Loading...
HomeMy WebLinkAbout20220193 Ver 1_More Info Requested_202203181 Anderson, Mitchell L From:Anderson, Mitchell L Sent:Friday, March 18, 2022 10:19 AM To:tommy@foothillsdock.com Cc:rflormann@comcast.net; Brandee.C.Boggs@usace.army.mil; Brennan, Cayce Subject:DWR 22-0193 Flormann Shoreline_ Request for Additional Information Hello Mr. Fraley,    Thank you for taking my call to discuss this project.      On March 02, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water Quality  Certification from the Division for the subject project. The Division has determined that your application is incomplete  and cannot be processed. The application is on‐hold until all of the following information is received:      1. Plans received with the subject application indicate proposed riprap stabilization will extend 4 feet below  and 4 feet above the ordinary high water mark. Work of this nature is typically covered by Regional General  Permit 30 issued by the USACE and written confirmation for coverage under General Water Quality  Certification No. 4502 by the Division of Water Resources. The proposed stabilization may exceed the  permitted limits detailed in RGP 30.  Please provide revised plans that comply with the permit conditions of  RGP 30 or provide confirmation of coverage from the United States Army Corp of Engineers. [NCAC 02H  .0502(c)], [15A NCAC 02H .0502(a)(9)]    2. The photograph of the shoreline provided with the shoreline stabilization application does not indicate  active shoreline erosion. Please provide a photograph of the areas subject to erosion. Please note, material  placed for shoreline stabilization should only be placed where shoreline is actively eroding and should be the  minimum needed for erosion protection. [NCAC 02H .0502(c)], [15A NCAC 02H .0502(a)(9)]      Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the  proper consideration of the application.  Please respond in writing within 30 calendar days. If all of the requested  information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the  application and it will be denied as incomplete.  The denial of this project will necessitate reapplication to the Division  for approval, including a complete application package and the appropriate fee. Please be aware that you have no  authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the  state may be a violation of North Carolina General Statutes and Administrative Code.     2 3   Below is the contact information for Brandee Boggs with the United States Army Corp of Engineers:  Brandee Boggs brandee.c.boggs@usace.army.mil 828.271.7980, ext.4224    Below are links to the documents referenced above:    Regional General Permit 30:  https://saw‐reg.usace.army.mil/RGPs2022/RGP_30.pdf     General Water Quality Certification No.  4502:  https://edocs.deq.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2152989    Feel free to contact me if you have any questions.      Mitchell Anderson Environmental Specialist – Asheville Regional Office 4 Water Quality Regional Operations Section NCDEQ – Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 828-296-4662 office mitchell.anderson@ncdenr.gov     Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties