Loading...
HomeMy WebLinkAboutSW8060949_Approved Plans_20071203— — -- — — — ROW LINE/PROPERTY LINE -- — SANITARY SEWER —ss —SS —SS — c= F^ SEWER FORCE MAIN—n+—rn--rnVVA F? - wte WATER LINE "^R'— � CULVERT/ STORM PIPE TOWN OF SURF CITY STREAM/DITCH SEDIMENT FENCE SF RCOUNTY N0RTH �AR�LINA SEWER MANHOLE OPENDE � UTILITY EASEMENT PLUG VALVE/GATE VALVE N OWNER , e�aW_oFF BO o r '+ DCNC NORTH CAROLINA I, LLC � FIRE HYDRANT ASSEMBLY � 2528 INDEPENDENCE BLVD., SUITE 104 � +�saw Q EIP EXISTING IRON PIPE WILMINGTON, NORTH CAROLINA 28412 �►` �� oEMN EXISTING MAGNETIC NAIL 910) 790-9880/(910) 790-8759 (flax) 4"w we O EPA EXISTING PARKER—KALON NAIL (� EXISTING PROPERTY CORNER LIMITS OF ADISTURBANCE—L°°—L°°—"—LOD— rr ENGlNEERFA JUNCTION BOX (JB) CAVANAUGH AND ASSOCIATES, P.A. YARD `"`ET tYI> ° 130 NORTH FRONT STREET, SUITE 202 BYpRss BOX {BP} s� WILMINGTON, NORTH CAROLINA 28401 � CATCH BASIN/CURB ,NET (Ca) BOX CULVERT (910) 392-4462/(910) 392-4612 (fax) — �o — -- MAJOR CONTOURS io MINOR CONTOURS a RIP RAP URVEYORINFILTRATION BASIN .(TREATMENT AREA) CHARLES F. RIGGS & ASSOCIATES, F.A. � 1i��F WETLANDS 202 WARLICK'STREET VEGETATIVE FILTER P.O. BOX 1570 `— FINISHED FLOOR ELEVATION FFE JACKSONVILLE, NC. 28541-1570 DRAINAGE AREA BOUNDARY (910) 455-0877 APPROVED MANAGEMENT COMMISSION jim DIVISION 0F WATER QUALITY % PLANNEROF" HADENSTANZIALE REMAINDER ' SHEET INDEX 3807 WRIGHTSVILLE AVE. of SITE C.3.1 OVERALL SITE PLAN C.3.7 PHASE 3 OVERALL SITE PLAN SUITE 24 f' OD PHASE aTKwso�v C.5.6 PHASE 3 OVERALL STORMWATER PLAN -� � � z � ' . �ooP WILMINGTONNC 28403 PHASE 2 C.5.7 PHASE 3 STORMWATER PLAN DRAINAGE AREA 3A & 3B , — o ,,, 910 791-838%:) ° � ° > _�' � PA 1 ROAD C,5,g PHASE 3 STORMWATER PLAN, DRAINAGE AREA 3C & 3D ............. �s ��. C.7.9 STORMWATER GENERAL DETAILS 1 APR 0 4 2007 P.�'NDER COUNTYC.7.10 STORMWATER GENERAL DETAILS 2 ` NORTH CAROLINA NC HIGHWAY 2�o C.7.11 STORMWATER GENERAL DETAILS 3 � ��# �a��C.7.12 STORMWATER GENERAL DETAILS 4 Dw4� C.7.13 STORMWATER GENERAL DETAILS 5 ' VICINITY MAP FINAL DRAWING c.7.1 4 STORMWATER PLAN, BASINS 3A, 3B, 3C, AND 3D DETAILS PHASE 3 SPECIFICATIONS. FOROcoNsLEAc oN NOT TO SCALE BEFORE YOU DIG ! ,��� N ROt'' CALL 1-800-632-4949 DISTURBANCE ACREAGE 21.4 .�°o�� � " N.C. ONE -CALL CENTER ,,?f� �� AL IT'S THE yaw ! PROPOSED LOT COUNT - 0 29 SINGLE FAMILY 53 � Solutions rough integrity and partnership DATE: APRiL 4, 2007 PROD. ND.: 041.05.043 44 0 vct)' 09 ----- 4,, vv Qp p 40 o.s. 84jor 14 1.0 -,04 < ra.JOG X/ NOVI OR ERLY NOW OR FORMERLY NELLIE M RE CURIA J. DEARMAS & D.S. 456. 216 NORMAN e, SHEPPARD 4, RE 0.8. D.S. W. P. 140 NOVI OR FORMERLY 4,�lk �CLORIA J. 0EARMAS do NORMAN E. $HEPPAPO 0.8. 997. P. 140 LOT LEGEND NOW OR FORMERLY EPAMETT SNIFF 0.6. 810, P. 125 M.B. .4. P. 55 PHASE 2- (28 SINGLE FAMILY LOTS) PHASE 2 -0, NOW OR FORMERLY PRESTON C. KINC, Ili WE JOYCE RENEE KING 0.0, 1492. P. 267 NOW OR FORMERLY WOODY L. ATKINSON 0.8. 661. P. 238 NOVI OR FORMERLY SHMA ATKiNSON $LATER D.U. 7". P. 31 M.18. 22. P. 35 zaN pzoo, zollvp; tA 114-1 NOW OR FORMERLY SHOLA ATK4.14SO.14 SLATER 0,9. 730. P. 41 M.G. 22. P. .35 PHASE 1 (53 SINGLE FAMILY LOTS) LINE TABLE LINE " LENGTH L1 182.79 L2 1512.41 L3 568.02. L4 316.70 L5 92-23 L6 85.98 L7 153-11 L8 108.14 L9 159.23 L10 192.24 Ll 1 126.20 Ll 2 177.53 L1 3 339.50 Ll 4 360.00 Ll 5 337.35 L16 135,83! L17 125.75 L18 69-34, Ll 9 114.82 L20 81.51 L21 92.63 L22 41.10 L23 52.64 L24 31-86 L25 93.'33 L26 78.04 L27 60.18 L28 53.83 L29 32.79 L30 71.19 L31 77.81 L32 32.42 L33 114.58 L34 43.85 L35 49.36 L36 96.02 L37 101. PHASE 1 (43 SINGLE FAMILY LOTS) NOW OR FORMERLY WOODY L. ATKI44SON 0.8. 061. P. 240 U.01 27, P. 35 LINE TABLE - �i LINE 'LENGTH L38 108.06 L39 51.61 L40 98.66 L411 52-08 L4.2: 76.26 L43 25.20 L44. 69.24 L45 44.93 L46 39-65 L47 132.30 L48 298-01 L49 238.87 L50 500.95 L51 393-64 L52 53.03 L53 231.25 L54 2886.38 L55 100.57 L56 1105.91 L57 210.60 L58. 758.66 L59 89-55 L60 192.09 L61 216-37 L62 229-97 L63 372.90 L64 906-62 L65 100.00 L66 100.00 L67 129.40 L68 200.00 L69 123-31 L70 129.71 L71 790.52 L72 503.60 L731 128AA CURVE TABLE CURVE LENGTH RADIUS - C1 265.70 430.01_1 C2 1 254.971 473.73_1 SCALE: 1" -300, 300' 0 300 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. NLQTE TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN PURPOSE ONLY. NOT FOR RECORDATION, co O V_ rn CL o W 0) z 0 co 4(.D* co 0 z 0 0 V� 0- 0 W 0 0 Lu Q� (J LLJ CL c LLJ LddU A<c ci Z Ld Z: kN4 SHEET NO. C. 3. 1 L6 44, :52 0 0� ze cl: a (n z 4 PHASE 3 CURVE TABLE CURVE LENGTH RADIUS C1 285- 36 280.55 C2 129.28 674.84 C 3 316.44 201.15 C4 322.85 135.01 C5 194.39 223, 87 C6 449.57 587.86 C7 56.35 319.14 C8 23.57 102.80 C9 31.68 121.12 C10 90.38 200.98 C11 309.61 541.15 C12 220.96 231.77 C13 69.37 238.17 C14 199.44 255,56 C15 7.89 50.00 C16 212.68 200.00 C17 85.32 55.00 C18 178.83 428.20 LINE TABLE LINE LENGTH L1 205,95 L2 351.88 L3 49.61 L4 51.66 L5 35.61 L6 71.12 L71 272, 44 SCALE: 1" =100' , 100 0 100 SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. C404 135 { 132 i <r ,,,•< r t 128 w _ 130 .f r r, LOTS WITH FOOTPRINT' RESTRICTIONS (TYP.)� C �� t i } ` S PROPOSED R/V PARKING } ! t3 t� Y STORMWATER BASIN {TYP.} Z' ! PROPOSED RAISED j� f i ,� TIMBER BRIDGE =� • is :t 1f .,f<�. • iQ , °b »• ,� {BY OTHERS} 117 1a. sq t. 9.812 S .ft. 1 .� 0. 4 ac " w f 124 0122� 10, low- 85? S '98 �� .� cn •_. ".'-•- .--- �, ;��, � ate•'"' 1,,w``,., ,,.: t 12,719 a t. r .,� 1 651 sq.ft, ,,� ,�,4 $ 4• `� 10.01+ .24 as P r "''Y~ 0.29 ac. p r 8,419 sq.ft ; 0.29-ac,. ..? cc. ~ t e g`fr 87 r 0.19 cc. 8.418 sq.ft. . g4 1 � $ 0.19 cc. <� 'r'F``� �94, ,389 .ft. 6. 1 428 sq,lt. .w $,845 aq :fi.26 10 19.499 N.0 w7 3 s f O.+Srn 0.• 11,Si,^� s .ft. 18 cc. r 12.281 sq t, `. ..,,'"'• ,�` �' it ,., t 4,012 sq.ft. 13,459 sq.ft. 0.28 cc 12,�'.6 0.32 0 0.3i ac. 0.29 y. _. ,. • f _ 538, ;iq.ft. r 1 ! -0,20 ac. `0.28 cc V 0/ 14. 7 s4JL 102 N ,`� 10,839 aq.ft 13,140 sq.ft. _.- 34 ac, { ' 12,254 sq.ft Y 0.30 cc. f .. 78 S (, `� ! _ $i} y 0.28 11,592 %� 0.27 cc. 9.3 �y 27' ASPHALT ROAD (TYP.) ` � ' �.. -� 1 .08d aq.f ` S` e 116 h � CC. ,``. ' f PROPOSED 10' f ,,DRAINAGE EASEMENT s •' "� -- '°"�. `'a 7 (TYP i �1 22' ASPHALT ROAD TYP.) _w SEE DETAIL 8 h 0.20 i N t 107 675 sq.ft. ' 3 9.03 sq.ft. y I 1 t 0 1 ac .� 1fl8 6 4 109 l :✓ � � f '�L '` SEE DETAIL �..-r' �I _ _.�.- .; L .r' � 0.23 oc . / $42 sq.ft. i a 9,375 soft. 0.22 ad, t _ r` 11.402 sq.ft. 5' SIDEWALK TYP. t7) f ---''<�• f' _ 11 S68 Eq. t, f ; � � '� SEE DETAIL "`•y` + `,� . 28 n C.7.11 ` ' Ej ,,.f' _ r t 4 14 12, sq•ltn ' _4.30-�0..� r ¢ , ..� gym..., n� 5 •! � ..,u %t t 1 ` , 4 } SANITARY SEWER y , ' o VALLEY CURB ` t . - :.. r PUMP STATION •r •� (TYP.)-30 oc. ,`` � a 4 s ♦'� j'-,,. EXISTING POND ' C `"� � € ; . .<_.,.,?fJ .:.< -•"'' , �...r• /' / f �'" Y hy` , ' r �}. ` "' ,...•?7 ^ ' `' •-. . 1�,6 ~sQ.ft. r i7 .�, ;-r. tea: / �% ,,.,--•.-s-��,;,. r GENERAL NOTES 1 TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND C } {13) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS CONSTRUCTION ASSOCIATES, P.L.S.# L--2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEWER PIPE. OTHERWISE NOTED ON PLANS OR SPECIFICATIONS. (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER (1) PERFORM CONSTRUCTION STAKE OUT. 2 i) PURPOSE ONLY. NOT FOR RECORDATION. ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED Y (14) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT LEAST TEN (10) FEET LATERALLY FROM EXISTING OR THAN 2:1. SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2:1. (2) INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. CORPS OF ENGINEERS ON NOVEMBER 23, 2005 {FINAL APPROVAL PENDING). THE ARMY C PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS (3) CLEAR SITE, BUT DO NOT GRUB. 3 { } CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING TEN (10) FOOT LATERAL SEPARATION ---- IN WHICH CASE: INDICATIVE OF COMPACTED PAD GRADE TO WHICH 2"--4" OF TOP SOIL (4) INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES. CONSTRUCTION. (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE WILL BE ADDED. SEE DETAIL 5 f C,7,11. (5) GRUB SITE. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED ELEVATION ON THE BOTTOM OF THE WATER MAIN AT LEAST (6) CONSTRUCT SEDIMENT BASINS. THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN, EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR (7) COMMENCE ROUGH GRADING OF THE SITE. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH (8) INSTALL STORMWATER MANAGEMENT DEVICES. SITE, THE. WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF (9) CONSTRUCT SEWER COLLECTION SYSTEM. (6)' CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF (10) CONSTRUCT WATER SYSTEM. SEDIMENT FENCING. THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP (11) ROUGH GRADE THE SITE. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 OF SEWER. (12) SHAPE SHOULDERS AND CUT AND FILL SLOPES. CALENDAR DAYS OF GRADING ACTIVITIES.. (15) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A (13) SCARIFY, SEED, FERTILIZE, AND MULCH ALL DISTURBED AREAS. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID {14) INSTALL DRY UTILITIES {ELECTRICAL, FIBER-OPTIC, CABLE, PHONE, ETC}, TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET G.7.10, C.7.1, AND C.7.6, AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT {15 RE -SCARIFY, RE SEED, RE FERTILIZE, AND MULCH ALL DISTURBED {9) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, OR LEAST EIGHTEEN {18} INCHES ABOVE THE TOP OF THE SEWER, UNLESS AREA. TO YARD INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN (18) INCH (16) CONSTRUCT ROADBED BASE COURSE AND INTERMEDIATE ASPHALT DISCHARGE TO INFILTRATION BASIN. SEPARATION -- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER COURSE, (10) FOR MAXIMUM ALLOWABLE BUILT-UP AREA PER LOT FOR PHASE 3 SEE TABLE 5.6 ON SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT (17) APPLY FINAL. ASPHALT COURSE. C.5.6. ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF TEN (18) AFTER DISTURBED AREAS -ARE STABILIZED WITH VEGETATION, THE (11) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH (10) FEET ON EACH SIDE OF THE CROSSING. CONTRACTOR SHALL RETURN TO THE SITE AND REMOVE ALL CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN (16) CROSSING A WATER FAIN UNDER A SEWER. WHENEVER IT IS NECESSARY TEMPORARY EROSION CONTROL MEASURES. APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF, CROSSING. A (12) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF _ CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL PLAN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONI ENT AND NATURAL (17) CROSSING. SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION RESOURCES. FROM BOTTOM OF STORMWATER PIPE AND TOP OF SEINER PIPE. BEFORE YOU DIG ! CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW ! 0 CD tzt N Co VI CL w N (D .� �f 0 i% N U cis C C3 0 >�... 2 a z � 0 o ,- a. t4 V 1 .O �a v 41 Q) -_j 'cl" ��-- `- J Ld {t) (J' ( ) _.j Ld - -_j Q LLJ Ci A cc SHEET No. C.3.7 0 w• � cc ,,t�>>�itttltfttttt�'f ('~^`.ti 0 asy r ¢- 'Or • a`rIf*4*1f,ttittf tillst ���� `'\ -►. 404 WETLANDS, ' N mJ wEnnNoi DRAINAGE AREA C 79' r 80 '+ "I FtE fFE sm 32JD 33 9D f DRAINAGE AREA A SCALE: 1" =100' 100' 0 100 = mimmmi SCALE OF MAP MAY VARY � DUE TO METHODS OF REPRODUCTION. q 0 r« i f ��tlt .t•• ♦♦. 0, pa MR A4 +` \ r ' irk• � \ � � • 1 r NJ `� orb.' f' 3 � ,,�• � i. � .'%} � r/�.. i..`?� ,..if sr:tar�aifi�,i%.!*'.',..R1:•fi%'f i: • -. w�.' 1 hzaxr.�vazv.ra�ri's ♦ •�• s� \ � � � �+. :vT''• ��� •eft • 1{j 411 �uCt 1vY �� i. l f� `"•` ` it / • .. - � � ... j I/ �,�"� NEW Wow- lo, LLLLL _CELLLl _LLLLL LLLLL LLLLL LLLL LLLLL LLLLL.LL LLLLLL LLLLLLLL LLLLLL'I I I I I'LLLLLL DRAINAGEL LLLLLL LLLLLLLL LLLLLL AREA 3C .L LLLLLL LLLLLLLLL L - LLLLL LLLLLLLLL---LLLLLL L - _ - - - LLL ------------------- ____====-DRAIFJAGE_= -_�_ ___ -"-- �=AREA------------------- ------------------ PHASE 3 SPECIFICATIONS JUNCTION BOXES 12 YARD INLETS (YI) 4 CURB INLETS (CI) 24 2 BYPASS BOXES 3 INFILTRATION BASINS 3 RIP RAP APRONS 6 LEVEL SPREADERS 6 12" HDPE 129 L.F. 15" HDPE 1,171 L. F. 18" HDPE 816 L. F. 24" HDPE 309 L.F. 30" HDPE 11640 L.F. REVISION 2. SHEET C.5 6. A. REMOVED BASINS 3D-1, 3D--2, AND 3D-3 FROM PLANS. B. REVISED STORMWATER COLLECTION SYSTEM DRAINAGE AREAS & PIPE LENGTHS. C. ADDED CONNECTION TO ATWOOD LOOP AND REGRADED. GENERAL NOTES (13) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND OF STORMWATER PIPE AND TOP OF SEWER PIPE. CONSTRUCTION ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN (14) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT SEQUENC E PURPOSE ONLY. NOT FOR RECORDATION. LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL CASE: 1. PERFORM CONSTRUCTION STAKE OUT. PENDING). (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, NTH THE ELEVATION ON THE BOTTOM 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR ENTRANCE. CONSTRUCTION. (8) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN 3. CLEAR SITE, BUT DO I40T GRUB. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION 4. INSTALL ALL EROSION AND SEDIMENT THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. OF THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP CONTROL MEASURES. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION OF SEWER. 5. fi. GRUB SITE. CONSTRUCT SEDIMENT BASINS AND TRAPS. SITE. (15 ) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN 7. COMMENCE ROUGH GRADING OF THE SITE. (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION 8. INSTALL STORMWATER MANAGEMENT DEVICES. SEDIMENT FENCING. THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE 9. REMOVE TEMPORARY SEDIMENT TRAPS. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN 10. CONSTRUCT SEWER COLLECTION SYSTEM. CALENDAR DAYS OF GRADING ACTIVITIES. (18) INCH SEPARATION -- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL 11. CONSTRUCT WATER SYSTEM. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO 12. ROUGH GRADE THE SITE. TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET C.7.1, C.7.6, AND C.7.10 WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE 13. SHAPE SHOULDERS AND CUT -AND -FILL (9) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, CROSSING. SLOPES. OR TO YARD INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL (16) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER 14. SCARIFY, SEED, FERTILIZE, AND MULCH ALL DISCHARGE TO INFILTRATION BASIN. MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE DISTURBED AREAS. (1 0) FOR MAXIMUM ALLOWABLE BUILT-UP AREA PER LOT FOR PHASE 3 SEE TABLE 5.6 CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN 15. INSTALL DRY UTILITIES (ELECTRICAL, ON C.5.6. STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF FIBER-OPTIC, CABLE, PHONE, ETC). (11) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CROSSING, A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF 16. RE -SCARIFY, RE -SEED, RE -FERTILIZE, AND CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN CROSSING. MULCH ALL DISTURBED AREA. APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL (17) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM 17. CONSTRUCT ROADBED BASE COURSE AND ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS OF STORMWATER PIPE AND TOP OF SEWER PIPE. INTERMEDIATE ASPHALT COURSE. PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION (18) ALL FITTINGS TO BE MJ DIP NTH THRUST BLOCKING UNLESS OTHERWISE NOTED ON 18. APPLY FINAL ASPHALT" COURSE. CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. PLANS OR SPECIFICATIONS. 19• AFTER DISTURBED AREAS ARE STABILIZED (12) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SEEDING WITH VEGETATION, THE; CONTRACTOR SHALL CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL PLAN OR SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2: 1. RETURN TO THE SITE AND REMOVE ALL APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED TEMPORARY EROSION CONTROL MEASURES. RESOURCES. PAD GRADE TO WHICH 2"-4" OF TOP SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. L\L LL DRAINAGE AREA 3C DRAINAGE AREA 313 DRAINAGE AREA AREA (ACRES) AREA 3A 7.17 AREA 313 4.24 AREA 3C 5.81 TOTAL PHASE 3 17.22 DRAINAGE AREA PERCENT W 48.3% IMPERVIOUS AREA 2 co TABLE5.6 MAXIMUM IMPERVIOUS SURFACE AREAS FOR RESIDENTIAL LOTS (SF) LOT # MAX• IMPERVIOUS LOT # MAX. IMPERVIOUS SURFACE (SF) SURFACE (SF} 74 3,762 1 C} 1 3)657 75 37739 102 3,476 76 3,817 103 31 *977 31873 104 3,649 78 3,736 105 3,657 79 3,834 106 3,520 80 37785 107 3,634 81 3,780 108 3,656 82 3,795 109 2,960 83 3,766 110 3,654 84 3,793 111 3,640 85 31785 112 3,657 $6 31777 113 37667 87 3,655 114 3,742 $8 3,655 115 3,743 89 37655 116 31778 90 3,655 117 31180 9�i 3,772 118 31615 92 3, 761 119 3,633 93 3,769 120 3,662 94 3,690 121 3,315 95 3,744 122 3,541 96 3,646 123 3,774 97 31667 124 3,761 98 3,615 125 3,766 99 3,714 126 31757 100 3,653 NOTE 1: AVG. SF PER LOT IS 3,668 SF {194,426 SF TOTAL / 53 LOTS =3,668 SF} NOTE 2: TOTAL BUA FOR EACH LOT INCLUDES 56' L X 55' W BUILDING ENVELOPE, PLUS 25' L X 18' W DRIVEWAY, PLUS SECTION OF DRIVEWAY WITHIN ROW {324 OR 216 SF, DEPENDING ON LOCATION IN PHASE 3) UNLESS OTHERWISE NOTED BELOW. SIDEWALKS AND CURB ARE NOT INCLUDED BEFORE YOU DIG ! CALL 1-800-632-4949 N.C. ONE --CALL CENTER IT'S THE LAW ! OC v w � ��_j/ O I�) � oU w-- J w J � � Q 4 � o o w o � 4 i� 4 V � W w U w 4 SHEET Na. C.S. 6RECEIVED z .0-101 Lri w w W J-) ,r.• o 4 � V � � W t1 t1 O Cry to cn p BEFORE YOU DIG ! CALL 1-800-632-4949 N.C. ONE --CALL CENTER IT'S THE LAW ! OC v w � ��_j/ O I�) � oU w-- J w J � � Q 4 � o o w o � 4 i� 4 V � W w U w 4 SHEET Na. C.S. 6RECEIVED z .0-101 Lri w w W J-) ,r.• o 4 � V � � W t1 t1 O Cry to cn p C.S. 6RECEIVED z .0-101 Lri w w W J-) ,r.• o 4 � V � � W t1 t1 O Cry to cn p a 33.30 FFE om 2" 32.80 0 33.80 0 e� _3 FIFE ii fl ,/-INSTALL APPROX. 24 j 32.80 GR TE: 26.26' 15" HDPE ®o FFE OUT. 23.57' -2.30 ca 411 11 y FFE 2ro 86 32.80 JB #18 84 J 32.00 k9 9 cl ""94 RIM: 25.51' DRAINAGE AREA v 3B BOUNDARY INV OUT: 22.50 FFE FFE INV IN:Z.5.01 INV IN: 22.50 FFE INV OUT: 23.51' a (TYP-) cli #5 33.80 32.80 32.80 ISO 2 Y 3 SEE DETAIL INSTALL APPROX. 171 LF OF GRATE: 29.25" -3 - i-11" ........ ......... .. ..... . .. r INSTALL APPROX. 92 LF UR INV OUT: 26.00 OF C.7A 15" HDPE 0 0.88% 32 (TYP) 15* HDPE 0 1.102. --,SEE DETAIL .100 co To- 0 BERM 0 EL. 23.75' ---INSTALL APPROX. 193 LF OF FFE c� 18" HDPE 0 0.41% 27.30 cl) 0) Qrl - 41 L_ FFE OF FIFE INSTALL APPROX. 201 f (D 32.30 31.30 2' VALLEY CURB {TYP) 15" HDPE 0 1.01% (b 91 FFE 93 1 ____l - t�� �, � INSTALL APPROX. 31 LF OF c FFE ul 7;�< SEE DETAIL ,' �j 1� T_ FFE 32.80 Cl #56 30" HDPE 0 0.19% z INV OUT: 19.80 cz 33.30 32.80 T.7.9 10 F) GRATE: 23.53' Cl #43 FFE JB #9 FFE "' 11--\ INV OUT: 20.53 32.80 RIM: 30.10' t , z 27.30 X. GRATE: 28.31' INV IN: 24.50' (A & B) INSTALL 15' SPILLWAY 0 22.75' INSTALL APPRO NV IN: 25.30' l< 0 l0k c: INV OUT: 24.50' 29 LF OF 15* HDPE 0 N INFILTRATION NV OUT: 25.3C' INSTALL APPROX. 24 LF OF JB #17 01.12% 0 (TYP) V 3 96 BASIN 3B RIM: 23.25" E 11% SEE DETAIL 15" HDPE 0 0.29% R SEE DETAIL INV IN: 17.75' JB #10 FFE Cl #55 26.30 INV OUT: 17.35' 0) RIM: 29.05' FIFE I a) c*j INV IN: 23.85' 31.30 GRATE: 23.53• 107 INSTALL APPROX. 34 LF OF +-a .2 INV OUT-.23.85' INV IN: 20.46 (A & ts) co FFE 30* HDPE 0 0.53% OA% 5- •0 -9 GGo INV OUT. 20.46' 33.10 mv_� ND Cl #47 404 INSTALL APPROX. 103 LF OF INV OUT. 17.17 WETLANDS 24" HDPE 0 0.25% 2 GRATE: 27.80" 0) _--r FIFE le INV IN: 23. 1 Ll 7 29' (A, B, & C) 26.30 RIP RAP APRON (TYP) 0 SEE DETAIL INV OUT. 23.29' 5 ux. 34 LF OF r - _c u. 12" HDPE V.7.197 4-0 v Cl #42 81 INSTALL APPROX. 109 LF OF, INSTALL APPROX. 32 LF OF 101� 0 FIFE cl) z GRATE: 28.31' 26.30 INV OUT: 25.62 18" HDPE 00.60%•sI 30" HDPE 0 0.25. t , VEGETATED FILTER (TYP) c co FFE FFE 10 0 (Typ. SEE DETAIL 2 1 2 30.30 t1w 26.30 4­1 79 SEE DETAILS 1 a: FFE '1 04 BYPASS 3B :3 .7.1 3280 8 0 78 JB RIM: 23.75' 0 GRATE: RIM: 24.56 NA INV IN: 19.86' era Q� 0 ----.'5' SIDEWALK C FFE FFE FFE JNV IN: 23.62" (A & B INV IN (A):20.17 RIM: 24.61' INV OUT: 19.86' 4 0 4 to SEE DETAIL INV OUT: INV IN (B): 20.20' 0 32.60 32.30 32.30 54! BYPASS OUT: 18.20' INV OUT: 20 28 INV IN: 20.12' < 3.80 WEIR EL: 22.2" NV OUT. 2012' SEE DETAIL - 3 C.7A INSTALL APPROX. 122 LF OF A\ (TYP.) INSTALL APPROX. 101 LF OF 18" HDPE 0 0."% 3' X INSTALL APPROX. 128 LF OF 3 .7. SEE DETAI 30" HDPE 0 0.45% 18* HDPE 0 0.26% _FE 27,30 INSTALL APPROX. I J.3 LF OF Cl #44 INSTALL APPROX. 48 LF OF rrr Cl #48 f. 26' ASPHALT ROAD'- ps GRATE: 27.80' 26. V GRA Ml: 26.12" 18" HDPE 0 0.25% 30" HDPE 0 0.20% INV OUT: 23.38' FFE .:< i j. (TYP) r3 77 V OUT: 23. 74 APPROX. 134 LF OF 26.80 SEE DETAIL INSTALL DRAINAGE AREA FFE 00.25% C.7.9 32.00 Cl #52 3A BOUNDARY INSTALL APPROX. 84 LF OF GRATE: 24.03' INSTALL APPROX. 36 LF 0 INV IN: 21.34! 15" HDPE 0 0.26% INSTALL APPROX. 15* HDPE 00.25% 133 LF OF 30" HDPE INV OUT: 21.34' JB #14 76, RIM: 24.29' tx 0, Ps 00.25% 11 \a . ,'". ' e�; `� C*N F V IN: 20.50 N ON! t INSTALL APPROX. 29 LF OF INSTALL APPROX. 46 LF OF 26.80 1 a_� t 15" HDPE 0 0.70% INSTALL APPROX. 198 13 OF• V INV OUT: 2 50'�--�� '12" HDPE 0 0.26% 7 23 15" HDPE 0 0.25% 1 _j Cl #54 GRATE: 23.79' CN I___ \JB #13 404 INV IN: 20.62' (A & B 15� cl 03 u RIM: 24.90- INV OUT: 20.62 n-- NN WETLANDS I 'INV IN: 2 GRATE; 23.79' 0 INSTALL APPROX. INV OUT. -20.81 A INV OUT 2i.12' 0 25 LF OF 1 Hurt FFE f� I--, L.L. cr k�� (TYP.) a ter. 31.30 Cl #49 0 1.00% SEE DETAILS �tt .7.1 .7.1 .7.1 cf) GRATE: 26.35 • 161 0 INSTALL APPROX. 102 LF OF INV OUT: 23.16 30" HDPE 0 0.25% LL_ 51, Q:� Z cl GRATE: 2&359 GRATE: 24.03" (J� -INV IN: 22.96- (A & B) INV OUT: 21.59 C84 INV OUT: 22.96 BP 3A (TYP) SEE DETAIL 2 .. ...... ... RIM: 26.75' Q� Lu FFE C.7.1 INV IN: 22.57' INSTALL APPROX. 25 LF 0 31.30 22.54! INV OUT.-12" HDPE 00.78% BYPASS OUT: 23.35 __j CL JB #11 SCALE: 1 501 0 50' SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. co DRAINAGE AREA 3A PROPOSED IMPERVIOUS AREA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - DRAINAGE AREA 3A IMPERVIOUS ARI INFILTRATION BASIN 3A .DRAINAGE AREA 3A DATA TOTAL AREA 7.17 ACRES IMPERVIOUS AREA 2.91 ACRES PERCENT IMPERVIOUS 40.6% VOLUME 1.5" RAINFALL 16,221 CU. FT. VOLUME INFILTRATION BASIN 3A 17,611 CU. FT. "r-lfx C" 40.44 RIM: 28.00 41. 3EE DETAIL I INV IN:22.70- �Q.7.191 APPROX. 50 OUT.'22.70' BEFORE YOU DIG _T JB #12 11 -SANITARY SEWER INSTALL APPROX. 51 LF OF U-4 IM: 26.75' PUMP STATION CALL 1-800-632-4949 '0� 30" HDPE 00.26% INV IN: 23.19 N.C. ONE -CALL CENTER INV OUT: 23.19 J INSTALL ArrK A. 10 LF OF IT2S THE LAW N 30" HDPE 0 0.27% INFILTRATION ° �,i BASIN 3A 1A z SEE DETAIL WEETLAND CROSSING TO U11LIZ BERM 0 EL. 26.75' A 35' BOTTOMLESS CULVERT WITH RETAINING WALL _A ar-r- DETAIL AIL r 2 C.7.9 -INSTALL APPROX. 62 LF OFf INSTALL APPROX. 15 LF F 30* HDPE 0 0.26% • RIP RAP APRON REQUIREMIE 'THICKNESS G-nvri�_ INV. OUT: 2�.Zm 2.50" " INSTALL 15" SPILLWAY 0 25._75--j, (13) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND OF STORMWATER PIPE AND TOP OF SEWER PIPE. CO NS TRUC TIO N- ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN (14) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT SEQUENCE- PURPOSE ONLY. NOT FOR RECORDATION. LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL (2) ALL WETLAND BUFFER INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL CASE' 1. PERFORM CONSTRUCTION STAKE OUT. PENDING). (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR 3. ENTRANCE. CLEAR SITE, BUT DO NOT GRUB. (4) CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED (B) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN 4. INSTALL ALL EROSION AND SEDIMENT LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION CONTROL MEASURES. (5) THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION OF THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP 5. GRUB SITE. OF SEWER. RECEIVED 6. CONSTRUCT SEDIMENT BASINS AND TRAPS. SITE. (15) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN 7. COMMENCE ROUGH GRADING OF THE SITE. (6) CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED AT 200 L.F. INTERVALS ALONG TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION 8. INSTALL STORMWATER MANAGEMENT DEVICES. ENT FENCING. SEDIMENT THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE OCT 1 2007 9. REMOVE TEMPORARY SEDIMENT TRAPS. (7) ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN 10. CONSTRUCT SEWER COLLECTION SYSTEM. CALENDAR DAYS OF GRADING ACTIVITIES. DWQ (18) INCH SEPARATION -- IN WHICH CASE, BOTH THE WATER MAIN AND SEWER SHALL 11. CONSTRUCT WATER SYSTEM. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO # 12. ROUGH GRADE THE SITE. TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET C.7.1, C.7.6, AND C.7.10 WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE 13. SHAPE SHOULDERS AND CUT -AND -FILL (9) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, CROSSING. SLOPES. OR TO YARD INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL (16) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER 14. SCARIFY, SEED, FERTILIZE, AND MULCH ALL DISCHARGE TO INFILTRATION BASIN. MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE DISTURBED AREAS. (10) FOR MAXIMUM ALLOWABLE BUILT-UP AREA PER LOT FOR PHASE 3 SEE TABLE 5.6 CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN 15. INSTALL DRY UTILITIES (ELECTRICAL, ON C. 5.6. STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF FIBER-OPTIC, CABLE, PHONE, ETC). (11) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF 16. RE -SCARIFY, RE -SEED, RE-FERIlLIZE, AND CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN CROSSING. MULCH ALL DISTURBED AREA. APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL (17) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM 17. CONSTRUCT ROADBED BASE COURSE AND ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS OF STORMWATER PIPE AND TOP OF SEWER PIPE. INTERMEDIATE ASPHALT COURSE. PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON 18. APPLY FINAL ASPHALT COURSE. CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. PLANS OR SPECIFICATIONS. 19. AFTER DISTURBED AREAS ARE STABILIZED (12) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SEEDING WITH VEGETATION, THE CONTRACTOR SHALL CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL PLAN OR SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2: 1. RETURN TO THE SITE AND REMOVE ALL TEMPORARY EROSION CONTROL MEASURES. APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED i RESOURCES. PAD GRADE TO WHICH 2"' 4" OF TOP SOIL WILL BE ADDED. SEE DETAIL 5/C.7.11. o SHEET NO. C.5.7 N Q) C) n Z W W � V) V) Q � p w � cc 0 Qw p vVj z 0 0 p z C) -p w 0 s % V)• oz < W Z_ .p - V) 010 w s < z 0 see* LL. F REVISION 2. SHEET C.5.8 A. REMOVED BASINS 3D-1, 3D-2, AND 3D-3 FROM PLANS. , B. REVISED STORMWATER COLLECTION SYSTEM INVERTS, PIPE LENGTHS, INLET NUMBERS AND DRAINAGE AREAS. C. ADDED CONNECTION TO ATWOOD LOOP. z F t af° INSTALL APPROX. 228 LF OF--, 3 .Iq_30 HDPE 0 0.25% . Y . , F _QI € <'O', :s 36.80� 4 Gi ` FFE \ \ 37.30 } �p • 26' ASPHALT ROAD 2' VALLEY CURB TYP �p (TYP) 3 ( ) h, SEE DETAIL SEE DETAIL i zC.7.9 ."f a C.7.9 -- --� #'x \'ti INSTALL APPROX. 242 LF OF 4t a k s r x 30" HDPE 0 0.25% FFE , \ CI #61\ ,% 36.30 GRATE: 29.36a�r a t �' • i INV IN, 24.66 �-- 5' SIDEWALK (TYP) d INV OUT:24.66 FFE r a SEE DETAIL ` ,12 32.80 Q' CI #At 63 FFE DRAINAGE AREA 3C BOUNDARY BEFORE YOU DIG ! CALL 1--800-6322-4949 N.C. ONE --CALL CENTER IT'S THE LAW ! INSTALL APPROX. 48 LF OF 18" HDPE 0 0.25% p 85 CI #59 ¢ GRATE: 29.36' INV OUT:24.97' Y 4 � FFE 33.80. 7 � i INSTALL APPROX. 34 LF OF l 18" HDPE 0 0.26% y 84 f. Y FFE 33.80 32 } 7 4! .x , T •y 83 ,. FFE 33.30 ' O 4 \ '! GRATE: 28.25- Y! #7 GRATE: 28.25' INV IN:23.07' INV OSUT:23.07' 4 INSTALL APPROX. 109 LF OF 30" HDPE 0 0.26% y 11 ,a '•w...._ rvrw+� t -. FFE r FFE 34.80 33.80 b 33 GRATE: 26.79INSTALL APPROX. 138 LF OF " INV IN:22.50} INV OUT:22.50' 30" HDPE 0 0.25% dl� mo" 10 X 26.50° 'Ak QQ BP 3C RIM: 28.25' { e +'; = ` INV IN: 22.15' f� N PROPOSED INV OUT: 22.15' RSV PARKING - X BYPASS OUT:24.88' 4 f �,,+27.50 WEIR EL:25.25' 6 SEE DETAIL ; L 3�.. .7.1 28.50 INSTALL APPROX. 24 LF OF X , -�°" 30" HDPE 0 0.38% r` f / INV OUT:24.79' 28.90 VEGETATED FILTER " (TYP) ` X /,4`� SEE DETAIL 1 YI #fi � # .7.1 ` t j GRATE: 29.75' cv INV IN:23.25' ` s INV OUT:23.25' F' r JB #20 / GRATE:31.75' f INV IN:23.53' (A & B) FFE Yx 33.80 .' llwll� WM mp-0 AL i . •INV ,#st a� r Z,000� "404. tS A 1•'Ink GRATE: 30.35' t• 57`, INSTALL APPROX. 135 LF OF INV IN:23.87 15" HDPE ® 0.25% INV OUT:23.87 - 90 3 u FFE Y. � 33.30 .� 9.9 32.80 3CI #6 :< FFE STALL APPROX 10o LF of . IN . ,FFE 88 -; k ..:..;:..<-.:.. GRATE: 29.36 32.80 • 15 HDPE 0 0.25% 30.30 :.INV IN: 24.88 � Z.. FFE t. >.4 31,2 5 , V OUT: 2. 78 32.30 8 7 �:. ci 2 TYP i {/ d 1 ) i 2 06 ATE, 28.25 f• S RATE: - t A!L - ED ET SE •7.1 .7.i FFE :INSTALL APPROX. 206 LF OF INV OUT:24.57 INSTALL APPROX. 25 LF OF'� FFE %�� (86 32.80 „ i 5" HDPE 0.29% -� '; 32.00 9 t Ci #65 FFE 24 HDPE 0 0.25% '" h.: -....rt•,. ,...,,- - � <,,• .,4 .;. 11-0 . • �' `GRATE: 29.18� 29,30 f f INV IN: 24.12 L----! i p �F r .7.1 7 , FFE j �: '� INV OUT: 24.12 Y � fj b FFE x. +� 2.80 O r e 8 , 32. 0 3 -f sr f � t CI 4 cc` '7 30 .2 ,t; GRATE: 29.18 -.. ' INV OUT:24.19' T, ,{VA 10 i$ 92 FFE 1 _ _ f ;fi f t 1 FFE f 32.30 ;z �y� 31.30 1 FFE FFE 32.80 32.809 FFE 32.80 v Kt ..f DRAINAGE AREA 3C PROPOSED IMPERVIOUS AREA L- L. L- _ L L DRAINAGE I I I I I I I / AREA 3C DRAINAGE AREA 3C DATA TOTAL AREA 5.81 ACRES IMPERVIOUS AREA 3.02 ACRES PERCENT IMPERVIOUS 52.0% VOLUME 1.15" RAINFALL 16,373 CU. FT. VOLUME INFILTRATION BASIN 3C 19,042 CU. FT. INSTALL APPROX. 58 LF OF 30" HDPE 0 0.26% INV OUT:22.00' BERM 0 EL. 26.75 15" SPILLWAY 0 25.75' 4., RIP RAP APRON (TYP) SEE DETAIL 5 INFILTRATION BASIN, 3C SEE DETAIL 3 a � 4 ♦7.1 z � r 5 t co 4 c SCALE: 1 = 50 e 50' 0 50' q � � V E SCALE OF MAP MAY VARY DUE TO METHODS OF REPRODUCTION. L9T `o rn N co co w c 0 0- -az o C13 S N can RIP RAP APRON REQUIREMENTS CUTLET CLASS L w THICKNESS D50 3C BASIN B 15' 8.5' 18" 5-15" 3C BYPASS B 15' 8.5' 18" 5-1 a" \ N (A 1 / R t \ ` FFE f 29.30 2 c 7 'x 4 x L i b O N� N, (jjt `r• � si t t f •',.! \ FFE � � •'a --,,, •"°, � 27.30 1a 1 FFE �.�► 27.30 GENERAL NOTES (13) SEWER AND STORMWATER PIPES TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM (1) TOPOGRAPHICAL SURVEY INFORMATION PROVIDED BY CHARLES F. RIGGS AND OF STORMWATER PIPE AND TOP OF SEWER PIPE. CONSTRUCTION- ASSOCIATES, P.L.S.# L-2981. INFORMATION PROVIDED FOR ENGINEERING DESIGN (14) LATERAL SEPARATION OF SEWERS OR WATER MAINS. WATER MAINS SHALL BE LAID AT S-EQU EN CE PURPOSE ONLY. NOT FOR RECORDATION. INFORMATION AND SETBACKS HAVE BEEN FIELD APPROVED BY LEAST TEN (10) FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL (2) ALL WETLAND BUFFER CONDITIONS OR BARRIERS PREVENT A TEN (10) FOOT LATERAL SEPARATION -- IN WHICH THE ARMY CORPS OF ENGINEERS ON NOVEMBER 23, 2005 (FINAL APPROVAL CASE: , 1. PERFORM CONSTRUCTION STAKE OUT. PENDING). (A) THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION ON THE BOTTOM 2. INSTALL TEMPORARY GRAVEL CONSTRUCTION (3) CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES BEFORE COMMENCING OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF SEWER; OR ENTRANCE. CONSTRUCTION. (8) THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN 3. CLEAR SITE, BUT DO NOT GRUB. (4) CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION 4. INSTALL ALL EROSION AND SEDIMENT THROUGH DEMOLITION AND GRUBBING ACTIVITIES SHOWN. OF THE BOTTOM OF THE WATER MAIN AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP CONTROL MEASURES. (5) SEDIMENT FENCING TO BE AT THE LIMIT OF DISTURBANCE FOR THIS CONSTRUCTION OF SEWER. 5. 