarit Tube considered final, ariy deliaeatiw must be verified by the Caaps. The wadmu s hm been dreTmoaled and amvcyed and era ably deplood an fbe plat signed by the Cop Regulatmy OlB W fdenilfied below on . Unless there is a cbanp in the law ar ow publiehcd regslWkm4 this datminXim may be reied upon for a period not to exceed five years from tba date of ibis Cana. Thm vane wom o£tbe U.S., to bachWe we*.knde, present on the above da mibed properly wbich are subiaaot t+o the permit mquirament& of Section 404 of ft Clem WaVe Act (33 USC 1344). Unless thmv is a change in the law or oiu ptabliahedreplad ms, this detummadon maybe relied upon ft a period is Wmed five years 0= the 40 Ofthis notliic dOL FW. 3.20O6 2:37PM NO.626 P.3 Action ID: 200600208 Plm meat of dredgmd or MI mzWW wig watmrs of the US and/or wetlands without a Deparbna t of the Army pcmft mqr omtltate a violation of Sacdom 901 ofthe Clem Water Act (33 USC j 1311). If you hm mW questions regarding this dBWmai=dm mdlor dw Corps regalatioxy XvgM plow 000nd W R.onnfe Bmfth st i910) 23140 77! 7 M -.y �'. �i - i y��_ fJ_ - J -<<. i �l�_ _t!1_ i__} work in age areas. cocPs Regulawy Dffiolal adtho' aft e FOR OFFICE USE ONLY: • A plat or dlotch of the property and the wetaand data frm mast be aftabed to the Me copy of this trm, • A oopy of't m "Notification Of Admmiskativo Appeal Options And Process And RagL mst For Appeal" form must be Ummibd wit the pt+o wW ow=Yagft oopy of this form, a If tiie prapmW cis isolated wedanddwaum pl®sea indmAm in "RmmuWl section and dbwh #lie "Isolated Debermiamtion won Sheet" to the file copy pfthis fm m. rage 2 of 2 ALIG. 3.2006 2:37PIl NO.626 P.4 'The term °adjacent° mm m bmdedng, ao dam s, or nes6bodog, Weft& sepe sW ham otba wafters ONO US. b9 mM-made dais cw banium oahmai rhir borate, bomb dt m. sad fW 11 oo m also sdjeaxit. f/l1�Iw/yi,�ii_i-l-Dikhd o File 1�i1.LL1LL u: ��ai� FD=.: VO De +�1W205 }A�,� � q Y � flilandMtr COomaamitdes Of NOrth (oNr Whsa, LLC AMP*ed is: See Section below DTZTIAL PROFD 1'BRl1'i' Stand* Permit or Lr of ermisaioa A PROS PERMIT Standesd Pa=ut or Led= of ' sion B PERMITDENIAL C x APPROVM AMMICTIONAL DETM M gATraN b PRELMINARY 3URISDicnONAL DETERMNATION E i __- � —'�. ,_- �.,;p. - _ - - _ - 'sue `-- _ �"�R• d� �7x ��dc�. r.s—=ria[ .._F-.E•e:.N.Mr '•3ai_{=i. _ _-°�: & WITM PROS PELT: You may ucW or objeet to dw permit • ACCEM. Byes nemhmd t Standard Permit, you=W sipto pit document mid return it to the dimtrlet engineer ilb r final Whazintloa. Ifyoureceived almser orPwn sion QXft you may accept tie LOP and yottr work is 8iorind. Your siPOM on to Sttudard Permit or soeegtanea of the LOP means that you accept the permit in its entirety, and waive ull rigbis to appeal the permtt', kc1u fttg its terms and conditions, end approved detoxnminatiottsassociated wltitthe pernnit. e OBIECT: If you object to ilia petmt h (Standard or LOP) because of certain term$ and condifi mg fine , you may raquawt that the permit be modified accer hqk. You must comp1eto Section It of this form aml rat= ibo farm m the district eatgir M, Your objccd= must be received by the district engiteer within 6o days of the date of title notice, or you will forfeit your right to appeal the permit In the future. Upon receipt ofyour inter, the district engineer will evahmte you objwd= and may: (a) modify the permit to address all of your concems, (b) modify the permit to address some of your objocdm, or (a) notmodify the permit having ddmmined 'tit the p mu& WwWd be bmued ea previomsly win. Aft evoluatatg ymr objeciiasta, the district engineer will send you a proffmadd, permit for your reaowkhmflon, as indimted in Section B below. B. PROS PERMIT: You may aempt or appeal the permit a ACCWT. If you received a Storidwd Peanut, you may sign fie permit document and re = it to the dtda ca&ew for floal m hwhzd m. If you recelved a Letter of Permission (TAP), you may accept the LOP and your wore; is mtt temized. Your signature ' on the Steadard Pemdt or acceptance of the LOP merits that you socept the permit in its entire', and