6. GRUB SITE. CONSTRUCT SEDIMENT BASINS AND TRAPS. SITE. 15 ( ) CROSSING A WATER MAIN OVER A SEWER. WHENEVER NECESSARY FOR A WATER MAIN 7. COMMENCE ROUGH GRADING OF THE SITE. (6) PAC AT 200 L.F.INTERVALS ALONG CONTROLLED SEDIMENTATION OUTLETS TO BE PLACED TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION 8. INSTALL STORMWATER MANAGEMENT DEVICES. SEDIMENT FENCING. THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN 18 INCHES ABOVE THE 9. REMOVE TEMPORARY SEDIMENT TRAPS. 7 () ALL DISTURBED AREAS TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 TOP OF THE SEWER UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN EIGHTEEN 10. CONSTRUCT SEWER COLLECTION SYSTEM. CALENDAR DAYS OF GRADING ACTIVITIES. (18) INCH SEPARATION -- IN WHICH CASE BOTH THE WATER MAIN AND SEWER SHALL 11. CONSTRUCT WATER SYSTEM. (8) WATER, SEWER, AND STORMWATER PIPES TO BE INSTALLED IN TRENCHES ACCORDING BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO 12. ROUGH GRADE THE SITE. TO STANDARD SPECIFICATIONS AND DETAILS ON SHEET C.7.1, C.7.6, AND C.7.10 WATER MAIN STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE 13. SHAPE SHOULDERS AND CUT -AND -FILL (9) ROOFTOP RUNOFF FOR ALL RESIDENTIAL LOTS TO BE DIRECTED TO RIGHT-OF-WAY, CROSSING. SLOPES. OR TO YARD INLET (OR OTHER STORMWATER COLLECTION DEVICES) FOR EVENTUAL (16) CROSSING A WATER MAIN UNDER A SEWER, WHENEVER IT IS NECESSARY FOR A WATER 14. SCARIFY, SEED, FERTILIZE, AND MULCH ALL DISCHARGE TO INFILTRATION BASIN. MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE DISTURBED AREAS. (10) FOR MAXIMUM ALLOWABLE BUILT-UP AREA PER LOT FOR PHASE 3 SEE TABLE 5.6 CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN 15. INSTALL DRY UTILITIES (ELECTRICAL, ON C.5.6. STANDARDS FOR A DISTANCE OF TEN (10) FEET ON EACH SIDE OF THE POINT(S) OF FIBER-OPTIC, CABLE, PHONE, ETC). (11) ACCORDING TO THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973 (NORTH CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF 16. RE -SCARIFY, RE -SEED, RE --FERTILIZE, AND CAROLINA GENERAL STATUTE 113A 51-66) THIS PROJECT IS SUBJECT TO AN CROSSING. MULCH ALL DISTURBED AREA. APPROVED SEDIMENTATION AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL (17) SEWER AND STORMWATER PIPES _TO HAVE A MINIMUM OF 24" SEPARATION FROM BOTTOM 17. CONSTRUCT ROADBED BASE COURSE AND ADHERE TO ALL OF THE CONDITIONS SET FORTH IN THE APPROVED PLAN, AS OF STORMWATER PIPE AND TOP OF SEWER PIPE. INTERMEDIATE ASPHALT COURSE. PRESCRIBED BY NCDENR. A COPY OF THE APPROVED SEDIMENTATION AND EROSION (18) ALL FITTINGS TO BE MJ DIP WITH THRUST BLOCKING UNLESS OTHERWISE NOTED ON 18, APPLY FINAL ASPHALT COURSE. CONTROL PLAN SHALL BE DISPLAYED AT THE JOB SITE AT ALL TIMES. PLANS OR SPECIFICATIONS, 19. AFTER DISTURBED AREAS ARE STABILIZED (12) THE STORMWATER MANAGEMENT PLAN DEPICTED ON THESE SHEETS SHALL BE (19) EXCELSIOR MATTING AND SEEDING TO BE USED ON SLOPES STEEPER THAN 2:1. SEEDING WITH VEGETATION, THE CONTRACTOR SHALL CONSTRUCTED IN ACCORDANCE WITH THE SEDIMENT & EROSION CONTROL PLAN OR SOD SHALL BE USED FOR ALL SLOPES FLATTER THAN 2.1. RETURN TO THE SITE AND REMOVE ALL APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL (20) FINISHED FLOOR ELEVATION (FFE) IDENTIFIED ON THE PLAN IS INDICATIVE OF COMPACTED TEMPORARY EROSION CONTROL MEASURES. RESOURCES. PAD GRADE TO WHICH 2 4 OF TOP SOIL WILL BE ADDED. SE T?MrYVED OCT 19 2007 DWQ 22 rD O 4+ 2 U. O (/) c O z tM '- o a m O 06 rn 03 U LLJ cj:�1 vI Ll _j r.. c _ 1 r� Lt.I cr o c� Lu V) Lv I-- �C w l� 0� C z O Q ` � Q ""d (� \.1LLJ p �Q� C C) LLJ --.� CL O C1 h o O C) 1 Ld W © V C) L_ Li W CL CL 'r~ N SHEET NO. a � � N C7 Lri C7 I-- Q W d) Q w w w •• 4 .�. . ,.......... t=002. 6, �,, So 6_NL1.. L] Li �": - ESN -� `-jes 24" Now- 9" PARKING STRIP (FINISH GRADE) 1" DROP PROPOSED ROAD SURFACE t> � 0 7" 0 / 4" ABC EXISTING SUBGRADE X / GENERAL NOTES: 1.) CONTROL JOINTS SHALL BE PLACED 0 10' INTERVALS UNLESS OTHERWISE SPECIFIED BY ENGINEER, PLANS, OR SPECIFICATIONS. 2.) ALL CONTROL JOINTS 'SHALL BE FILLED WITH JOINT SEALER. 3.) EXPANSION/CONTRACTION JOINTS SHALL BE AT 90 FOOT INTERVALS, AND ADJACENT TO ALL RIGID OBJECTS. 4.) ALL JOINTS SHALL MATCH LOCATIONS WITH JOINT IN ABUTTING SIDEWALK. 5.) CONCRETE SHALL ACHIEVE A MINIMUM 28 DAY YIELD STRENGTH AT 3,500 PSI. VALLEY CURB DETAIL DETAIL n SCALE: NOT TO SCALE C. 7.9 EXISTING SUBGRADE 5'--0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 -1 '. i' !!'.SLOPE - -- -- -!i- - - -- t------ TYPICAL VALLEY CURB SEE DETAIL 1 /C.7.9 5'-0" CONCRETE SIDEWALK AT 2%, SEE DETAIL 4/C.7.11 TYPICAL ROAD SECTION SEE DETAIL 3/C.7.9 NOTES: V (1) EOP = EDGE OF PAVEMENT (2) BOC = BACK OF CURB NOTE: TYPICAL ROADWAY SECTION TO BE APPLIED TO LOGGERHEAD BLVD. (3) EOS =EDGE OF SIDEWALK (4) BOS =BACK OF SIDEWALK (5) ROW =RIGHT OF WAY TYPICAL- ROADWAY SECTION -_ - — PRIMARY SUBDIVISION ROADS/BOULEVARDS DETAIL n SCALE: NOT TO SCALE C.7.9 ALUMINUM BOTTOMLESS CULVERT W/ WING WALL (WING WALL SHALL BE DESIGNED BY AND BARE THE SEAL OF P.E. LICENSED IN NORTH CAROLINA) P"SlQN 1.21 C.7.9 A) ADDED NOTES 70 ROAD SECTION DETAILS INDICATING ROADS WHERE SEC'�ONS ARE APPLICABLE n 1.5' MIN. L_ TOP RADIUS PER MANUFACTURER INNER RADIUS PER MANUFACTURER APPROX. 24' Now I N V 27.00 BOTTOM OF EXIST. STREAM (UNDISTURBED) PER MANUFACTURER ALUMINUM BOTTOMLESS CULVERT DETAIL SCALE: NOT TO SCALE rlkIIt�l Ir-M nD a nr- CONCRETE FOOTING PER MANUFACTURER'S SPECIFICATIONS (MIN. 4,000 PSI CONCRETE) 17.00 FT — EOS GL.VV r I — [7v1.3 17.00 FT — EOS 13.00 FT — BOC 13.00 FT — BOC SLOPE VARIES 11.00 FT — EOP 11.00 FT — EOP SLOPE VARIES 3:1 MAX 3:1 MAX 2.00% SLOPE _ - 2.00% SLOPE EXISTINGi:•,Yid'•�y.v.,,�y�yiy"'..,.�,�Y,�v�.,.- SUBGRADE 5'-0" CONCRETE SIDEWALK 5'-0" CONCRETE SIDEWALK AT 27o, SEE DETAIL 4/C.7.11 AT 27o, SEE DETAIL 4/C.7.11 TYPICAL ROAD SECTION TYPICAL VALLEY CURB SEE DETAIL 1 /C.7.9 SEE DETAIL 3/C.7.9 NOTES: (1) EOP = EDGE OF PAVEMENT NOTE: TYPICAL ROADWAY SECTION TO BE APPLIED TO ATWOOD LOOP AND EASTMOOR DRIVE. TYPICAL ROADWAY SECTION — SECONDARY SUBDIVISION ROADS DETAIL n SCALE: NOT TO SCALE C.7.9 (2) BOC = BACK OF CURB (3) EOS = EDGE OF SIDEWALK (4) BOS = BACK OF SIDEWALK (5) ROW =RIGHT OF WAY Ld w U LJ ._.J o �---- °c Uz LL- �o Q o� (J o Ld o 0 ~� �C Q w CL -t I— 6a SHEET N0. C. 7.9 co o ,d. N p g N � oa Q w � W C3 4 p, 12: 1 SL PE M/N.12.1 N V)f. *A suopf- O. VARIES TO TIE TO VARIES TO TIE TO FINISH GRADE FINISH GRADE NOTE: (1) USE PENSACOLA BERMUDAGRASS AS VEGETATED COVER (2) USE WOVEN PAPER NET AS FILTER LINER RIP RAP W/ RIP RAP W/ LEVEL SPREADER INV. OUT LEVEL SPREADER WEIR: 17.17' INV. OUT 22.98' WEIR: 22.98' SEE 5 DETAIL(p 24.79' SEE DETAI 5 C.7.9 C.7.9 LEVEL SPREADER (TYP) INV. OUT k 17.17' Nil V- 4� k k LEVEL k <_ V, k <_ SPREADER ts k Fk k k (TYP) k k k <_ v, ( X22.86' X_ k 17.05' v, X24.37't- \P k k k k w/ k 14- k 4k- It- r RIP RAP W/ LEVEL SPREADER WEIR: 24.79' SEE DETAI 5 .7.9 74s C LEVEL SPREADER (TYP) V_ vl_ _­ 24.24'­­­_�� 22.73' 9 2_ 2 PLAN VEGETATED - FILTER -A ELAN VEGETATED FILTER B PLAN - VEGETATED FILTER C 2 A VEGETATIVE FILTER DETAIL SCALE: NOT TO SCALE \C. 7.1 g/ L�z NVERT INVERT OUT IN 44 ­4 NOTES: (1) ALL CONCRETE TO BE 3,600 P.S.I. (2) ALL CATCH BASINS MORE THAN 3'-6" IN DEPTH SHALL HAVE STEPS 12" ON CENTERS. (3) ALL PIPE IN STORM DRAIN STRUCTURE SHALL BE STRUCK EVEN WITH THE INSIDE WALL, GROUTED, AND BRUSHED SMOOTH. (4) 4'-0" BOX TO USED FOR STORMWATER PIPES 12"-24" AND 5'-0" BOX TO BE USED FOR STORMWATER PIPES GREATER 24" IN DIAMETER. STANDARD ST DETAIL SCALE: N OT TO SCALE HUB END ON C END SEC SPIGOT E INLET END SE( XL STEEL BA FLARED END SECTION PLAN 3,_ 0" EXIST. GRADE MIN. 6" LAYERS OF HAND PLACED COMPACTED BACKFILL SEE SPECIFICATIONS PROVIDE UNIFORM AND CONTINUOUS SUPPORT OF PIPE BARREL BETWEEN BELL HOLES 3, - 0" MIN. EXIST. GRADE TRENCH WALLS MAY BE SLOPED CONDUCTIVE TRACER TAPE ,#57 WASHED STONE TO 1/6TH DIAMETER OF PIPE O.D. -MINIMUM OF 4" OF NO. 57 WASHED STONE TO BRING TO GRADE NOTES: 1. SOIL FROM TRENCH SHALL BE PLACED TO ENSURE RUNOFF WILL RETURN TO THE TRENCH. 2. GROUND COVER ABOVE TOP OF PROPOSED WATERLINE SHALL BE A MINIMUM OF 3'. BEDDING FOR CLASS "C" PVC PIPE DETAIL r2 SCALE: NOT TO SCALE LEVEL SPREADER W 1 GEO-FABRIC TO BE PLACED ON FILL SLOPE LEVEL SPREADER WEIR L No WEIR r- RIP RAP -P*l 17VATIN 1.0 * SOP" GEO-FABRIC TO BE GEO-FABRIC STAPLED EVERY 51 (TYP) SECTION X-X LEVEL SPREADER 2 LEVEL SPREADER REQUIREMENTS OUTLET # WEIR I w ELEV. 3A BASIN 22.55' 3 8.5' 3A 22.98' 31 8.5' BYPASS 3B BASIN 19.85' S 8.5' 3B BYPASS 17.17' 3' 8.5' 3C BASIN 22.05' 31 8.5' 3c BYPASS 24.79 3' 8.5' NATURAL GRADE VARIES 17� Para t Z 00 W Wtw !1111 Al 7i _00 LAYER OF FILTER FABRIC NOTE: MINIMUM H = 2/3 PIPE SECTION B-B GENERAL NOTES: 1. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 2. SIDEWALLS SHALL EXTEND UP AS SHOWN ON THE PLANS BUT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER. 3. THERE SHALL BE NO OUTFALL FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE' PAVED OR RIP RAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL, THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. 5. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED, IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 6. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. RIP RAP APRON REQUIREMENTS OUTLET # CLASS L W THICKNESS D5o 3A BASIN B 15' 8.5' 18 5"-15ps 3A B 15' 8.5' 18 5')-15$1 -BYPASS 3B BASIN B 15' 8.5' 18 is 5'#-15#* 3B BYPASS B 15' 8.5' 18 to 5"-15" 3C BASIN B 15' 8.5, 18 it 5"--15" 3C -BYPASS B 15' 8.5' 18 5"--15" RIP RAP APRON FOR FLARED END SECTION DETAIL /'�51 SCALE: NOT TO SCALE . 7. 1 Oj INFILTRATION M A C` I k I BY-PASS LINE FROM DRAINAGE AREA BY-PASS LINE NOTES: THICKNESS OF CONCRETE TO BE 6" UNLESS OTHERWISE STATED IKIC%-rA I I -DuLlu .E COVER MARKED SEWER' INSTALL SOLID MANHOLE COVER MARKED 'STORM SEWER' BYPASS WEIR: B INV. OUT: E NFILTRATION BASIN SUMP: F 12" WASHED A.B.C. BOTTOM: G BASIN INVERT ELEVATIONS A B c D E F G 3A 26.75 25.25 22.57 23.35 22.54 21.54 20.04 3B 23.75 22.25 19.86 18.20 19.84 18.86 18.36 3C 28.25 25.25 22.15 24.88 22.15 21.15 20.65 STORMWATER BY-PASS BOX DETAIL SCALE: NOT TO SCALE . 7.1 Qj REVISION 2. SHEET C.7.10 A. REVISED VEGETATED FILTER DETAIL TO MORE ACCURATELY REFLECT DIMENSIONS. ADDED PLAN VIEWS OF VEGETATED FILTER TO SHOW GRADING AND SPOT ELEVATIONS. REVISED SIDE SLOPES ON VEGETATED FILTERS TO REFLECT A MAXIMUM OF 12 FEET HORIZONTAL/1 FOOT VERTICAL. B. REVISED RIP RAP APRON DETAIL TO SHOW LEVEL SPREADER ON THE OUTLET END AS WELL AS MATERIAL. LEVEL SPREADER REQUIREMENTS TABLE ADDED TO REFLECT DIMENSIONS AND ELEVATIONS OF LEVEL SPREADERS. C. REVISED BYPASS BOX ELEVATION TABLE TO MATCH PLANS. 1" SF 9.5A SURFACE COURSE 2 1/2" 1 19.0 B 6" AGGREGATE BASE COURSE (ABC) COMPACTED SUBGRADE UPPER 8- MINIMUM OF 95% STANDARD PROCTOR -I I 1=III=III=I I I=1 I I =III-III-1 \ I=� ( FILL - MAXIMUM 8- LIFTS AS REQUIRED MAXIMUM DRY DENSITY //�\� \/ \� \/ \/ \/ \ THIS SECTION REPRESENTS THE MOST \\\ \\ /\\ \� /\/ RESTRICTIVE PAVEMENT DESIGN \\ SYSTEM. FINAL PAVEMENT DESIGN SYSTEM TO BE DETERMINED IN THE FIELD BASED ON FIELD CONDITIONS. MATERIALS SHALL MEET THE REQUIRED SECTIONS OF THE NCDOT STANDARD SPECIFICATION FOR ROADS AND �UCTURES LIGHT --DUTY ASPHALT PAVEMENT DETAIL RECEIVEL SCALE: NOT TO SCALE 7. 10) OCT 1 195 2007 DWQ _4 e 0!e rn c cq cm cy 0 CL cz cl cli cli D EJ C15 0 L_ U. Jc 4-0 0 cl) z 0 c r) 0 c 4-0 0 0 06 cr_ cj Lid cf) Q) LidO (� j -J LLJ w L.LJ C) Lz, 41 CL o � � o O Q CL U W 0 C) ct L4J CL CL ce SHEET NO. C. 7. 10 L6 V) Do Q cil � 0 V C�1 0 z FF=- Cl* 't Un ED < 53- LLJ z 0 Lij 0 -f- •_ Z ce 0 #4 REBAR 0 4" CONCRETE SIDEWALK � 2" O.C.� 3,5Q{3 PSI CONC. 5" EXPANSION/CONTRACTION HORIZ. A JOINT F� f ' Q 2" MIN. CLEARANCE r ••° �` CONCRETE SUPPORT °.. ,• _ ..• •., .• ,. •q • a. ., • ' o BLOCK AFFIXED TO CONC. 'St 4. oA • CONCRETE • O /� RETE CHANNEL .CHANNEL WITH TYPE - - --- ------- MORTAR,- (3 Y2" X 61' X 51) ol 4" GRAVEL 5' 12" (TYP.) NOTE: ALL CONCRETE SHALL ACHIEVE MINIMUM 28---DAY, 4 • a a .d. a, d YIELD STRENGTH OF 3,500 PSI .. • , . 4 d 2" MIN. (TYP.) #4 REBAR 0 12" Q.G. I-IORIZ. SECTIQN A-W-A CONCRETE SIDEWALK BRIDGE DETAIL SCALE: NOT TO SCALE C.7.11 �........._�......_.wti. „ A rr OPTIONAL MANHOLE - 4....«,.. ..,..........«..r...,.« {..:..f i :..+k"...,�, .Jl.✓J.. ..«._..«...,.. ti , �» ar f.,. ./• r .Cr`A' li t 3 i.�r SEE STANDARD $40.54 FOR 14ANHOLE COVER FRAME 44 BARS "6 PLAN ,/ 'oPTIONAL SPACED 6=f C. TO C. BRICK MAY BE USED TO ADJUST FRAME & f" 1 COVER TO SURFACE ELEVATION MAX. 'I' c 25 f ' , OUTLET PIPE j_.47 61 INLET PIPE f� ` ' �• 'ii • , � ,. , ...SECTION G-C OR D-D ....,. y., SECTION X-X 6 t' ,�..l4 tt E P . y > a • x 13 wj •�� fr ` t � tr • . SECTION Y-Y' GENERAL NOTES: CHAMFER ALL EXPOSED CORNERS 1" USE CLASS "B" CONCRETE THROUGHOUT. OPTIONAL CONSTRUCTION - MONOLITHIC POUR t 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER, USE FORMS TO CONSTRUCT THE BOTTOM SLAB. °IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN ON STANDARD NO. 840.00. PROVIDE ALL JUNCTION BOXES OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTERS IN ACCORDANCE WITH STD. NO. 840.66. ADJUST THE STEEL, CONCRETE AND BRICK MASONRY QUANTITIES TO INCLUDE THE ADDITION OF THE MANHOLE (I.E. DIAGONAL BARS SHORTENED AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE HEIGHT BRICK MASONRY, RIPENING IN TOP SLAB.) MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION IS 12 FEET. ' M 6='. I ------ DOWEL PAVEMENT P,G.C, CURB TYPE 8" UPRIGHT CONCRETE CURB DETAIL SCALE: NOT TO SCALE CJ.1 DIMENSIONS AND QUANTITIES FOR CONCRETE µ JUNCTION BOXES I b1ENSZDNS.MDF BOX -A-ND PI REINFORCEMENT' TOP SLAB~ CUBIC `YARDS TOTAL tVANTITiI:S DEDUCTIONS FOR ONE tf tt DIMENSIONS PIPE SPAN - WIDTH --HEIGHT BARS A IN BOX I BOX AND SLABS PIPE CU.YOS.I � �_.... .....,.._._,_..rr,... .r.._._....._....rw. ,._......._._._ � «CU. !BOTTOM �LLI LBS, YDS. D A 8 H NO. LENGTH E F TOP !~�A ,, ft C. S. SLAB SLAB FT. OF HT. REINF MIN. H R.C. }}} ' tf 12 t tT -p t tt 2 _p t rt 2 -3 2 2'-9" 3'_Ot= {�_ E 1$7 = 22.w.. 4.750 ..024.- 40.165; 24 v, 0.902w W0,01^5_ 0.023 . 0.036 15t=�" 21-3r1 2t'3" 2t-+B/} 12 3'-Otl 3t-3t!" �. y 3J-31' +I~ 311$6+f^ T0.1f"i7 0.196_ _ {3s204 f ,1.065 0,033 0.049 181t - 21+6tt 2►t8=1 21_91' _ 14 31-3t1 3;-6-6't 3'»$1' 0.227 0.227 0.222 # 30 ,.... 24" 3`_Ott 3* 3}�Ort__ a1.3t; " 16 3t`g,► 4'-0" 4t-0$1 0,296 �� « 0.296� ~�0.259 _..._....�-... 40 _ 1.434 0.069 €}.085 e�h=r�t-tr 1� 3&=r 4=„Ot► �E _ 4t-0J` t�tt �- . �.4{w3tr 18 20 4s-3t, 4'-9" 4_-6tt 5=•Q== 4! _6tt 1 1 0.375 1 0.375 0.296 51 5t,'0== £I:463 1 0.463 0,333 64 1.860� 2.341 0.092 0.132 0.127 0,178 # 4,2'r 4r_6,e 4t�8tt.. ..r .. r� t, ...... -,i ry 22w ;.. r-$ft` ....v+w-.{«.,env....,...w..n1•p.,r ......v.1..,...,,.r.,...r.a!-_:.• .r}a +w8rf 0.5£0 0.560 I 0.370 > 77 2,878 `0.180 0.243 { 4$" 5=-41' 5t-4=1 5t••3" 26 61-3:= St-4=1 6'.4" 0.743 1 0.743 0.407 111 3.6.23� 0.235 0.317 54" 5'-10" 5`_,101, 5'-9't 28 6'-7" 6'-10" W-10 � 0.865 � i3.865 I � 4,283« fly 297w (3,4a1.. i 60`t y6`-6" "6t-6ll `6t_3rr 3€I 71-311M 7'-6t' MO.444 ^My12f ` 0.481 145 7` 6" 1.042 1 ,042., 5,090 0.367M # 661' 7'•1"'}•1} 8r-9" i 1.21E3 1.210 1 0.518 109 5,917 0.444 «0.495 0f589 e CONCRETE JUNCTION SOX (JB) DETAIL r3 SCALE: NOT TO SCALE CJ.i1 24" (600) o c SECTION A-- ISOMETRIC VIEW ROOT VIEW STANDARD CURB CUT DETAIL7 SCALE: NOT TO SCALE C.7.11 FINISHED GRADE'TO BE FLUSH WITH WALKWAY VARIES 5' PER PLAN 3 SLOPE 1 /4" PER FT. FROM R.O.W. IT N N. z < 03t lI 'Wo N \ 1 � Lo � 3 MIN. APPROVED COMPACTED 4" SELECT FILL COMPACTED TO SUBGRADE 95% O STANDARD PROCTOR SECTION 4" AIR ENTRAINED CONC. 4,000 P.S.I. O 28 DAYS NOTE: TRANSVERSE EXPANSION JOINTS 1 /2" WIDE SHALL BE PROVIDED AT INTERVALS OF NOT MORE THAN 20 FEET AND FILLED WITH PREFORMED BITUMINOUS CELLULAR TYPE JOINT FILLER. CONTRACTION JOINTS SHALL BE PLACED ON 5 FEET INTERVALS. LONGITUDINAL JOINTS 1/4" WIDE SHALL BE PROVIDED BETWEEN CURBS ABUTTING SIDEWALKS, AND SMALL BE FILLED WITH PREFORMED BITUMINOUS TYPE JOINT FILLER. THE TOP OF ALL JOINT FILLER SHALL BE 1 /4" BELOW THE TOP OF THE SIDEWALK. SIDEWALK DEAL DETAIL SCALE: NOT TO SCALE RESPREAD 4" TOPSOIL AND STABILIZE TYPICAL ALL DISTURBED AREAS} CONCRETE DRIVEWAY . 17' MIN. 6" THICK CONCRETE � APRON WITH FIBER + IvIESH ON 6=' ABC ' 0 I 1 Lo 24" CONCRETE VALLEY CURB .-J "''/'�l�//�/�'�� HOT MIX PAVEMENT %. O rn �s(10 • Ldco N Y_ a» • iw..�+ a � cv � m o d t3. TYPICAL CONCRETE APRON DETAIL .DETAIL 6 SCALE: NOT TO SCALE C.7.11 1 FlNISHED.FLOOR ELEVATION FINISHED FLOOR ELEVATION-\ 6 t+�- 1/2") � COMPACTED PAD GRADE PAD GRADING DETAIL DETAIL. SCALE: NOT To SCALE COMPACTED PAC) GRADE SWALE NOTES CONTRACTOR TO MAINTAIN POSITIVE DRAINAGE IN HOUSE PAD AREAS AND THROUGHOUT PROJECT AT ALL TIMES. -� o d Q 1,����t►►�tr:ie=ttrfttZd�y�Y,,...,rxw+ 1.S.1k M •� �i:;� w to ,/! 1V ti $ as g„ " RADIUS -� RADIUS GRASS MEDIAN OR CONCRETE ISLAND 2r rr .... -STD. 840.03 FRAME f GRATE AND HOOD ills" RADIUS ��- �" RAii1US�� � EXPANSION JOINT EXPANSION JOINT r ¢ A� toll T SECTION AA _,r.,.yr..w.. rr-. .... r..rv-..rv..�...�+w-..w......w�.Mn....�r..w..._.wi,.rw.e�r._ rn w.. vJ......._.rr. _ .i•_.w.....v_..r.....w.-.w.....,w_....v.v�rw...w..,....w...-.....w�....n.w.rnw.vs.wn.n....__._«....w.........,....._......,...n._..r....�w...«.,.,•,..+.�...w..w.w VAR._._.... ..VAR. R„ «�. A r 51: TO 8',. ,,. . i0 `''air lO1_Orr ''"rw�21Q,_0„ RADIUS •...~`ti, „ w. _• r r'�� 34 RADIUS .... _ r..._ ,.._.Ila" RADIUS ♦` PLAN 1,% RAD I IDS ' VAR. 101-011 , V . SECTION � 8B . . DEPRESSED GUTTER LINE EXPANSION JOINT SEE STANDARD NO. 840.01 OR 840.02 anti � ELEVATIONS Q oil 21M01, t 3" RADIUS �.. , 1/8" RA61US _7 CURB FOR CATCH BASIN DETAIL SCALE: NOT TO SCALE `1 �-- 1' - 6" CURB AND GUTTER GENERAL NOTES: USE GLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 31-6" IN DEPTH.WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION MONOLITHIC POUR, 2" KEYWAY, OR #x4 BAR DOWELS AT 12" CENTERS AS DIRECTE0 BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD, NO. 840.00 WHEN PAYMENT FOR THE DROP INLET IS MADE ON APER EACH BASIS, THE CONCRETE APRON WILL BE CONSIDERED PART OF THE DROP INLET. CONSTRUCT WITH PIPE CROWNS MATOHING. MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION xS 12 FEET. USE STANDARD FRAMES AND GRATES SEA DETAIL 4/0.7.13 SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHVWN. CHAMFER ALL EXPOSED CORNERS 1fir i DRAWING NOT TO SCALE. ,PLAN CONCRETE APFfON FRAME AND GRATES . � CONCRETE APRON j SEE DETAIL 11 CLASS 1, A as • . _ ,ONCRE 6;t ., • -Rd OUTLET PIPE 441' �._. - t1 OUTLET PIPE ,. `--SEE NOTE SECTION. X « X ��--- �Ax, 6zPE THxs sxMM , 4 s" SECTION Y -• Y MEDIAN DITCH GRADE MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE DROP INLET •�•N. r._w._.r ww._.w w.wa, v-•rw,w_.,-• - w' WIDTH _ww.rr•..rr�v n.,+._w..w•.w r HEIGHT CUBIC YARDS OF DEDUCTIONS PIPE SPAN CONCRETE IN BOX FOR ONE PIPE p A - 8 H BOTTOM SLAB H PER FT . HT. H MIN. TOTAL TOTAL C.S. � R.C. # 21t 3' - 8" 2' • p'a 1 a 4 n d, -.. U . 302 0.247� 0.391„ _ 0.753 .. 0.020 0.032 1611 __.„ '.4 1a_ � M21 010 1 `-1 " 0.362 0,247 0,463 0.815 0.023 0.036 18'a 3, . Q a: 2, -0„ 21 � 21' 0.362 0.24 7 0.615 0.877 0.033 0.049 a'Gf4" 3r. g[a.' 2d �,a 2r.8t1---° 0..'3$2 0.2a7 0.559 1 .021 O.059 0.{38S Sol? 3`,80 20-01' 31.20 0.352 0.247 0.782 1.144 0.092 0 127 3811 31 _gel 21 v 01► 3, «011 0.362 0.247 0.906 f . 268 ,,.,•r•„._._• •. } • 132 0.178 ETAIL. (APRON SUPPORT NOTCH) E � 4 i # t.,..r..._ MEDIAN D. 1. #4. , 8AR r DOWEL 1111 NOTES INSTALL ALL STEPS PROTRUDING Ott FROM INSIDE FACE OF STRUCTURE WALL. STEPS DIFFERING IN DIMENSIONS CONFIGURATION, OR MATERIALS FROM THOSE SHOWN.MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED THE ENGINEER WITH DETAILS OF fHE PROPOSED STEPS AND HAS RECEIVED WRITTEN' APPROVAL FROM THE ENGINEER FOR THE USE OF SUCH STEPS. 448 I wjy..,M.,. t[i lyti -g FLAN SIDE PLAN SIDE ELEVATION ELEVATIONLit w If- oll 5 " ` ELEVATION a 44 1 111,411 83/4 • N dd 0) 1/4 , /z 3 it PLAN SIDE ELEVATION -------- r- \ COMPOSITE t c 1/4 t1 ELEVATION #3 DEF£}RM� _ STEEL ROD SECTION A -A CAST IRON POLYPROPYLENE •...v.w.w•.rww. CAST IRON ELEVATION �. r - #6 BAR OR ,., #8 BAR , GALV D . {t SIDE PLAN ELEVATION c REINFORCING STEEL NOTE: 12" 00 NOT USE IN SANITARY SEWER MANHOLE". ELEVATION 4 r O 11 21/4 3/4�.. Y r y � �'! , 2 lL I I ", s.— col F....... .. «..., .. ..., . .. ,..- ,...., .., e.-.. ......,. r r .. , . , r• ~ \ N ......._,., .\ ....r,_r..ri..., r.+^....., w..w........w...vw. ..r««nw.w..v..: CO tV N CLAN � r, CRATE SECTION Y-Y r FOR 8i8 DIA. SOLT �t Ott Ott '{ em FRAME. SECTION Y - Y 10 co Ir GRATE, SECTION X—X ORATE SECTION X-X CTI gg { 51-10% 11 t 11 '• ;� s 'DAME SECTION X-X 21-03/ 1l FRAME SECTION X-X CONCRETE GRATED DROP INLET TYPE DFRAMES AND WIDE SLOT SAG GRATES DETAIL 3 DETAIL 4 SCALE: NOT TO SCALE C.7.1 SCALE: NOT TO SCALE CJ.13 Lai o Q Lxj Q L� Lid Q 0 SHEET NO. C. 7.13 o " Q) LZ 50' VEGETATED FILTER SEE DETAIL 1 /C.7.11 15 SPiLLVVl"% I W F-L. 4..J. , BYPASS BOX 3A 15' SPILLWAY 0 EL. 25.75' SEE DETAIL 3/C.7.10 3:1 SLOPE MAX. w w w w w .• w w �' 100 YR STORM EL. = 25.35' r -,�-- FLOW O INFIL. BASIN 3A --1 30" FLARED END SECTION BOTTOM: 22.50' RIP RAP WITH INV OUT 22.50' NOTE: SEASONAL HIGH WATER LEVEL SPREADER TABLE ELEVATION 0 20.50' SECTION 3A-3A SEE DETAIL 5/C.7.10 INFILTRATION BASIN 3A DETAIL DETAIL , 1 SCALE: NOT t0 SCALE REVISION 2. SHEET C.7.14 A. REMOVED BASINS 3D•--1, 3D-2, AND 3D--3 FROM PLANS. B. REVISED STORMWATER COLLECTION SYSTEM INVERTS, PIPE LENGTHS, INLET NUMBERS AND DRAINAGE AREAS. C. REVISED VEGETATED FILTER FOR INFILTRATION BASINS. D. REDESIGNED BASIN B. 3C ENE INV 0 PLAN VIEW 0 EL. 26.75' BYPASS BOX 3C SEE DETAIL 3/C.7.10 15' SPILLWAY 0 EL. 25.75' SLOPE MAX. w w w w w y w w •►• w w w w w w w w w w w y w w w w 100 YR STORM EL. 25.02' w w w w w w w w OFLOW ---�- III INFIL. BASIN 3C 30" FLARED RIP RAP WITH BOTTOM: 22.00' END SECTION LEVEL SPREADER NOTE: SEASONAL HIGH WATER INV OUT 22.00' SEE DETAIL 5/C.7.10 TABLE ELEVATION @ 20.00' SECTION 3C-3C INFILTRATION BASI N 3C DETAIL DETAIL 3 SCALE: NOT TO SCALE kC.7.14 15' SPILLWAY 70 EL. 22.75' �V BERM 0 EL. 23.75' N BOTTOM EL. @ 19.80' t 105' 30" FLARED END SECTION -11-100 INV OUT 19.80' 4 ff PLAN VIEW w W W W W W r W W W W W W W W W 50' VEGETATED FILTER SEE DETAIL 1 C.7.11 BYPASS BOX 3B SEE DETAIL 3/C.7.10 15' SPILLWAY 0 EL. 22.75' 3:1 SLOPE MAX. W W W W W W W W W W W W W JW W W W W W W W 100 YR STORM EL. = 22.25' O FLOW —�-- II III III III Ii IIi IIIIIIIIIIII��� I� 30" FLARED INFIL. BASIN 3B END SECTION INV OUT 19.80' RIP RAP WITH SECTION 313-38 BOTTOM: 19.80' LEVEL SPREADER NOTE: SEASONAL HIGH WATER SEE DETAIL 5/C.7.10 INFILTRATION BASIN 3B DETAIL TABLE ELEVATION 0 17.80' DETAIL � SCALE: NOT TO SCALE CJ.14 BEFORE YOU DIG CALL 1--800--632--4949 N.C. ONE -CALL CENTER IT'S THE LAW ! MAINTENANCE PLAN FOR INFILTRATION BASINS A MAINTENANCE PLAN HAS BEEN DEVELOPED TO MAINTAIN PROPER FUNCTIONALITY AND LONGEVITY OF THE STORMWATER SYSTEM. THE FOLLOWING MAINTENANCE REQUIREMENTS WILL BE OBSERVED: TWICE A YEAR: 1. GRASS AREAS IN AND AROUND THE INFILTRATION BASIN WILL BE MOWED. YEARLY: 1. AN INSPECTION WILL BE CONDUCTED AFTER A STORM EVENT TO ENSURE INFILTRATION PERFORMANCE. 2. SEDIMENT DEPOSITS WILL BE REMOVED FROM CHANNELS AND THE BYPASS BOX SUMPS. REMOVAL AND RECONSTRUCTION OF THE INFILTRATION DEVICE WILL BE NECESSARY WHEN THE INFILTRATION RATE DROPS TO BELOW 0.52 INCHES/HOUR. -w. 1 1) R E C Evi, I V. 00T2007 DWQ O co i. u N Ll 0 N co 'o L a) OZ T c T 0 CL U z c O c L N n .cEJ 0) i O o (1) c z M Q .0 :3 a o v� m �U O Q rn u v LLJ � LLJ Q Lid J Q V Q. Q)z C)= � o CECE � LLJ W OZ U O Q`�i`� ca l.d O v 4 C) .. _J CL clo LLJ 15C co I— � o o r\ o v w w o _ � c) W w � SHEET NO. C. 7.14 � N � •-. l.t,� l.v c~n 0 o Q W .. WC1 0 4�. U U z ca 0 _z w `tor, oWV), ,J Z Q w Q z �® OCT 19 2007 � r�r # :5t X06-og4Q T yIT EE, VILLAGES AT T-1, i R AT E C,R , E K TOWN OF SURF CITY, PENDER COUNTY, NORTH CAROLINA PHASE 3 STORMWATER MANAGEMENT HIGH DENSITY PERMIT APPLICATION SUPPLEMENTAL CALCULATIONS APPROVED October 17, 2007 ®����"�°�°q NORTH, CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION,,• DIVISION OF WATER QUALITY o ; C A\�VA N A U G H o SoWons through integrity and partnership ®® We provide superior client service and environmentally sound designs through integrity, communication and partnership. Consulting Engineers Environmental Professionals 130 N. Front Street, Suite 202, Wilmington, North Carolina 28401, Phone 91 Land Surveyors Design Professionals Fax 910/39244B12 TABLE OF CONTENTS • Drainage Area Design Sheet • Pre & Post Development Conditions Hydrographs and Summaries • Pipe Area Weighted 'C' Value • Pipe Sizing Calculations • Conduit Outlet Protection • Drainage Area Maps The Villages at Turtle Creek Stormwater Management High Density Permit Application DRAINAGE AREA DESIGN SHEET The Villages at Turtle Creek Stormwater Management High Density Permit Application 0 DATE: PROJECT: PROJECT NO.: DESCRIPTION: DRAINAGE AREA DESIGN SHEET DRAINAGE AREA 3A Post Development C Aft A ac 1 Dwelling & Driveway 095'. 70,932 2 Sidewalk 3 Street & Gutter 42,154 .. 0. 4 Grass 6 7 8 Weighted C 0153 Total Area 31 365 7.17 ImperviousArea. 126,8361 2.91 Percent Impervious 40.6% Volume Runoff to be Controlled From 1.5" Storm Rv=0.05+0.009(1) (Simple Method, Scheuler) 1= '' 406 ' Percent Impervious Rv- '' 0.42 Runoff Coefficient V=P"Rv`Ad P= 1.5 in Design Rainfall V= ":::. 0.372 ac-ft Volume To Be Traded V= ''' 16,22.1, ft3 Volume To Be Treated A= 5;081 ft2 Area of Treatment Device D= 2.75 ft Pool Depth V= 17,611 ft3 Volume of Treatment 2050.ft Seasonal High water Table Elevation 22.50 ft Bottom of Treatment Device 25.25 ft Water Suface Elevation Drawdown Calculation .... V=,, 16,221 ft3 Volume To Be Drawn Down A= 5,081 ft2 Area of Treatmed Device k= 6 4 inlhr Most Restrictive Infiltration Rate t= 5 hrs Drawdown Time t= 0.21 days 1 OF 3 DESIGN BY: ECG CHECKED BY: EST PROJECT: PROJECT NO.: DESCRIPTION: DRAINAGE AREA DESIGN SHEET DRAINAGE AREA 36 Post Development C A A ac 1 Dwelling B Driveway A95 , 53,578 1:.23... . 2 Sidewalk 0,95 14,237 0.33 3 Street & Gutter GAS,, 33,581 1 .077 4 Pump Station 0..95 Z738 ,, 0.06 6 Grass 0.25 •: ' ` $0,658 1.85 7 i 8 Weighted C 0.64 Total Area 184,692 4.24 Im rvious Area 104,133 2.39 Percent Im rvious 56.4% Volume Runoff to be Controlled From 1.5" Storm Rv=0.05+0.009(I) (Simple Method, Scheuler) 1= 56.4 Percent Impervious Rw 0.56 Runoff Coeffident V=P'Rv'Ad P= 1.5 in Design Rainfall V= : 0.296 ac ft Volume To Be Treated V= 12 869 113 Volume To Be Treated A= 4,288 f? Area of Treatment Device D= 2.45 ft Pod Depth Drawdown Calculation 2 OF 3 DESIGN BY: ECG CHECKED BY: EST V= 13,081 ft3 Volume of Treatment 17.80 ft Seasonal High Water Table Elevation 19 80 ft Bottom of Treatment Device 22 2 �, ft Water Suface Elevation V= 12,869 ft' Volume To Be Drawn Down A= 4,288 ftZ Area of Treatment Device k=(, :%_' in/hr Most Restrictive Infiltration Rate t= 5 hrs Drewdown Time t= 0.19 days DRAINAGE AREA DESIGN SHEET DATE: 10/17/2007 SHEET 3 OF 3 PROJECT: Turtle Creek- Phase 3 DESIGN BY: ECG PROJECT NO.: 041.05.043 CHECKED BY: EST DESCRIPTION: Basin Drairwge Area Aneiysis DRAINAGE AREA 3C Post Devel ment C A A ac 1 Dwelling & Driveway 69,819 1: Q.y 2 Sidewalk 3 Street & Gutter ;•. 6t1. 1$. 4 Grass Q. r' .. 121,07 : 2--ft 6 7 8 Weighted C D.61 Total Area 253 5.81 Impervious Ares 131,4751 3.02 Percent Impervious 52.0% Volume Runoff to be Controlled From 1.5" Storm Rv■0.05+0A09(1) (Simple Method, Scheuler) 1= 52.0, :' ':: Percent Impervious Rv=:. Runoff Coaf6cient V=P"RWAd P= 1.5 in Design Rainfall V=;,:;' :'0.376soft Volume To Be Treated V= '' 18,37$ ft3 Volume To Be Treated A= 4,123 ftz Area of Treatment Device D= 3.25 ft Pool Depth V= 19,042 ft3 Volume of Treatment 2000.ft Seasonal High Water Table Elevation 2200.ft Bottom of Treatment Device 25.25 ft Water Suface Elevation Drawdown Calculation V=... 161373 ft? Volume To Be Drawn Down A= 4,123 ft2 Area of Treatment Device k- 6 70 in/hr Most Rostdctive Infift ation Rate t= 6 hrs Drawdown Time t= 0.24 days DRAINA6 AREA DESIB SHEET DAE October 17, 2007 BE 1 OF 1 PROST 3rtle Creek Phase 3 DMY BG PROMIU.: 041.05.043 CHEB BY 18 DBRIPIDN 8b-Basin Drainage Area Analysis DRAINAB AREA 3 Post Development C A fe A ac 1 Dwelling Wriveway 0.95 194.329 d.46 2 Newalk 0.95:'' 39,028 0.9Q. 3 Seat 8ater 85 .:: 126,350 ' 2-W 4 Pump Bdion 0.95 .:.: 2,738 0.1% 6 ass 025 387,406 8.90 . 7 8 Weighted C 0.59 Total Area 750.109 17.22 Impervious Area 362,444 8.32 Percent Impervious 48.3% @ CiA i zT.2 inter C 4Nelghted C A :tal area in acres Q 72.77 PRE & POST DEVELOPMENT CONDITIONS HYDROGRAPHS AND SUMMARIES The Villages at Turtle Creek Stormwater Management High Density Permit Application H Table of Contents Hydraflow Hydrographs by Intelisolve IP Phase 3 Basins.gpw Wednesday, Oct 17 2007, 1:36 PM Hydrograph Return Period Recap............................................................................ 1 2 - Var SummaryReport ....................................................................................................................... 2 HydrographReports................................................................................................................. 3 Hydrograph No. 1, Rational, Pre Development 3A................................................................. 3 Hydrograph No. 2, Rational, Post Development 3A............................................................... 4 Hydrograph No. 3, Reservoir, Post 3A to Basin 3A................................................................ 5 PondReport ....................................................................................................................... 6 Hydrograph No. 5, Rational, Pre Development 3B................................................................. 7 Hydrograph No. 6, Rational, Post Development 3B............................................................... 8 Hydrograph No. 7, Reservoir, Post 3B to Basin 3B................................................................ 9 PondReport ..................................................................................................................... 10 Hydrograph No. 9, Rational, Pre Development 3C............................................................... 11 Hydrograph No. 10, Rational, Post Development 3C........................................................... 12 Hydrograph No. 11, Reservoir, Post 3C to Basin 3C............................................................ 13 PondReport ........................................................................................................ 14 ............. Hydrograph No. 13, Combine, Combined Pre Development ................................................ 15 Hydrograph No. 14, Combine, Combined Post Development .............................................. 16 Hydrograph No. 15, Combine, Combined Post Development Routed .................................. 17 10 - War SummaryReport ..................................................................................................................... HydrographReports 18 ............................................................................................................... Hydrograph No. 1, Rational, Pre Development 3A............................................................... 19 19 Hydrograph No. 2, Rational, Post Development 3A............................................................. 20 Hydrograph No. 3, Reservoir, Post 3A to Basin 3A.............................................................. 21 PondReport ..................................................................................................................... 