waive all rights to appeal the permk tw u hng im forms and condidow, and appmved juris"onal determinations associated wAthe permit. • APPEAL: Ifyou goose to d the profred pets h (Stmdard or LUP) because of certain trams and comxHdm titmcin, you may appeal this declined permit tinder the Corps of Eughoers Administrative Appal Proems by amvietiag Seadon it of this form, wd xmdkg the Irm to the division wgiuser. This ibmt mumt be received by the division em&eer wife 60 days of the date of ibis notice. C: PERM DBNIAL: You may appeal the denW of a psaatait tinder the Corps of Bagiaeeea A ve Appeal Process by comple ft Seetiomm H of this fbmm and sending the farm to the division engineer. Ibis famm must be received by time dividm aglaw wnin 60 days of tin dabs of ibis notice. NO. 626 P.5 D: APPROVED RLWSDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: Yen do tot aced. to aotdy the Coups to accopt IM approved M. Fp hre bo notify tha Coxes witbin 60 dogs offe date of this no&A man that ym awW the approved JD is its ena+oty, ad wain all rights to appeal the a_aoved JD. • APPEAL: If you disco with the sppmved JD, You may appeal 13ta approved. JD uodcr the Corp of Hughmers AdInkMiiive ApPeni Proaesa bq 0MV11 s Section II ofthis feam and Milms the form to the division '. This frm must be received by the dividou engbeer vd&k 60 days ofthe cube ofthis wdw. E: PRELi1VMARY JURISDICTIONAL DETERMINATION: You do mot teed to nVonci to the Corps regaling the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (wWoh may be appealed), by contaa4ng the Corps district for thither instsacdm Also you may provide new Information for fiu*a oon4deradon by the Corps to reevaluate the JD. - \!_.R:'rY' r R O•in.! 'u•'-d. r . �3 i8 '.S'C1' _•-_ �T Y3%1 y r'; V, 'aa' }'•! s:- r Aai•■■ r .INS. .ii Ir: ••: � .: m K!�. 5. 'Y_u':r.j S T .:ry�, R01 G_ 1 t •use -•'� -•�;• REASONS FOR APPEAL OR OBJECTIONS: (Desmibe your reasons for appealing the decision or your objections to an initial proffered permit in clear ootalse its. You may attach additional information to this ibrm to clarify where yona realm or objections are addressed m the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the motive r+eeord, the Corps maztorandtun for the record of the appeal oonfCrence or meeting, and any supplemental infonumon that the review ofcar has determined is needed to clarify the administrative record. Neither the appellant nor the Carps may add new h6nnation or analyses to the record. However, you may provide additional infarmation to clm* the lDt;ation. of won Und is = in the adminiAXIstive raoard. ti. _ _"+-.P8 r • If you have questions regarding this decision and/or __ If you only have questions regarding tho appeal process #ire appeal proc is you may contact: you may also cow; Ronnie Smith W. Mike Bell, eve Appeal Review Officer VS Army Corp of Engumn CESAD-ET-CO-R PO BOX 1890 U.S. Army Corps of Engineers, South Atlantic Division Wilmington, NC 28403 60 Famyth stet, Room 9MIS A 30303-8801 RIGHT OF ENTRY: Your signature below grants the tight of entry to Corps of Engineers personnel, and, any govc=umt consultmds, to conduct inveotigations of the project site daring the oourse of the appeal process. You WM be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site Date: Telephone number: SITE LOCATION MAP The Villages at Turtle Creek Storn7water Management High Density Permit Application DRAINAGE AREA MAPS The Villages at Turtle Creek Stormwater Management High Density Permit Application WM. DRAINAGE AREA AREA (ACRES) AREA 4A 22.41 AREA 4B 8,45 T❑TAL PHASE 4 & 5 DRAIAGE AREA 30,86 NOTE: ALL DRAINAGE FROM PHASE 5 TO BE DIRECTED TO BASIN 4A AND 4B AS SHOWN. DRAINAGE AREA 4A DATA TOTAL AREA IMPERVIOUS AREA PERCENT IMPERVIOUS WEIGHTED C VOLUME 1.5" RAINFALL VOLUME INFILTRATION BASIN 4A 22.41 ACRES 9.39 ACRES 41.9% 0.54 52,115 CU. FT. 54,786 CU. FT. DRAINAGE AREA 4B DATA TOTAL AREA 8.45 ACRES IMPERVIOUS AREA 3.98 ACRES PERCENT IMPERVIOUS 47.2% WEIGHTED C 0.58 VOLUME 1.5" RAINFALL 21,816 CU. FT. VOLUME INFILTRATION BASIN 4B 33,279 CU: FT. L