22 Hydrograph No. 5, Rational, Pre Development 3B............................................................... 23 Hydrograph No. 6, Rational, Post Development 3B............................................................. 24 Hydrograph No. 7, Reservoir, Post 3B to Basin 3B.............................................................. 25 PondReport ..................................................................................................................... 26 Hydrograph No. 9, Rational, Pre Development.3C............................................................... 27 Hydrograph No. 10, Rational, Post Development 3C........................................................... 28 Hydrograph No. 11, Reservoir, Post 3C to Basin 3C............................................................ 29 PondReport ..................................................................................................................... 30 Hydrograph No. 13, Combine, Combined Pre Development ................................................ 31 Hydrograph No. 14, Combine, Combined Post Development .............................................. 32 Hydrograph No. 15, Combine, Combined Post Development Routed .................................. 33 100 - War SummaryReport..................................................................................................................... 34 HydrographReports............................................................................................................... 35 Hydrograph No. 1, Rational, Pre Development 3A............................................................... 35 Hydrograph No. 2, Rational, Post Development 3A............................................................. 36 Hydrograph No. 3, Reservoir, Post 3A to Basin 3A.............................................................. 37 PondReport ..................................................................................................................... 38 Hydrograph No. 5, Rational, Pre Development 3B............................................................... 39 Hydrograph No. 6, Rational, Post Development 3B............................................................. 40 Hydrograph No. 7, Reservoir, Post 3B to Basin 3B.............................................................. 41 Contents IP Phase 3 Basins.gpw PondReport..................................................................................................................... 42 Hydrograph No. 9, Rational, Pre Development 3C............................................................... 43 Hydrograph No. 10, Rational, Post Development 3C........................................................... 44 Hydrograph No. 11, Reservoir, Post 3C to Basin 3C............................................................ 45 PondReport ..................................................................................................................... 46 Hydrograph No. 13, Combine, Combined Pre Development ................................................ 47 Hydrograph No. 14, Combine, Combined Post Development .............................................. 48 Hydrograph No. 15, Combine, Combined Post Development Routed .................................. 49 Hydrograph Return Period Recap Hyd. Hydrograph Inflow Pealoutllo4cfs) Hydrograph No. type Hyd(s) description (origin) 1-Y 2-Y 5- T-V 104 r 25-Y E50-V 100-Y 1 Rational --- 0.00 9.02 -- ---- 11.29 12.81 --- 15.32 Pre Development 3A 2 Rational --- 0.00 19.12 --- --- 23.94 27.15 -- 32.48 Post Development 3A 3 Reservoir 2 0.00 1.01 ---- ---- 1.07 1.11 --- 1.60 Post 3A to Basin 3A 5 Rational --- 0.00 5.33 ---- -- 6.68 7.57 ----- 9.06 Pre Development 3B 6 Rational ---- 0.00 13.65 ---- --- 17.10 19.39 ----- 23.20 Post Development 3B 7 Reservoir 6 0.00 0.82 --- ---- 0.86 0.89 ---- 0.94 Post 3B to Basin 3B 9 Rational --• 0.00 7.31 --- ----- 9.15 10.38 ---- 12.42 Pre Development 3C 10 Rational 0.00 17.83 -- ---- 22.33 25.32 --- 30.30 Post Development 3C 11 Reservoir 10 0.00 0.96 -- ---- 1.03 1.07 ---- 1.15 Post 3C to Basin 3C 13 Combine 1, 5, 9, 0.00 21.66 ---- --- 27.12 30.76 -- 36.80 Combined Pre Development 14 Combine 2, 6, 10, 0.00 50.60 ---- ---- 63.36 71.86 -- 85.98 Combined Post Development 15 Combine I 3, 7, 11, I 0.00 I 2.78 I --- --- 2.96 3.08 3.69 Combined Post Development Routed Proj. file: IP Phase 3 Basins.gpw Wednesday, Oct 17 2007, 1:36 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph Peak type flow interval (origin) (cfs) Time (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum Hydrograph storage description (cuft) 1 Rational 9.02 1 10 5,411 — ---- --- Pre Development 3A 2 Rational 19.12 1 10 11,471 --- Post Development 3A 3 Reservoir 1.01 1 19 11,468 2 24.28 10,621 Post 3A to Basin 3A 5 Rational 5.33 1 10 3,200 --- Pre Development 3B 6 Rational 13.65 1 10 8,192 --- ----- Post Development 3B 7 Reservoir 0.82 1 19 8,190 6 21.30 7,447 Post 3B to Basin 3B 9 Rational 7.31 1 10 4,385 -- Pre Development 3C 10 Rational 17.83 1 10 10,699 --- ---- Post Development 3C 11 Reservoir 0.96 1 19 10,693 10 23.94 9,977 Post 3C to Basin 3C 13 Combine 21.66 1 10 12,996 1, 5, 9, ---- Combined Pre Development 14 Combine 50.60 1 10 30,361 2, 6, 10, -- Combined Post Development 15 Combine 2.78 1 19 30,351 3, 7, 11, ---- Combined Post Development Routed IP Phase i 3 Basins.gpw I Return Period: 2 Isar Wednesday, Oct 17 2007, 1:36 PM Hyaratiow Hyarograpns oy mteiisoive Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 1 Pre Development 3A Hydrograph type = Rational Storm freqency = 2 yrs Drainage area = 7.170 ac Intensity = 5.031 in/hr IDF Curve = WILMINGTON-IDF.IDF I I Q (cfs) 1 8.00 1 6.00 4.00 2.00 0.00 0.0 Hyd No. 1 0.1 Pre Development 3A Hyd. No. 1 — 2 Yr 0.2 Wednesday, Oct 17 2007,1:36 PM Peak discharge = 9.02 cfs Time interval = 1 min Runoff coeff. = 0.25 Tc by User = 10.00 min Asc/Rec limb'fact = 1/1 0.3 Hydrograph Volume = 5,411 cult Q (cfs) 10.00 8.00 M 4.00 2.00 0.00 0.3 Time (hrs) 3 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development 3A Hydrograph type = Rational Storm freqency = 2 yrs Drainage area = 7.170 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Post Development 3A Q (cfs) Hyd. No. 2 -- 2 Yr 21.00 18.00 15.00 12.00 9.00 .......... ... ........... ... ... 6.00 .. ........... ....... 3.00 ............. ..... 0 00 4 Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 19.12 cfs Time interval = 1 min Runoff coeff. = 0.53 Tc by User = 10.00 min Asc/Rec limb fact = 1 /1 Hydrograph Volume = 11,471 cult Q (cfs) 21.00 18.00 15.00 I I 12.00 9.00 1 6.00 3.00 0.00 0.0 0.1 0.2 0.3 0.3 Time (hrs) Hyd No. 2 Hydrograph Plot ` Hydraflow Hydrographs by Intelisolve Hyd. No. 3 I Post 3A to Basin 3A Hydrograph type = Reservoir Storm fregency = 2 yrs Inflow hyd. No. = 2 Reservoir name = Basin 3A Storage Indication method used. Q (cfs) 21.00 1 18.00 15.00 12.00 AM 3.00 Wednesday, Oct 17 20C 7, 1:36 PM Peak discharge = 1.01 cfs Time interval = 1 min Max. Elevation = 24.28 ft Max. Storage = 10,621 tuft Hydrograph Volume = 11,468 cult Q (cfs) 21.00 18.00 15.00 12.00 9.00 3.00 0 00 v 1 i i I 0.00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 6.0 6.7 7.3 Hyd No. 3 Hyd No. 2 Time (hrs) Mi Pond Report Hydraflow Hydrogranhs by Intelisolve Wednesday, Oct 17 2007, 1:36 PM Pond No. 1 - Basin 3A Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 22.50 5,081 0 0 0.50 23.00 5,536 2,654 2,654 1.50 24.00 6,506 6,021 8,675 2.50 25.00 7,533 7,020 15,695 2.75 25.25 7,791 1,916 17,611 3.25 25.75 8,319 4,027 21,638 3.50 26.00 8,588 2,113 23,751 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 30.00 0.00 0.00 0.00 Crest Len (ft) = 4.00 15.00 0.00 0.00 Span (in) = 30.00 0.00 0.00 0.00 Crest El. (ft) = 25.25 25.75 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 23.35 0.00 0.00 0.00 Weir Type = Riser Rect -- Length (ft) = 62.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.25 0.00 0.00 0.00 N Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multistage = n/a No No No Exi'lItration = 6.400 inthr (Contour) Tailwater Elev. = 0.00 It Note: Culvert/Orlflce outflows have been analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.00 0.00 " 0.00 Stage I Discharge 2.00 4.00 6.00 8.00 10.00 12.00 14.00 Total Q Stage (ft) 4.00 3.00 2.00 1.00 r 0.00 16.00 18.00 Discharge (cfs) s Hydrograph Plot Hydraflow Hydrographs by Intellsolve l Hyd. No. 5 Pre Development 3B I Hydrograph type = Rational Storm freqency = 2 yrs Drainage area = 4.240 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 6.00 4.00 KKIA 2.00 1.00 Pre Development 3B Hyd. No. 5 — 2 Yr Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 5.33 cfs Time interval = 1 min Runoff coeff. = 0.25 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 3,200 cult 0.00 v 1 1 Iy 0.0 Hyd No. 5 0.1 0.2 0.3 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.3 Time (hrs) 7 Hydrograph Plot Hydratlow Hydrographs by Intelisolve Hyd. No. 6 Post Development 3B Hydrograph type = Rational Storm freqency 2 yrs Drainage area = 4.240 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0 00 Post Development 3B Hyd. No. 6 — 2 Yr F r � Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 13.65 cfs Time interval = 1 min Runoff coeff. = 0.64 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 8,192 cult .__......... ....... _.. / I ...... ... I_ . I Nc.._- ......... _ . Q (cfs) 14.00 12.00 10.00 8.00 6.00 '1 4.00 2.00 0.00 0.0 0.1 0.2 0.3 0.3 Time (hrs) Hyd No. 6 Hydrograph Plot I Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Post 313 to Basin 3B Hydrograph type = Reservoir Storm fregency = 2 yrs Inflow hyd. No. = 6 Reservoir name = Basin 313 Storage Indication method used. Wednesday, Oct 17 2007,1:36 PM Peak discharge = 0.82 cfs Time interval = 1 min Max. Elevation = 21.30 ft Max. Storage = 7,447 cuft Hydrograph Volume = 8,190 cuft Pond Report HY draliow Hydrogranhs by Intelisolve Wednesday, Oct 17 2007, 1:36 PM Pond No. 2 - Basin 3B Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 19.80 4,288 0 0 0.20 20.00 4,452 874 874 1.20 21.00 5,300 4,876 5,750 2.20 22.00 6,203 5,751 11,501 2.45 22.25 6,438 1,580 13,081 2.95 22.75 6,921 3,340 16,420 3.20 23.00 7,167 1,761 18,181 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 30.00 0.00 0.00 0.00 Crest Len (ft) = 4.00 15.00 0.00 0.00 Span (In) = 30.00 0.00 0.00 0.00 Crest EL (ft) = 22.25 22.75 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 18.20 0.00 0.00 0.00 Weir Type = Riser Rect --- Length (ft) = 101.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.25 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No Exfiltration = 6.340 Whir (Contour) Tailwater Elev. 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.00 0.00 - 0.00 2.00 - Total Q Stage / Discharge 4.00 6.00 8.00 10.00 12.00 14.00 Stage (ft) 4.00 3.00 2.00 1.00 --L- 0.00 16.00 Discharge (c%) Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 9 Pre Development 3C Hydrograph type = Rational Storm freqency = 2 yrs Drainage area = 5.810 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 8.00 99 4.00 2.00 Hyd No. 9 0.1 Pre Development 3C Hyd. No. 9 -- 2 Yr 0.2 Wednesday, Oct 17 2007, 1:3B PM Peak discharge = 7.31 cfs Time interval = 1 min Runoff coeff. = 0.25 Tc by User = 10.00 min Asc/Rec limb fact = 1 /1 0.3 Hydrograph Volume = 4,385 cult Q (cfs) 8.00 4.00 2.00 0.00 0.3 Time (hrs) 11 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 10 Post Development 3C Hydrograph type = Rational Storm freqency = 2 yrs Drainage area = 5.810 ac Intensity = 5.031 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 18.00 15.00 __.....----- ----......- ........ ........................................................................................................ 12.00 9.00 6.00 3.00 0 00 Post Development 3C Hyd. No. 10 -- 2 Yr 12 Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 17.83 cfs Time interval = 1 min Runoff coeff. = 0.61 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 10,699 cult Q (cfs) 18.00 15.00 E A 12.00 lJ 9.00 6.00 ` 3.00 0.00 0.0 0.1 0.2 0.3 0.3 Time (hrs) Hyd No. 10 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 11 Post 3C to Basin 3C Hydrograph type = Reservoir Storm freqency = 2 yrs Inflow hyd. No. = 10 Reservoir name = Basin 3C Storage Indication method used. Q (Cfs) 18.00 15.00 f i 12.00 f 6.00 3.00 Post 3C to Basin 3C Hyd. No. 11 — 2 Yr Wednesday, Oct 17 2007,1:36 PM Peak discharge = 0.96 cfs Time interval = 1 min Max. Elevation = 23.94 ft Max. Storage = 9,977 cuft Hydrograph Volume = 10,693 cult Q (cfs) 18.00 15.00 12.00 .., M 3.00 0.00 " l 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Hyd No. 11 Hyd No. 10 Time (hrs) 13 Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Oct 17 2007, 1:36 PM Pond No. 3 - Basin 3C Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 22.00 4,123 0 0 1.00 23.00 5,152 4,638 4,638 2.00 24.00 6,244 5,698 10,336 3.00 25.00 7,397 6,821 17,156 3.25 25.25 7,691 1,886 19,042 3.75 25.75 8,289 3,995 23,037 4.00 26.00 9,235 2,191 25,228 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 30.00 0.00 0.00 0.00 Span (in) = 30.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert Ell. (it) = 24.88 0.00 0.00 0.00 Length (ft) = 33.00 0.00 0.00 0.00 Slope (%) = 0.28 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 Orlf. Coeff. = 0.60 0.00 0.00 0.00 Multistage = n/a No No No Stage (ft) 4.00 3.00 2.00 1.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 4.00 15.00 0.00 0.00 Crest El. (ft) = 25.25 25.75 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type = Riser Real - --- Multi-Stage = Yes No No No Exfiltratlon = 6.700 in/hr (Contour) Tailwater Elev. = 0.00 It Note: CulverVOdfioe outflows have been analyzed under inlet and outlet control. Stage / Discharge Stage (ft) 4.00 3.00 2.00 1.00 0.00 1/ I I I I I I I i I I ' 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 Discharge (cfs) Total Q I Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 13 Combined Pre Development Hydrograph type = Combine Storm freqency = 2 yrs Inflow hyds. = 1, 5, 9 Q (cfs) I 24.00 20.00 16.00 12.00. Wednesday, Oct 17 2007,1:36 PM Peak discharge = 21.66 cfs Time interval = 1 min Hydrograph Volume = 12.996 cult Combined Pre Development Hyd. No. 13 -- 2 Yr 0.1 Hyd No. 1 0.2 Hyd No. 5 Q (cfs) 24.00 20.00 FMM 12.00 M 4.00 0.00 0.3 0.3 Time (hrs) Hyd No. 9 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 14 Combined Post Development Hydrograph type = Combine Storm freqency = 2 yrs Inflow hyds. = 2, 6, 10 Q (ds) 60.00 50.00 40.00 30.00 0.0 0.1 Hyd No. 14 — Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 50.60 cfs Time interval = 1 min Hydrograph Volume = 30,361 cub Combined Post Development Hyd. No. 14 -- 2 Yr Hyd No. 2 0.2 Hyd No. 6 Q (C%) 60.00 50.00 40.00 ►i 30.00 20.00 10.00 1 "' 0.00 0.3 0.3 Time (hrs) Hyd No. 10 17 Hydrograph Plot Hydreflow Hydrographs by IMelisolve Hyd. No. 15 I Combined Post Development Routed Hydrograph type = Combine Storm freqency = 2 yrs Inflow hyds. = 3, 7, 11 Q (cfs) 3.00 2.00 1.00 0.00 0.0 0.8 1.7 Hyd No. 15 Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 2.78 cfs Time interval = 1 min Combined Post Development Routed Hyd. No. 15 -- 2 Yr 2.5 3.3 4.2 5.0 5.8 — Hyd No. 3 Hyd No. 7 Hydrograph Volume = 30,351 cult Q (cfs) 3.00 2.00 1.00 0.00 6.7 7.5 8.3 — Hyd No. 11 Time (hrs) 16 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow 1 (cfs) Time nterval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 11.29 1 10 6,776 -- --- Pre Development 3A 2 Rational 23.94 1 10 14,364 -- --- ---- Post Development 3A 3 Reservoir 1.07 1 20 14,361 24.68 13,451 Post 3A to Basin 3A 5 Rational 6.68 1 10 4,007 -- Pre Development 3B 6 Rational 17.10 1 10 10,257 Post Development 3B 7 Reservoir 0.86 1 19 10,256 21.65 9,464 Post 3B to Basin 3B 9 Rational 9.15 1 10 5,490 --- Pre Development 3C 10 Rational 22.33 1 10 13,397 --- Post Development 3C 11 Reservoir 1.03 1 20 13,391 10 24.33 12,599 Post 3C to Basin 3C 13 Combine 27.12 1 10 16,273 1, 5, 9, ------ Combined Pre Development 14 Combine 63.36 1 10 38,018 2, 6, 10, --- -- Combined Post Development 15 3 Combine 2.96 1 20 38,008 3, 7, 11, ------ Combined Post Development Routed I I IP Phase 3 Basins.gpw Return Period: 10 Year Wednesday, Oct 17 2007, 1:36 PM Hydraflow Hydrographs by Intelisolve 19 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development 3A Hydrograph type =Rational arm fregency =10 yrs Drainage area =7.170 ac Intensity =6.300 inter IDFCurve =WIMIB DFFDF %fs) 12.00 10.00 I 8.00 I 6.00 4.00 2.00 Hyd bl 1 0.1 Wednesday, Oct 17 2007, 1:36 PM Pealdischarge =11.29 cfs Tine interval =1 min Runoff coeff. =0.25 W by Ibr 4 0.00 min AscRec limb fact =1 A Pre Development 3A Hyd. bl 1 —10 V 0.2 0.3 Hydrograph blume :6,776 cult (Ofs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0.3 Tine [ors) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development 3A Hydrograph type =Rational Firm fregency =10 yrs Drainage area =7.170 ac Intensity =6.300 inhr IDFCurve=WIMIiBHDFFDF (ifs) 24.00 20.00 16.00 12.00 8.00 4.00 Hyd K2 0.1 2( Wednesday, Oct 17 2007, 1:36 PM Pealdischarge =23.94 cfs The interval =1 min Runoff coeff. =0.53 ' T by for - =4 0.00 min AscRec limb fact =1A Post Development 3A Hyd. U 2 —10 Y 0.2 0.3 Hydrograph biume =44,364 cult 0.00 0.3 The firs) 21 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Post 3A to Basin 3A Hydrograph type =Reservoir Ebrm fregency =10 yrs Inflow hyd. bl. =2 Reservoir name =Basin 3A Enrage Indication method used. ((ifs) 24.0 16.00 12.00 8.00 4.00 Wednesday, Oct 17 2007,1:36 PM Pealdischarge =1.07 cfs The interval =1 min MaxFovation =24.68 ft Maxtbrage =13,451 cuft Post 3A to Basin 3A Hyd. bl 3 —10 V Hydrograph Blume =44,361 cuft (A«) 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 6.0 6.7 7.3 8.0 Tine (trs) Hyd bl 3 Hyd bl 2 Pond Report Hydrallow Hydrographs by Intelisolve Wednesday, Oct 17 2007, 1:36 PM Pond No. 1 - Basin 3A Pond Data Pond storage is based on hown contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 22.50 5,081 0 0 0.50 23.00 5,536 2,654 2,654 1.50 24.00 6,506 6,021 8,675 2.50 25.00 7,533 7,020 15,695 2.75 25.25 7,791 1,916 17,611 3.25 25.75 8,319 4,027 21,638 3.50 26.00 8,588 2,113 23,751 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) =30.00 0.00 0.00 0.00 Crest Len (ft) =4.00 15.00 0.00 0.00 Span (in) =30.00 0.00 0.00 0.00 Crest El. (ft) =25.25 25.75 0.00 0.00 No. Barrels =1 0 0 0 Weir Coeff. =3.33 3.33 0.00 0.00 Invert El. (ft) =23.35 0.00 0.00 0.00 Weir Type =Riser Reel --- Length (ft) =62.00 0.00 0.00 0.00 Multi -Stage =Vs bl bi bl Slope (%) =0.25 0.00 0.00 0.00 N-Value =.009 .000 .000 .000 Orif. Coeff. =0.60 0.00 0.00 0.00 Multi -Stage =nH bl d d Exfiltration = 6.400 inhr Contour) Tilwater rev, =0.00 ft Us: Cu;vertOrifice outflows have been anelyed under inlet and outlet control. tkge tt) 4.00 3.00 2.00 1.00 000 Stage / Discharge thge R) 4.00 3.00 2.00 1.00 000 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 alai Q Discharge (fs) 22 Hydrograph Plot i Hydraflow Hydrographs by Intellsolve Hyd. No. 5 Pre Development 3B Hydrograph type =Rational arm fregency =10 yrs Drainage area =4.240 ac Intensity =6.300 inter IDFDurve =WIMIBMDFFDF WS) 7.00 I 6.00 e 5.00 4.00 3.00 2.00 L 1.00 0 00 Wednesday, Oct 17 2007,1:36 PM Pealdischarge =6.68 cfs one interval =1 min Runoff coeff. =0.25 W by kbr =4 0.00 min AscRec limb fact =111 Hydrograph Blume =4,007 cult (ifs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.0 0.1 0.2 0.3 0.3 Hyd bl 5 fne ors) L Pre Development 3B Hyd. bl 5 --10 N 23 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Post Development 3B Hydrograph type =Rational Ebrm fregency =10 yrs Drainage area =4.240 ac Intensity =6.300 inter IDFCurve =WIL?IIMMDFfDF 24 Wednesday, Oct 17 2007, 1:36 PM Pealdischarge =17.10 cfs The interval =1 min Runoff coeff. =0.64 if by kbr A 0.00 min AscRec limb fact =1 A Post Development 3B Hyd. bl 6 --10 V 0.1 0.2 0.3 Hydrograph blume 40,257 cult (Ofs) 18.00 15.00 f 12.00 9.00 6.00 3.00 0.00 0.3 The firs) K-i Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Post 3B to Basin 313 Hydrograph type =Reservoir 8brm fregency =10 yrs Inflow hyd. DL =6 Reservoir name =Basin 313 %rage Indication method used. %fs) 18.00 15.00 12.00 M �T Wednesday, Oct 17 2007, 1:36 PM Pealdischarge =0.86 cfs Tine interval =1 min Maxi vation =21.65 ft Maxtbrage =9,464 cuft Hydrograph Blume =4 0,256 cuff Post 3B to Basin 313 Hyd. K7-10Y (Ofs) 18.00 15.00 12.00 9.00 . �� 3.00 0.00 V i i I I I I I I I I 1 0.00 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 Hyd bi 7 Hyd bL 6 Tine ors) Pond Report 26 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 17 2007, 1:36 PM Pond No. 2 - Basin 3B Pond Data Pond storage is based on hown contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 19.80 4,288 0 0 0.20 20.00 4,452 874 874 1.20 21.00 5,300 4,876 5,750 2.20 22.00 6,203 5,751 11,501 2.45 22.25 6,438 1,580 13,081 2.95 22.75 6,921 3,340 16,420 3.20 23.00 7,167 1,761 18,181 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) =30.00 0.00 0.00 0.00 Crest Len (ft) =4.00 15.00 0.00 0.00 Span (in) =30.00 0.00 0.00 0.00 Crest El. (ft) =22.25 22.75 0.00 0.00 No. Barrels =1 0 0 0 Weir Coeff. =3.33 3.33 0.00 0.00 Invert El. (ft) =18.20 0.00 0.00 0.00 Weir Type =Riser Rect -- --- Length(ft) =101.00 0.00 0.00 0.00 Multi -Stage =hrs N N N Slope (%) =0.25 0.00 0.00 0.00 N Value =.009 .000 .000 .000 Orif. Coeff. =0.60 0.00 0.00 0.00 Multistage =n6 bl N bi Exfiltration = 6.340 inter 1pontour) Fiilwater rev. =0.00 ft ®ge $) 4.01 3.00 2.00 1.00 0.00 -L�- 0.00 Stage I Discharge 2.00 4.00 6.00 8.00 Rai Q tie: CulvertDriice outflows have been analyed under inlet and outlet control 10.00 12.00 14.00 Ehge if) 4.00 3.00 2.00 1.00 --J- 0.00 16.00 Discharge ifs) Hydrograph Plot ' Hydraflow Hydrographs by Inblisolve Hyd. No. 9 Pre Development 3C Hydrograph type =Rational arm fregency =10 yrs Drainage area =5.810 ac Intensity =6.300 inhr ( IDFCurve =WIMIGHDFFDF (ifs) 10.00 8.00 C 6.00 4.00 1 2.00 L 0.00 0.0 L— Hyd bt 9 0.1 Wednesday, Oct 17 2007, 1:36 PM Pealdischarge =9.15 cfs The interval =1 min Runoff coeff. =0.25 f by kbr =4 0.00 min AscRec limb fact =111 Hydrograph biume =6,490 cult Pre Development 3C Hyd. bl 9 --10 V W 0.3 (Ofs) 10.00 8.00 6.00 4.00 2.00 0.00 0.3 The Ctrs) 27 2f Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 10 Post Development 3C Hydrograph type =Rational Srm fregency =10 yrs Drainage area =5.810 ac Intensity =6.300 inter IDFCurve =WIMIMHDFFDF Qlfs) 24.01 20.00 16.00 12.00 8.00 4.00 Wednesday, Oct 17 2007, 1:36 PM Pealdischarge =22.33 cfs Tine interval =1 min Runoff coeff. =0.61 Tby Ibr =40.00 min AscRec limb fact =1A Hydrograph blume =4 3,397 cult Post Development 3C Hyd. K 10 --10 V .. .. . .. ..... .... . . . . .. ..... ....... .. . . . . . . .. . ..... ... . ... 0.00 " 0.0 Hyd bl 10 0.1 0.2 0.3 %fS) 24.00 20.00 16.00 , 12.00 8.00 4.00 "L 0.00 0.3 Tine �rs) 29 Hydrograph Plot Hydraflow Hydrographs by IrMlsolve Hyd. No. 11 Post 3C to Basin 3C Hydrograph type ' =Reservoir arm fregency =10 yrs Inflow hyd. DE =10 Reservoir name =Basin 3C f6rage Indication method used. ON I 24.0 20.0 16.00 12.00 8.00 t 4.00 Wednesday, Oct 17 2007,1:36 PM Peaklischarge =1.03 cfs The interval =1 min Maxicevation =24.33 ft Maxtbrage=12,599 cuft Post 3C to Basin 3C Hyd. bl 11 —10 if Hydrograph Blume 43,391 cuR (ifs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 " ' ' ' ' ' 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 The �lrs) Hyd DL 11 Hyd DL 10 Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Oct 17 2007, 1:36 PM Pond No. 3 - Basin 3C Pond Data Pond storage is based on hown contour areas. Average end area method used. Stage / Storage Table Stage (Ift) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuff) 0.00 22.00 4,123 0 0 1.00 23.00 5,152 4,638 4,638 2.00 24.00 6,244 5,698 10,336 3.00 25.00 7,397 6,821 17,156 3.26 25.25 7,691 1,886 19,042 3.75 25.75 8,289 3,995 23,037 4.00 26.00 9,235 2,191 25,228 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) =30.00 0.00 0.00 0.00 Crest Len (f) =4.00 15.00 0.00 0.00 Span (in) =30.00 0.00 0.00 0.00 Crest El. (ft) =25.25 25.75 0.00 0.00 No. -Barrels =1 0 0 0 Weir Coeff. =3.33 3.33 0.00 0.00 Invert El. (ft) =24.88 0.00 0.00 0.00 Weir Type =Riser Rect --- - Length (ft) =33.00 0.00 0.00 0.00 Multi -Stage =VS 61 N bi Slope (%) =0.28 0.00 0.00 0.00 N-Value =.009 .000 .000 .000 Orlf. Coeff. =0.60 0.00 0.00 0.00 Multi -Stage =rtd bl bl bl Exfiltration = 6.700 inter contour) Fiilwater fv. =0.00 ft thge R) 4.0 1411I111 2.00 1.00 Stage ! Discharge bte: CuivertOrifioe outflows have been analyed under inlet and outlet control Ekge (1) 4.00 3.00 2.00 1.00 0.00 1- I II I I 1 I I I I 1 1- 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 Vital Q Discharge ifs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 13 Combined Pre Development Hydrograph type =Combine lbrm freciency =10 yrs Inflow hyds. =1, 5, 9 0.0 Hyd bi 13 Wednesday, Oct 17 2007, 1:36 PM Pealdischarge =27.12 cfs The interval =1 min Hydrograph blume z4 6,273 cult Combined Pre Development Hyd. bi 13 —10 b1 WS) 28.00 / - 24.00 20.00 .......\ N ._ - ._........... ...... . 16.00 / . ....... . .... . .. ..... . . . ........ ... .. . ........ .... ..... ...... .. . .. .. 12.00 8.00 4.00 r7 0.00 0.1 0.2 0.3 0.3 Hyd bi 1 Hyd bi 5 Hyd bi 9 The Drs) 31 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 14 Combined Post Development Hydrograph type =Combine liirm fregency =10 yrs Inflow hyds. =2, 6, 10 3E Wednesday, Oct 17 2007, 1:36 PM . J Pealdischarge =63.36 cfs The interval =1 min Hydrograph blume *8,018 cult Combined Post Development � ) Hyd. U 14 --10 Y 70.00 ........ . .................. .. . 60.00 ..... ......... _ .. __ ......_ ............. ......... ........ ........... ... ... ... — ......... 50.00 40.00 .......... .... ... ......................... .._.......... _................................. ......_...................................--_.................................................................. - -.................................................---- 30.00 ............. ......... ..... _.... ..... ....... ................ . ....... . ... ....... . . . . . ...... 20.00 10.00 0 00 0.0 0.1 Hyd bl 14 — (Ofs) 70.00 60.00 50.00 40.00 30.00 = d 20.00 10.00 0.00 0.2 0.3 . 0.3 The [ors) Hyd bl 2 Hyd bl 6 Hyd bl 10 33 Hydrograph Plot Hydraflow Hydrographs by Intellsolve I Hyd. No. 15 Combined Post Development Routed Hydrograph type =Combine i Ebrm fregency =10 yrs Inflow hyds. =3, 7, 11 (VS) 3.00 2.00 1.00 Wednesday, Oct 17 2007, 1:36 PM Pealdischarge =2.96 cfs The interval =1 min Combined Post Development Routed Hyd. K15-10K Hydrograph Blume :88,008 cult (Ofs) 3.00 will] 1.00 0.00 " i 1 1 1 1 1 -- 0.00 0.0 0.8 1.7 2.5 3.3 4.2 5.0 5.8 6.7 7.5 8.3 Hyd bi 15 Hyd bi 3 Hyd bi 7 Hyd bill Tine ors) 34 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow interval (cis) Time (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 15.32 1 10 9,194 --- Pre Development 3A 2 Rational 32.48 1 10 19,491 -- Post Development 3A 3 Reservoir 1.60 1 20 19,488 2 25.35 18,425 Post 3A to Basin 3A 5 Rational 9.06 1 10 5,437 -- Pre Development 3B 6 Rational 23.20 1 10 13,918 -- ------ Post Development 313 7 Reservoir 0.94 1 20 13,917 6 22.25 13,059 Post 3B to Basin 3B 9 Rational 12.42 1 10 7,450 Pre Development 3C 10 Rational 30.30 1 10 18,178 - ------ I ---- Post Development 3C 11 Reservoir 1.15 1 20 18,172 10 25.02 17,272 Post 3C to Basin 3C 13 Combine 36.80 1 10 22,081 1, 5, 9, ---- --- Combined Pre Development 14 Combine 85.98 1 10 51,587 2, 6, 10, --- --- Combined Post Development 15 Combine 3.69 1 20 51,577 3, 7, 11, ---- I -- Combined Post Development Routed IP Phase 3 Basins.gpw Return Period: 100 Year , Wednesday, Oct 17 2007, 1:36 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development 3A Hydrograph type = Rational I Storm frequency = 100 yrs Drainage area = 7.170 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 18.00 ! 15.00 12.00 9.00 Am 3.00 I L 0.00 Pre Development 3A Hyd. No. 1 —100 Yr Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 15.32 cfs Time interval = 1 min Runoff coeff. = 0.25 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 9,194 cuft . .. . ..... ............... ........... . ..... . ...... . 11, ... ........... ........ ...... . . ..... . ... ................. ......... ............... . . . ..... . ............... . .............. . .... . . ............... ....... ....... ....... . . .... . . . ...... . . . . . ......... . ... . . . ......... . . ........... Q (cfs) 18.00 15.00 12.00 9.00 3.00 0.00 0.0 0.1 0.2 0.3 0.3 Hyd No. 1 Time (hrs) L 35 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development 3A Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 7.170 ac Intensity = 8.548 in/hr IDF Curve = WILMINGTON-IDF.IDF Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 " 0.0 Hyd No. 2 0.1 Post Development 3A Hyd. No. 2 --100 Yr 0.2 3E ; Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 32.48 cfs Time interval = 1 min Runoff coeff. = 0.53 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 0.3 Hydrograph Volume = 19,491 cult Q (cfs) 35.00 30.00 I ! 25.00 ] 2000.i 15.00 10.00 5.00 '_ 0.00 0.3 Time (hrs) 37 Hydrograph Plot Hydraflow Hydrographs by Inte6solve Hyd. No. 3 IPost 3A to Basin 3A Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 2 Reservoir name = Basin 3A Storage Indication method used Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 A 0 Post 3A to Basin 3A Hyd. No. 3 —100 Yr Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 1.60 cfs Time interval = 1 min Max. Elevation = 25.35 ft Max. Storage = 18,425 cuft Hydrograph Volume = 19,488 cuft Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 11 1 1 1 I 1 1 I I 1 0.00 0.0 0.8 1.7 2.5 3.3 4.2 5.0 5.8 6.7 7.5 8.3 Time (hrs) Hyd No. 3 Hyd No. 2 Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Oct 17 2007, 1:36 PM Pond No. 1 - Basin 3A Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 22.50 5,081 0 0 0.50 23.00 5,536 2,654 2,654 1.50 24.00 6,506 6,021 8,675 2.50 25.00 7,533 7,020 15,695 2.75 25.25 7,791 1,916 17,611 3.25 25.75 8,319 4,027 21,638 3.50 26.00 8,588 2,113 23,751 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 30.00 0.00 0.00 0.00 Crest Len (ft) = 4.00 15.00 0.00 0.00 Span (in) = 30.00 0.00 0.00 0.00 Crest El. (ft) = 25.25 25.75 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 23.35 0.00 0.00 0.00 Weir Type = Riser Rect - Length (ft) = 62.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 0.25 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 orif. Coeff. = 0.60 0.00 0.00 0.00 Multistage = n/a No No No Exfiltratlon = 6.400 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 4.00 3.00 2.00 1.00 0.00 0.00 Note: Culvert/Orifice outflows have been analyzed under inlet and outlet caMMI. Stage / Discharge 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 Total 0 3F Stage (ft) 4.00 f i 3.00 2.00 1.00 1 0.00 18.00 Discharge (cfs) 39 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Pre Development 3B Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 4.240 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 10.00 8.00 Me 4.00 MIX — Hyd No. 5 0.1 Pre Development 3B Hyd. No. 5 —100 Yr 0.2 Wednesday, Oct 17 2007,1:36 PM Peak discharge = 9.06 cfs Time interval = 1 min Runoff coeff. = 0.25 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 0.3 Hydrograph Volume = 5,437 cult Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 0.3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Post Development 3B Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 4.240 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 24.00 16.00 12.00 8.00 4.00 Hyd No. 6 0.1 Post Development 3B Hyd. No. 6 -- 100 Yr 0.2 Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 23.20 cfs Time interval = 1 min Runoff coeff. = 0.64 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 0.3 Hydrograph Volume = 13,918 tuft 0.00 0.3 Time (hrs) 4C, 41 Hydrograph Plot Hydraflow Hydrographs by Intellsolve 1 Hyd. No. 7 Post 313 to Basin 3B Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 6 Reservoir name = Basin 313 Storage Indication method used. Q (cfS) 24.00 20.00 16.00 12.00 8.00 4.00 Wednesday, Oct 17 2007,1:36 PM Peak discharge = 0.94 cfs Time intervai = 1 min Max. Elevation = 22.25 ft Max. Storage = 13,059 cuft Hydrograph Volume = 13,917 cult Post 3B to Basin 3B Hyd. No. 7 — 100 Yr .... .............. ............ . ....... . . ... . . . . . . . . . . . . . . . . .............. ........ ... . . ... . . ............. . .... .. .. . . . . . ........ ... ... .... .. ......... ............... ... - - 1. - . .. ...... ........ .. . .. ... ..... . . .... ... .... . . . . .. - -.-. ... I - - - - - Q (Cfs) 24.00 20.00 16.00 12.00 11.1 full 4.00 0.00 U I I I I I I I I I I 1 0.00 0.0 0.7 1.3 2.0 2.7 3.3 4.0 4.7 5.3 6.0 6.7 — Time (hrs) Hyd No. 7 — Hyd No. 6 Pond Report 4z Hydraflow Hydrographs by Intelisolve Wednesday, Oct 17 2007, 1:36 PM Pond No. 2 - Basin 3B Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 19.80 4,288 0 0 0.20 20.00 4,452 874 874 1.20 21.00 5,300 4,876 5,750 2.20 22.00 6,203 5,751 11,501 2.45 22.25 6,438 1,580 13,081 2.95 22.75 6,921 3,340 16,420 3.20 23.00 7,167 1,761 18,181 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (In) = 30.00 0.00 0.00 0.00 Crest Len (ft) = 4.00 15.00 0.00 0.00 Span (in) = 30.00 0.00 0.00 0.00 Crest El. (ft) = 22.25 22.75 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 18.20 0.00 0.00 0.00 Weir Type = Riser Rect Length (ft) = 101.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 0.25 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multistage = n/a No No No ExIfiItration = 6.340 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: CuNertfOrifice outflows have been analyzed under inlet and outlet control. Stage (ft) 4.00 3.00 2.00 1.00 0.00 - ' 0.00 2.00 Total Q Stage / Discharge 4.00 6.00 8.00 10.00 12.00 14.00 Stage (ft) r 1 4.00 3.00 2.00 1.00 1 0.00 16.00 Discharge (cfs) C 1kM Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 12.42 cfs Time interval = 1 min Runoff coeff. = 0.25 Tc by User = 10.00 min Asc/Rec limb fact = 1 /1 Hydrograph Plot Hydraflow Hydrographs by Irdellsolve Hyd. No. 9 I Pre Development 3C Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 5.810 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF Pre Development 3C Hyd. No. 9 —100 Yr 0.1 0.2 0.3 Hydrograph Volume = 7,450 cub Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0.3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 10 Post Development 3C Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 5.810 ac Intensity = 8.548 in/hr OF Curve = WILMINGTON-IDF.IDF Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 " - 0.0 — Hyd No. 10 0.1 Post Development 3C Hyd. No. 10 --100 Yr 0.2 Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 30.30 cfs Time interval = 1 min Runoff coeff. = 0.61 Tc by User = 10.00 min Asc/Rec limb fact = 1/1 0.3 Hydrograph Volume = 18,178 cult Q (cfs) 35.00 30.00 25.00 20.00 J 15.00 10.00 5.00 '_ 0.00 0.3 Time (hrs) 45 Hydrograph Plot Hydraflow Hydrographs by InWilsolve Hyd. No. 11 Post 3C to Basin 3C Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 10 Reservoir name = Basin 3C Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Post 3C to Basin 3C Hyd. No. 11 —100 Yr Wednesday, Oct 17 2007, 1:38 PM Peak discharge = 1.15 cfs Time interval = 1 min Max. Elevation = 25.02 ft Max. Storage = 17,272 cuff Hydrograph Volume = 18,172 cult Q (cfs) 35.00 30.00 25.00 E 111611] 1516790111 10.00 5.00 0.00 " 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 Time (hrs) — Hyd No. 11 Hyd No. 10 Pond Report 46 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 17 2007, 1:36 PM Pond No. 3 - Basin 3C Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 22.00 4,123 0 0 1.00 23.00 5,152 4,638 4,638 2.00 24.00 6,244 5,698 10,336 3.00 25.00 7,397 6,821 17,156 3.25 25.25 7,691 1,886 19,042 3.75 25.75 8,289 3,995 23,037 4.00 26.00 9,235 2,191 25,228 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 30.00 0.00 0.00 0.00 Crest Len (ft) = 4.00 15.00 0.00 0.00 Span (in) = 30.00 0.00 0.00 0.00 Crest El. (ft) = 25.25 25.75 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 24.88 0.00 0.00 0.00 Weir Type = Riser Rect -- - Length (ft) = 33.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 0.28 0.00 0.00 0.00 N-Value = .009 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi -Stage = n/a No No No Exfiltration = 6.700 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 4.00 3.00 2.00 1.00 Stage / Discharge Note: Cult' Mdfice outflows have been analyzed under inlet and outlet control Stage (ft) 4.00 { j 3.00 2.00 1.00 0.00 1 1 1 1 1 1 1 1 1 1 1 1 1 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intellsolve ( Hyd. No. 13 f Combined Pre Development Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 1, 5, 9 I Q (cfs) 40.00 I 30.00 20.00 1,0.00 Wednesday, Oct 17 2007, 1:3B PM Peak discharge = 36.80 cfs Time interval = 1 min Combined Pre Development Hyd. No. 13 —100 Yr 0.1 0.2 Hyd No. 13 Hyd No. 1 — 0.3 Hyd No. 5 — Hydrograph Volume = 22,081 cult Q (cfs) 40.00 30.00 FM1I7 10.00 `d' 0.00 0.3 Hyd No. 9 Time (hrs) 47 48 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 14 Combined Post Development Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 2, 6, 10 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 85.98 cfs Time interval = 1 min . Hydrograph Volume = 51,587 cult Combined Post Development Hyd. No. 14 -- 100 Yr Q (off) 90.00 80.00 . . ....................... / .... ........... .. . . .. ....... . . . ....... . . ...................... .................... ................ . .......... - . . . . ................ - . --- _. _. _..... ........ ......... ......... ......-................._..._ . 70.00 60.00 50.00 ......... _ . - _._ .....----._ 40.00 30.00 -................................................ ................... .....— ..........................................._ ............--- - - 20.00 10.00 - -- 0.00 0.0 0.1 0.2 0.3 0.3 Time (hrs) Hyd No. 14 Hyd No. 2 Hyd No. 6 Hyd No. 10 49 Hydrograph Plot Hydraflow Hydrographs by Intellsolve Hyd. No. 15 Combined Post Development Routed Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 3, 7, 11 Q (ds) 4.00 3.00 2.00 HU117 Wednesday, Oct 17 2007, 1:36 PM Peak discharge = 3.69 cis Time interval = 1 min Hydrograph Volume = 51,577 cuR Combined Post Development Routed Hyd. No. 15 —100 Yr 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Hyd No. 15 Hyd No. 3 Hyd No. 7 Hyd No. 11 Q (cfs) 4.00 3.00 2.00 1.00 0.00 10.0 Time•(hrs) �I IH RIRL AREA WEIGHTED `C' VALUES The Villages at Turtle Creek Stormwater Management High Density Permit Application Post Development C A 1 Dwelli & Drivewa 0:95 11 0572 Sidewalk . 0.96 18663 Am Street& Gutter 025 6 323 4 Grass .0.28 � 10,093 042 8 7 8 ,Weighted C 0.61 Total Area 37 339 0.86 Im rvlous Area 19246 0.44 Percent Impervious 51.5% DRAINAB AREA CI-47 Post Development C A A ac 1 Dwelling & Driveway 006 3,769 0. 2 Sidewalk .OgS 12840 3 Street & Gutter ii 3,641 0. 4 Grass 21465 O.4s '' 6 7 e Wei kited C 0.45 Total Area 30179 0.89 Im rvious Area 8 895 1 0.20 Percent Impervious 28.8% DRAINABAREA Clda Post Dmolo mend C A M A ac 1 Dwellina & Driveway 095 3.7 009 2 Sidewalk 0:9!5 1036 002 3 Street & Gutter 0.9$ 3,375 0_08 4 Grass 0.25 12,018 0.28 6 7 8 Wei Ided C 1 1 0.53 Total Area 1 20.1661 0.46 ImperviousAma 1 8.1481 0.19 Percent Impervious 40.4% I �7:k11 � 1_1;1_1 Td3 Ec:7 Post Develo merit C A A ae 1 Dwelling &Driv & 155091 036 2 Sidewalk .>' i 933 0.4 . 3 Street & Gutter 6,040 OOL i 4 Grass 1 & 1 6 7 8 Wei Md C a 0.63 Total Area 42,215 0.97 Im ervious Area 23,064 0.53 Percent Impervious 54.6% DRAINABAREA CI-50 Post Development C A A. ac 1 Dwellina & Driveway , * 0.95 0. 2 Sidewalk ` . , 0.95 1,907 ' 0 04...:. 3 Street & Gutter Q95 5731 0,16..: 4 Gress 0,25 3,50 :. Cos.. 5 6 7 8 Weighted C 0.95 Total Area 11 184 0.26 Impervious Area 7638 0.18 Percent Impervious 68.3% SHEET 2 OF 6 DESIGN BY: ECG CHECKED BY: EST QC! A i = 7.2 inthr C = Weighted C A = Total area in acres Q 3.77 QCI A i = 7.2 inthr C = Weighted C A = Total area in acres Q 225 Q CI A i = 7.2 inthr C = Weighted C A = Total area in acres Q CI A 1= 7.2 inlhr C = Weighted C A = Total area in acres Q 4.41 Q Ci A i = 7.2 inthr C = Weighted C A = Total area in acres Q 1.76 SHEET 3 OF a DESIGN BY: ECG DRAINAB AREA Y5 CHECKED BY: EST Post Development C A A ac 1 Dwelling & Driveway 095 IM 2 Sidewalk t1.001 d 3 Street & Gutter 4 Grass 6 d. 7 8 Wei fded C1 1 0.25 Tote! Area Z9 0.67 Ire Mous Aral 0.00 Wrcsntlm Mous 0.0% BASIN 3B DRAINAB AREA CI-51 Post Development C A A ac 1 Dwellina 8 Driveway 2 Sidewalk 3 Street & Gutter 4 Grass 6 Other (Purnp Station 2708 7 8 FV"Whted C 1 0.38 Total Ares 12,111 0.28 Ire .Ana 1 4,484 0.10 Percent Impervious 35.9% DRAINABAREA CIdi2 Post Develo mend C A A ac 1 Dwallina & Driveway 091i 8 39 0.1 2 Sidewalk Ism 3 Street 8 Gutter . 0.... 4.771 : •0. 6 Grass -.1y :: 6 7 8 Wef kited C 0.66 Total Area 16865 0.38 Ire Mous Area 9 850 02S Psrcarrt Impervious 592% DRAINAB AREA CI-63 Post Development C A A (act 1 Dwelin & Driveway = 095 3640 0. 2 Sidewalk 7 3 8freet 8 0ulter 0.95 . 4100 • .1 4 Grew Q25 4 0.1 6 7 8 ei Mad C 1 1 0.73 Total Area 13 M 0.32 Ire Mous Area 8. 549 0.22 ParcsntImpervious 89.1% Post Develo merit C A M A ae 1 Dwallino & Drivmway 3 2 Sidewalk S.. 1. 3 8treat 8 Outlet Sim '. p. 4 Grass 0.1.: 6 7 6 Wai hied C I 1 0.70 Total Area 1 546 0.31 ire Mous Area 8 793 0.26 Wrwndlm Maus 84.9% MCI A i = 7.2 in/hr C = Weighted C A = Total area in acres Q 1.20 10 C1 A I = 7.2In/hr C = Weighted C A = Total area In acres Q Cl A ! = 7.21nthr C = Weighted C Q 1.83 14 Cl A 1= 7.2 Irdhr C = Weighted C A = Total area in acres Q 1.66 MCI A I = 7.2 inlhr C = Weighted C A = Total area In acres Q 1.58 SHEET 4 OF 6 DESIGN BY: ECG DRAINAB AREA CI-N CHECKED BY: EST Post Development C A A ac 1 Dwelling&Drivewa 0195 13770 0.32:' 2 Sidewalk .: 0,195 I 2 261 0.05, 3 Street & Gutter - 0195 5778 0.13:i 4 Grass 7'648 018:4i. 6 B Wei hted C 1 1 0.77 TWaI Area 29,458 0.68 Im ervious Area 21,810 1 0.50 Percent Impervious 74.0% DRAINABAREA CI-56 Post Develo meM C A I A ae 1 Dwelling & Driveway 095 7 14,809 0 2 Sidewalk 0 95 .. 2,292 �..:...... DA5....... 3 Street & Gutter -10.95"', 5 875. ., .4 13 4 Grass 73 835: ' " Tl.31 6 7 8 Wai Mad C 0.69 Total Area 38.6151 0.84 Im rvious AreaI 22 9T7 1 0.53 PorceM Im rvious 62.5% DRAINABAREA CI57 Post Development C A ftz A ac 1 Dwelling & Driveway %05: 7 307 D-V 2 Sidewalk 1462 0.03-- 3 Street & Gutter b106 4 0.1a 4 Grass 0.25 IMS15 0.20 .: 6 7 8 Wei htad C 1 0.61 Total Area 25,5741 0.59 Im rvious Area 1 13.0591 0.30 Percent Impervious 51.1% DRAINABAREA CI58 Post Develcoinent C A A ac 1 Dwelling & Driveway 0.95 ems 01 T _ 1 2 Sidewalk ti�v 1 763 3 Street & Gutter 4,861 4 Grass 6,2155 0. 6 7 8 Wei hied C1 1 0.73 Total Area - 19 837 0.46 limperviousArea 13 582 0.31 10e-ntIrnperyjous 66.5% BASIN 3C 12RAINAB AREA CI59 Post Development C A A ac 1 Dwelling & Driveway k .89:5' 18878- 0_98 2 Sidewalk 0 2,379 0.05 . 3 Street & Gutter :e L25 7 302 C.17 4 Grass ..: • ILR.S. .3341 D.77 6 7 8 _- Wel hted C 1 0.57 F TMaI Area 1-111 1.42 Im ervious Area 1 28,5601 0.66 PerceMImpervious 46.1% MCI A i = 7.2 in/hr C = Weighted C A = Total area in acres 4 3.74 MCI A 1 = 7.2 in8rr C = Weighted C A = Total area in acres Q 4.17 MCI A 1 = 7.2 inthr C = Weighted C A = Total area in acres MCI A 1= 7.2 inlhr C = Weighted C A = Total area in acres O 2.39 MCI A I = 7.2 kVhr C = Weighted C A = Total area in acres 3 5.87 SHEET 5 OF 8 DESIGN BY: ECG DRAINA13AFIFA CF60 CHECKED BY: EST Post Development C A Aso 1 Dwelling & Driveway .95� 3A32 2 Sidewak D.26 854' 02 3 Street & Gutter 0 C. 4 Grass 4ja 0.10 6 _ ;r 7 8 Wei hied C 0.66 Total Area 1. �-855 0.25 Im rvous Ana 6,297 0.14 PerosMImpervious 58.D% DRAMB AREA CI 61 PoWiDmolo ment C A A ae 1 Dwelling &Drivawa .. �. ".ti' 2 Sidewalk 0. .80, 3 Shast & Gutter 0. ' AMW .16 4 Grass 6 7 8 Wei bled C 0.84 TaraI Area 22 - 0.52 Im ousAnu 12 0.2g Percent Impervious 55.4% DRAINABAREA C482 Post Development C A M Aso 1 Dwaigno & Driveway -0ea. ` 14 - --84 2 Sidewak ' 0. 1 0 04 3 Street & Ginter 4 Grass D: 6 7 6 War hied C 1 0.68 Total A►sa 344 0.83 Im rvlous Arms 510 0.52 Poreent Im rvlous 61.8% DRAINABAREA CI-63 Post DrAlo merit C A A so 1 Dwelling&D 17766 •' 2 Sidewalk D . 2171 3 Sheet & Gutter Go &M 4 Gress _ 6 7 8 [Weighted C 1 0.68 Aros AIZ 0.g8 ,=I Im rvlous Am 25,1108 1 0.59 Percent Impervious 80.8% DRAINAB AREA O-64 Post Dwal mark C A A ao 1 Dwellina & Driveway 318110 G&B 2 Sidewalk 0. 1.075 'D 3 Sheet & Gutter 095 3,153 . DAW . 4 Gross 7 8 Wet hted C I 1 0.60 1- Totel Ana 111g52 0.37 Im ousArea "gig 0.% Percent Impervious 49.6% O CI A 1= 7.2 inthr C = Weighted C A = Total area In sass O 1.18 O C1 A 1-7.2Whr C = Weighted C A = Total area In acres @ 2.39 O CI A i - 7.2 iMhr C = Weighted C A=Total area in acres Q 4.11 O Cl A I = 7.2 inlhr C = Weighted C A = Total area in acres O 4.T4 OCI A I=7.2irdhr C = Weighted C A = Total area in aces O 1.58 SHEET 6 OF 6 DESIGN BY: ECG DRAINARAREA CI-6S CHECKED BY: EST Post Development C I A fe A ac 1 Dwelling & Driveway 095 1 73 I.017 2 Sidewalk951;.D102 3 Street & Gutter 0;95 2.936 0:07 4 Gross�.: ...... �.0;25 .......... 01 _. t<ij01 '��.Q;13 7 Wei hied C 1 1 0.71 Total Area 17,0190.39 Im ervlous Area 11,21710.26 PoreentIm ervious 85.9% DRAINAS AREA 1A8 Post Development C A A ac 1 Dwellina &Ddveway 095 0.00.., C 2 Sidewalk - Ja as 0 00 ;:, 3 strew &Gutter 4095: 1991 005 4 Gress 025. 1604 004:.:: 6 _ 7 g Wai hted C 1 1 0.64 Total Arm 3.3921 0.08 Im rvious Area 1 1,9911 0.05 Percent Impervious 55.4% DRAINAB AREA EA Post Development C A A ac 1 Dwellin &Ddv 4. 0.00 2 Sidewalk i'k - Doll 3 Street & Gutter 095 2.038 4 Gress 0.0 6 '. :. 7 ... ... 8 Wei bled C 0.93 Total Area 2,1131 0.05 jimpervious Area 2,0381 0.05 Portent Impervious DRAINAB AREA Will Post Development C A A ac 1 Dwellina & Driveway 11196, 0.00 2 Sidewalk O96 004. 3 Street & Gutter 095,,,. 12 576 0. 4 Grass 2Sr 4049 0111 6 7 6 Wai hted C 1 1 0.76 Total Area 17.226 0.40 Im rvious Area 12,576 1 0.29 Portent Impervious @ CI A I = 7.2 inlhr C = Weighted C A = Total area in acres @ Cl A i = 7.2 infhr C = Weighted C A = Total area in acres @ Ci A i = 7.2 Whr C = Weighted C A = Total area In acres @Ci A 1= 7.2 Whr C = Weighted C A = Total area in acres @ 2.17 RIFF SIZING CALCULATIONS The Villages at Turtle Creek Stormwater Management High Density Permit Application in L Pipe Calculations NOTES: Project. Turtle Creek - Phase 3 Computed By: ECG 1) Design method used is Rational Method 5) Velocity percent (AV) from hydraulic elements table Job #: 041.05.043 Checked By: EST 2) "30denotes. existing structure 6) All pipe shall be HDPE pipe unless otherwise noted Location: Surf City, NC Date: I0/17/2007 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows PIPE SECTION AREA (Acres) INC. TOTAL ARE I I _ RUNOFF TIME OF CONCEN. PIPING INPUT PIPWG DATA INVERT ELEVATION GRAB ELEVATION GRATE4UM TO INVERT To FROM BASIN A TO Me. Ac Total An "C., A x C Ac A x C Ac Year bulk. Qa (CPS) To Inlet (Min) Upper End ) Tbru Pipe Dia. On) Length (Ft) (Min) Mm. 'h" Slope (%) Qf Full (CFS) Vf Full (F/S) %Q (Qa/Qf x100) %'V (VaNf x100) Vactuel (per) Upper End Lower End Upper End ow Upper Lower Ind (Ft) End (Ft) FROM TO C142... CI-43 - - 1.60 .. 1.60 0.52 ': 0.23 0 L 5 10 7.2 5.97 5.00 500 006 13 29 0.009 1.12 9.88 9.06 60 1045 942 25.62 25.30 ..28.31 --- 2931 2 690 3 010 CI42 C143 CI 43 MA O b9 :. ' 2.29 0:59 .: 0 41 1 24 10 72 9.91 5.00 S 06 0 5I 18 193 0.009 0.41 9.76 5.53 01 114 630 2 .... 24:50 28.31 30.10 3010 5 600 C145 113-9 Y1 5 JB 9--. 0.67: 067 0.75 017 017 10 7.2 120 5.00 5 00 0.57 18 171 0.009 & 8.73 7.11 14 71 5.05 26.00 1 24.50 29 25 : 3010 3 23a 5 600 YI-3 I JB-9 J13-9 J1346.. U 01 197 0.50 _ 001 141 10 72 10.14 5.00 557 024 18 109 0.009 0 60 11.2 6.6d 87 113.5 7.53 24.50 23.85 3010 29.05 1 5.600 1 5200 10-9 1 IB-10 JH-10 CI-47.:: ".Ul:. 2.98 0.50 0.01 141 10 72 1018 5.00 Sal 031 18 122 0.009 0.46 19.25 5 81 99 114 6.62 23.85 23:29 29 05,, 27 80 5 200 4 510 TB-10 CI 47 CI-44 Cl46' : 0.11:. n 1.1 0.71 :. o o8 008 10 77 034 5.00 500 029 12 46 0.009 026 2.63 3.34 21 79 2 64 23.74 23.62 2ti J?::. 26.54 2 980 . 2 920 C1-44 CI-46 CI45 046. :. OS9 0.59 0:67 040 040 10 T.2 2.88 5.00 500 0.11 12 i4 0:009 0.53 3.76 4.79 77 110.5 5.29 23.80 23.62 26.54 : 26.54 2 740 2 920 CI 45 CI-46 CI-46--:. I CI-47.:. - - 0.96 .. J .56 0.61 052 too 10 7:21 7.70 5.00 5.29 046 18 134 0.009 0.25 7.54 427 95 114 417 1 23.62 23.29 26.54 . 27.80 2.920 4.510 CI-46 CI-47 0748..CI-47 -- 0-46:::l 0.46 0.53 025 025 10 72 1.79 5.00 500 0.17 15 36 0A09 025 4.69 3.82 38 915 3.57 23.38 23.29 ?7:80 - 2780 4420 4510 CI48 CI-47 C1 47 CI 50 0 69:':: 5.69 0.4;. 031 297 10 7.2 2140 5.00 6.12 034 1 30 133 0.009 025 2952 6.02 73 109 6.56 23t29 22.96 27.90 2635 4.310 +.390 C'I47 CI-50 CI-49 CI-30 [ 097` 0.97 0..61 061 10 7.2 4,41 5.00 5.00 0.07 15 29 0..00.9 010 7.81 6.37 57 1035 6.59 23;16 22.96 26;35 '':: 26.35 3.190 3.390 CI-49 CI-50 50 JBdi 026 .: 6,92 0.05 024 383 10 72 27.57 5.00 645 0.25 30 102 1 0:009 025 29.94 6.08 .97 114 6.93 22;96 .22i70 205 ;; 28.00 3.390 5.300 C -50 TB-11 1 BP 3A.=' OAl. 6.93 b:50 O.OI 3 Si 10 72 27.61 5.00 6.7p 012 30 51 0.009 Q26 30.02 6.12 92 1.14 6.98 22:70- 22:57 28.00 ::: 26.75 5300 4.180 IB-L1 BP 3A BP 3A Bawer 1k : ................ 001;: 6.94 050::: 0.01 3.94 10 7.2 27.65 5.00 612 0.03 30 15 0.009 0.27 30 668 6.25 90 113.5 710 22:54 22:50 2635 : NA 4210 NA BP3A Basin 3A - BP 3A JB 12 0.01 1 6.94 0.50' 0.01 3.84 10 7 ? 27.65 5.00 6 B2 0.15 30 62 0.009 0.26 30.11 6.14 92 1.14 7.00 23.35 23 .19 26:75 ;: 26.75 3.400 3.560 1#P 3A JS-12 ]B-12 Swale3A O.Oi 6.45 0.50 0.01 3.84 10 7.2 27.08 5.00 6.97 018 30 78 0009 027 1 3.0.73 6.26 90 113.5 1 7.11 23.19 22.98 26.75. NA 3.560 NA I I .113-17. 1 Svmle3A! Z:141.05.0001041.05.043 Turtle CreeklDocslDesignlSt0mrwatcxq%aw 3lIP Phase 3 PipeSizes.xls P0 a cu a 'ions ipe NOTES: Design method used is Rational Method 5) Velocity percent (%V) from hydraulic elements table Project: Turtle Creek - Phase 3 Computed By: ECG 1) gn Checked B EST 2) "X" denotes existing structure 6) All pipe shall be HDPE pipe unless otherwise noted Job #: 041.05.043 y' Refer Weighted Runoff Coefficient table for calculation of incremental areas and C values 3 Location: Surf City, NC Date: 10/17/2007 ) Reto 8h 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows TOTAL PEAK PIPING DATA INVERT ELEVATION GRATE/RIM GRATE/RIM TO PIPE SECTION AREA (Acres) INC. AREA T RUNOFF TIME OF CONCEN. PIPING INPUT ELEVATION INVERT SUM M To Upper Qf Full Vf Full %Q (Qa/Qf %V (Va/V Vactual Lower Upper Lower To Inlet ThTu Pipe Dia. In Length t Man. "n" Slc % Upper End Lower End Upper End FROM TO FROM TO Inc. Ac Total Ac "C" A x C Ac A x C Ac Year in/Hr. Qa (CFS) Win) End ) (Min) ( ) gt (F) ( ) (CFS) (F/S) x100) x100) (F/S) End End (Ft) End (Ft) BASIN B Cl-51 CI-52 0.279 0.279 0.38 D.106 0 106 10 7.2 0 763 5.00 500 009 12 25 0.009 1.000 5 143 6 55 15 72 4.72 21.590 21.340 24.03 24.030 2 440 2 690 CI-51 CI-5 CI-52- JB-13 _' 0.38 Q66 0.66 0.25 036 10 12 2.60 5.00 509 035 15 84 0.009 0.261 476 3 88 54 102.5 399 21.34-- - - 21.12 24.03 24 90 2 690 3.750 CI-52 JB-13 JB-13' CI-54 0.01 0,67 0.50 0.01 037 10 72 263 5.00 544 083 15 198 0.009 0.253 469 3 83 56 103.5 3.96 21.12 20.62 24.90 2379 3 780 3 170 TB-13 CI-54 CI 53'' :' CI-54 0.32 0.32 0.73 0.23 0 23 10 72 1.68 5.00 500 0.0..8 12 25 0.009 0 775 453 577 37 93 5.37 20,81 20.62' 23.74 2379 2 980 3.170 CI-53 CI-54 CI-54' " JB-14' ' . 0.31 130 0:70 0.22 0.82 10 7 2 5 8$ 5.00 ti 27 0 17 18 48 0.009 0 252 761 431 77 110.5 476 20.62 _ 20.50 " 23.79 ' ' 2429 3 170 3 794 CI-54 JB-14 JB-14 JB=IS 0.01 1.31 0.50 0.01 0.83 10 7 2 592 5.00 6.44 045 18 128 0.009 0 257 769 433 77 110.5 4.81 20.50 20.17 24.29 ': 24.56 3 790 4.390 1B-14 JB-15 CI-58 CI-57 0.46 0.46 0.73 0.33 0.33 10 72 239 5.00 500 010 15 24.0 0.009 025 4 66 3 B0 51 101 3 84 23 57 23.51 26 26 262ti 2 690 2 750 CI-58 CI-57 CI- 57 JB=1 S 0.59.. 104 0.61 0.36 0.69 10 72 496 5.00 510 019 15 91.8 0.009 1 10 978 799 51 101 S 06 23 5f 22.50 26 26 : 25.51 2.750 3 010 CI-57 TB-18 JB-18 CI:.55 t).Ol 1,05 0.50 : 0.01 0.69 10 72 499 5.00 529 043 15 201.0 0.009 1 01 9 39 7 66 53 102 7 81 22 50 20.46 25.51 23.53 3 010 3 070 TB- 18 CI-55 CT-56.. CI-5S 0.84 0.84 0,69 ' 0.58 0.58 10 72 411 5.00 5.00 009 15 24 0.009 0 286 499 407 84 112.5 457 30 53 20.46 23. 53; 23. 53 3 000 3 070 CI-56 CI-55 CI-55 JB-15 0.68 2 57 0.77 0. 52 1.79 10 7 2 12 91 5.00 5 73 029 24 103 0.009 0 252 16.40 522 79 111.5 5.82 20.46 20.20 23,53 2456 3 070 4,360 CT-55 JB-15 JB-15 JB-16 0.01 ' 3.89 ' 0.50 0.01 2.62 10 7 2 18 86 5.00 6.88 0 08 30 32 0.009 0.250 2959 603 64 106 6.39 20.20 20.12 24.56' 24.61 4 360 4.490 JB-15 JB-16 JB-16 BP 3B 0.01 3.90 0.50 0.01 2.62 10 7 2 18.90 5.00 6 97 0 38 30 133 0.009 0 196 26 21 5 34 72 108 5 5.80 20.12 . 19.86 24.61 23 75 4 490 3 890 TB-16 BP 3B BP 3B Basin 3B 0.01 3.91 0.50 0.01 2.63 10 72 1994 5.00 735 0.09 30 31 0.009 0194 26.08 532 73 109 5.79 19.86 19.80 23.00 NA 314 NA BP 3B Basin 3B BP 3B JB-17 0.01 3.91 0.50 0.01 2.63 ] 0 7 2 15.94 r5.00 00 7 35 0.21 30 101 0.009 0 445 3951 805 48 99 7.97 18.20 17.75 23.00 23. 25 4 800 5 500 BP 3B JB-17 JB-17 Swale 3B 0.01 3.92 0.50 0.01 263 10 72 18 97756 007 30 34 0.009 0 529 43 09 8 78 44 97 8 52 11.35 17.17 .: 23.25 NA 5 900 NA JB-17 Swale Z:\41.05.000\041.05.043 Turtle Creek\Docs\Design\Stormwater\Phase 3\IP Phase 3 Pipe Sizes.xls Pipe Calculations. Project: Turtle Creek - Phase 3 Computed By: ECG 1) Design method used is Rational Method 5) Velocity percent (%V) from hydraulic elements table Job 4: 041.05.043 Checked By: EST 2) "X" denotes existing structure 6) All pipe shall be EDPE pipe unless otherwise noted Location: Surf City, NC Date: 10/17/07 3) Refer to Weighted Runoff Coefficient table for calculation of incremental areas and C values 4) Adjusted C values used to determine equivalent Rational Method peak runoffs for basin outflows PIPE SECTION AREA (Acres) INC. TOTAL AREA SUM p M I PEAK RUNOFF TIME OF CONCEN. PIPING INPUT PIPING DATA INVERT ELEVATION GRATE/RIM ELEVATION GRATE/RIM TO INVERT FROM BASIN C TO Inc. Ac Total Ac "C" A x C Ac A x C Ac Year In/Hr. Qa (CFS) To Inlet (Min) To Upper End End(Ft) Tbru Pipe Pipe Dia. (In) Length Man. "n" Slope (%) QfFull (CFS) Vf Full (F/S) %Q (Qa/Qf x100) %V (Va/Vf x100)/S) Vactual Upper Pp End Lower End Upper End Lower End Upper End (Ft) d ( Lower End (Ft) FROM TO CI-59 . CI-60 1.42 '' 1.42 0.57 0.81 081 10 7.2 5.87 5.00 5.00 0.12 18 34 0.009 0 264 779 4.41 75 110 485 24.97 24.88 29.36 29.36 1.390 4 480 L'I-59 C1-60 CI-60=. CI'-61 0.25 1.67 0.66 016 098 10 7.2 7.04 5.00 5.12 0.16 18 48 0.009 0.252 7.62 431 92 114 4.92 24.78 ' 24.66 29.36 29.36 4.580 4 700 CI-60 CI-61 CI-6 CI-63 0.52 2.19 0.64 ...:1 033 131 10 7.2 943 5.00 5.28 0.64 24 206 0.009 0.252 1 16.39 522 58 103.5 5.40 24,66 24.14 ...: 29.36 28.25 4.700 4.110 1 CI-61 CI-63 CI-62; CI'-63 0.83. 0.83 0.68 I' 0.57 057 10 7.2 4.11 5.00 5.00 009 15 25 0.009 0.286 4.98 4.06 82 112 4.55 24.57 .24.50 2825 28.25 3.680 3.750 CI-62 CI-63 CI-63 JB-20 0.98 4.00 0.68 066 254 10 7.2 18.28 5.00 5.91 0.63 30 242 0.009 0 252 29.71 606 62 105.5 6.39 24.14" 23.53 28.25 31 75 4.110 8 220 CI-63 JB-20 CI-6.4 CI-65 0.37 0.37 0.60 022 0 22 10 T2 158 5.00 5.00 0.11 15 25 0 009 0.285 4.98 4.06 32 89 3.61 24:19- 24.12 N-18 2918 4.990 5.060 CI-64 CI-65 CI 65;'' 38-1.9 0.39 0.76 0.71 0.28 0.50 10 7.2 3.58 5.00 1 511 0.40 15 100 0.009 0.250 4.66 3.80 77 110.5 420 24.12 2187 20.18 30.35. 50 6.480 CI-65 JB-19 ................. 7B-19 ....... JB-20 0.01 .:. 0.77 0.50 '' 001 050 10 T2 3.61 5.00 5.51 0.53 15 135 0 009 0.252 4.68 382 77 110.5 4.22 23.87 23.53 30:35 31.75 6.480 8 220 113-19 JB-20 JB-20. YI-6 0.01 :. 4.78 0.50 001 3.05 10 7.2 21.93 5.00 6.55 0,27 30 109 0 009 0256 29.99 611 73 1 109 6.66 23.53 23 25 ;; : 31,75 29.75 8220 6 500 JB-20 YI-6 YI 6 ; YI-7 0.09 '' 4 $6 0.64 005 3.10 10 7.2 22.31 5.00 6.82 0.17 30 70 0.009 0259 3011 6.14 74 109.5 6.72 23.25' 23.07 29.75 28.25 6.500 5.180 YI-6 YI-7 YI-7 YI-8 0.05 :: 491 0.93 0 04 3.14 10 7.2 22.63 5.00 6.99 0.57 30 228 0.0.09 0.250 29.61 6.03 76 110.5 1 6.67 23.07 22.50 28.25 26.79 5.180 4 290 YI-7 YI 8 YI-8 BP-3C 6.40 5.31 .' 0.76 0.30 3.44 10 7.2 24.80 5.00 756 034 30 138 0.009 025 2981 608 83 112.5ta 22.50 22.15 26.79 28.50 4 290 6.350 YI-8 BP-3C BP-3C' Basin 3C .' 0.01 5.32 0.50 :' 0 01 3.45 10 7.� 24.83 5.00 7.90 0.14 30 58 0.009 0.260 30.19 6.15 82 11222.15 22.00 28 25 22.00 6.100 0.000 BP-3C Basin 3C BP-3C Swale''-3C 0.01 5.32 0.50 0 01 3.45 10 7 2 24.83 5.00 7.90 0 05 30 24 0 009 0.375 36.26 7.39 68 107-524.88'' 24.79 29.25 NA 3 370 NA BP-3C Swale-3C Z:\41.05.000\041.05.043 Turtle Creek\Docs\Design\Stormwater\Phase 3\IP Phase 3 Pipe Sizes.xls CONDUIT OUTLET PROTECTION The Villages at Turtle Creek Stormwater Management High Density Permit Application RIP RAP APRON DESIB SHEET DATE: 0ca1,w17,20W 09:54 AM SHEET 2 OF 8 PROJECT: The Vllaax at Tudb Creek I.D. NO.: Seen 3A ONIM 30' DESIGN BY: ECG PROJECT NO.: 041.05.043 FILE: /NAME? CHECKED BY: EST DESCRIPTION: Conduit Outlet Protection LOCATION: T of Sud City, Pendw County, NC 25 20 Z it 15 O m 10 v 5 0+ 0 Rip Rap Rne Delineation 5 10 15 20 25 DD,Depth of 1bWt.) Noba: 1. Ilea nndhigher zww for gadm M0%. 2 For pipe arch, arch, box atrark paved channel outNls, use ¢Cross sectbral area of auaatBow. Number of Culverts: 1 Design Velocity, Vd : 7.11 tUe Flow, Q : 30.73 ah Pipe Diameter, Da: z5rt. Slope, S.Pnep 0.0077 ftAL Using NCDOT Rip Rep Apron Design: Use: Zone 2 L1: 7.5 ft. L2: 15 fL W: 6.0 fL W: 8.5 tL CLASS'B' RIP RAP USE MINIMUM 18" STONE THICKNESS TOTAL STONE VOLUME= 67.5 ft 191.3 ft3 ■ Design Point *Based upon L, 'Based upon L2 MINIMUM CLASS L1 STONE NCCOT RIP.I OF Coeffident L.1 CoeRdent THICKNESS ZONE RAP CLASS STONE n. 1 'A' FINE 3 4 12 2 'B' LIGHT 3 6 18 3 1 MEDIUM 4 B 24 4 1 HEAVY 4 S 38 5 2 HEAVY 5 10 38 8 2 F:=AVY 5 10 36 7 Dedgn Is Beyandlina Swp, of This Melwd L1-Lenpe. PwbCCuhad L2 =Length b Prava!d $ww Hole NAME NEIGHT SIZE SPECIFICATIONS I LBB RIP -RAP CLASS 5-200 —NO —ORET EIGHATLEAST-1LBS.EACH. NO MORE TWIN 10%51WJ. WEIGH LE55 THAN 15 LBS. EACH CLA882 25250 8C%SHALLVYEIOH AT LEAST eD LBS. EACH. NO MORE THAN 5% SHALL WEIGH LESS THAN 50 LBS. EACH EROSION CONTROL STONE CLASS A 2�' 11M6 TOP S BOTTOM SIZES. NO GRADATION SPECIflED CLASS B 15-SCO 5.15" NO GRADATION BPECIFlEO 0`1 RIP RAP APRON DESIGN SHEET DAF Ootober17.2007 0054AM EC 3 CF a PROOF 1b VkM.11a. Cl.ek I.o. B: fth3B DrIno BT DENY eD PRCB'H_ 041.05.00 IE BME CHBB BY B DBRIPON Conduit Outlet Protection DCADN &M ofefCgr. Pendercourdy,B Rip Rap Zone Delineation 25 20 B � B 15 c ° ■Design Point 10 5 0 0 5 10 15 20 25 Do, Depth of Flow (ft.) t4.■ vls natbytrr.m to e�.d.. wn 2. & PP ■ h. ard% bmmMsr, Pewd dmnml oumb, w D ,Gres doml mn efmaglow. tlnbwofCulverts: , Design blocity, V d : B78 >v Ibw, Q 26AB n. Pipe Diameter, De : 25 2 6pe, s w.F 0,00is Ra. 6ng 6D032ip Rap Apron Design: 1k Ans 2 L,: 7.5 ft. L2: 15 ft. W. 6.0 fL W. 8.5 R CAWRIP RAP IBI 111111 116'te R f I C ® 0=11,IE 67.5 ft2 Based upon L , 191.3 if Based upon L 2 MIW I CI IBM L7 IL'Coeffident - MDO'RIP OF CoefAdlmt pICB ID® RAP CBS , nj 1 1\ B 3 4 72 2 e I0 3 a 18 3 , MBBI 4 a 24 4 1 HEV 4 8 36 6 2 H8Y 5 10 35 a 2 HEW 6 10 3a 7 CnI4B 3u efW Metlwd IL ■VM to Probst Cukat 2 Wo to Pr.—t &,. Hob RNE 1NBBT E MICADB RIP RAP cAa 5-200 3=A■Y13AIM BIRCH. B MOR■MNOWWAM B MN6 BSLrH CAM 25-25D a05AWM3 SMILM D RlA®6 1—HAND BUNCH BO®IP.Of20D2B CiBI 10SP 330DN R O ■4DAD6& CiB I 111141W RIP RAP APRON DESIGN SHEET DATE: Ombar17,2007 09.55 AM SHEET 4 OF 6 PROJECT: The V*agea at Turtle Croak I.D. NO.: B.dn 39 O■lm 30' DESIGN BY: ECG PROJECTNO.: 041.05.043 FILE: *NAME? CHECKED BY: EST DESCRIPTION: Conduit Outlet Protection LOCATION: Town M Surf City, Panda Co". NC Rip Rap Zone Delineation 25- 'N I 20 E F Z N 7 15 � N 5 ■Design Point O 10 J■ � O E 5 1 0 E i k 0 5 10 15 20 25 Do, Depth of Flow (ft.) Nobs: 1. Uae rR AW*.r— brgradaa>10%. 2 For pip. arch, arch, be eulwrk Paved dlennal outlefa. w o-Croaa aec6enal Sa a of.ullat*ow. Number of Culverts: 1 Design Velocity, Vd : s.52 RA Flow, Q : 43.0g da elpe Diameter, De : 25 R Slope, s,Palr 1.000 *A Using NCDOT Rip Rap Apron Design: Use: Zone 2 LI: 7.5 ft. L2: 15 ft. W. 6.0 fl. W. 8.5 ft CLASS 'B' RIP RAP USE MINIMUM W STONE THICKNESS TOTAL STONE VOLUME= 67.5 fe `Based upon L1 191.3 ft3 *Based upon L2 MINIMUM CLASS L1 STONE NCDOT RIP OF Coelfldeln L1100etfideM THICKNESS ZONE RAP CLASS STONE B. a. In. 1 'A' FINE 3 4 12 2 'B' LIGHT 3 e 16 3 1 MEDIUM 4 e 24 4 1 HEAVY 4 6 35 5 2 HEAVY 5 10 36 S 2 HEAVY 5 10 36 7 1 S_P, o1This MWt d L1 =Length b Probd Cui.ert L2 =Legth to Prevent S.. W. NAME HEIGHT SIZE SPECIFICATIONS LBS RIP -RAP C:ASS1 5100 r30% SHALL WEIGH AT LEAST SO LBS. EACH. NO MORE THAN 10%SHALL WEIGH LESS THAN 15 LBS. EACH 0%SHALL WEIGH AT LEAST 60 LOS. EACH. CLASS 2 25-SD NO MORETHAN6% SHALL WEIGH LESS THAN 50 LB6. EACH EROSION CANTROL STONE CLASS A 28' 10%TOP S BOTTOM SIZES. NO GRADATION SPECIFIED CAS B 153p 5-15" NO GRADATION SPECIFIED RIP RAP APRON DESIGN SHEET DAE Ocbbar17,20D7 01:58 PM BE a OF e PROBE W.V. aatMb Crank I.D.B.: S.W. 3000. 30' DBLY Be PROA.: 041.05.00 R RM! CHBBBY E DBRIPLRI Conduit Outlet Protection DCADN Pan dBlCiy, Panda Caurdy.0 Rip Rap Zone Delineation 25 20 p !1 15 c � ■Design Point 10 �a ■ 5 9 0 0 5 10 15 Do, Depth of Flow (1t.) Mac 1.Ienakldg.arambr gnat. W % 2. fir pipe ardL arch, b=l-i%pmad dwnml outlet, was D ae-9abanal area could ow. tbber of Culverts: 1 Design blodty, V d : Be9 tee 15vy. Q 0.00 db Pipe Diameter, Da : 23 R ape, 3 '_F 30.19509.i king ODORip Rap Apron Design: bb: Ens 3 L1: 7.5 R L2: 15 R W. 6.0 ft. W. 8.5 /< CAW RIP RAP ININY 16'9sIIC® D1i1®®11E 87.5 fe Based upon L 1 191.3 ft Based upon L 2 MIIIW CtIiS G N NOORIP OF CoelBdaid L,r Coetllder! NICB ON RAP ces BB m 1 A' IB 3 4 12 2 @ U31' 3 8 18 3 1 MBIY 4 e 29 4 s 1 2 HLV a HRv I 5 8 36 e 2 Hay ' 5 1D 1D 36 3e 7 Design Is Swandihs ffsps ass whod Lbn98r 1s p—Cukad p. .. Is Pnvad... ME Y0®7 Z BE B811CA1D6 RIP -RAP cu SMI 30IMMAIKIIIIIIINGH. B MORBNROBIOUM B B BBN:H cm25 50 BORAMAIM BELCH. B MORNYMS DA®B BARD BEECH EO®ICONOY)B CB81 19'BP NORM E R aADADRBIRi RIP RAP APRON DESIGN SHEET DAE October 17.2DO7 09:55 AM at 6 OF 6 PROMT ie Llaaa aterd. Creak I.D. Q.: Basin 3C Dame Xr D69Y BE PROM, 041.05.043 IE 3C OMI- CHEN BY a DBRIPIDN Conduit Outlet Protection DCAIDN an of of Cdy. Pander C—ty,M `ki 20 a 15 O 10 9 5 0 Rip Rap Zone Delineation 0 5 10 15 20 25 Do, Depth of Flow (ft.) Mee: 1. Yb raryhielwr anePor padaaO96 2 5r p'.pe .h. arch. b Wt � drn-I aalkde, �m D eCrose adorrai era of outlet Bow. Unber of Culverts: 1 Design Mocity, V d : 7.95 fLe raw, a 36.28 era Pipe Diameter, De : 25 ft®pe,s Wro 0.0037 WL Wrg 0D07Rip Rap Apron Desigrc kb: Eno 2 L7: 7.5 ft. L2: 15 ft. W: 6.0 ft. W. 8.5 ft. CLS r RI P RAP 111I1f1111M 18IDMICS VAI®®OIE 67.5 ■ Design Point ft3 Based upon L 1 191.3 ft3 Based upon L 2 Miff" Cis L1 ®9 MDORIP OF CoefAcieM L, Coef icimt IRIC9 M RAP Cis N m. 1 A' M 3 4 12 2 w I67 3 8 18 3 1 MBIM 4 e 24 4 1 Hay 4 B 36 5 2 HEy 5 10 35 6 2 Hey 5 10 38 7 Ded neBa andfie Bo eof Ee MaAod L brger b Probct C t rt brgN b P—Ma— Hola IIME WS7 68MME RIP -RAP Cas 5-21I0 3DIMAINIBAIM BeaCH. a MORNMO'1AWM 8 AN5 BSeCH Cab M-250 OMAMBAMMB1iCH. i MORalAIL3 VJM a f3Aa0 BSSCH BO®I�OiOIDB MO'Dh1 i CEM 8 RA B BADADMBiIB CaS3 iS.iW 75' 9 M811a DRAINAGE AREA MAPS The Villages at Turtle Creek Stormwater Management High Density Permit Application I