Loading...
HomeMy WebLinkAboutNCC210832_Annual Fee Unpaid Email with NOD_20220316Selkane, Aziza From: laserfiche@ncdenr.gov Sent: Wednesday, March 16, 2022 6:17 AM To: fconnor@pgrenewables.com Cc: Selkane, Aziza; Georgoulias, Bethany; fconnor@pgrenewables.com Subject: Notice of Deficiency: Unpaid Permit Fee for NCC210832 Attachments: Notice of Deficiency.pdf This email is to convey a Notice of Deficiency for failure to pay the 2022 annual permit fee per the requirements of NC General Statute 143-215.31)(a)(4). Please be sure to coordinate payment with other parties copied on this e-mail to avoid duplicate payments. Your Certificate of Coverage (COC) under the Construction Stormwater NPDES General Permit was not renewed because the annual fee payment (Invoice No. NCC210832-2022) was not received. The payment is 15 day(s) overdue. A Notice of Deficiency is attached. Please contact the Stormwater Program Billing Specialist for more information at aziza.selkane@ncdenr.gov or (919) 707-3710. Please reference: COC no. NCC210832 This COC is for Pelham Substation in Caswell County, issued to Pine Gate EPC, LLC. Annual fee payment can be made through this website: https:Hdeq.nc.gov/sw-epayments If this project has been closed -out, it is important that you submit a Notice of Termination request here: https:Hedocs.deq.nc.gov/Fonns/NCGO 1-Termination Please visit https://deq.nc.gov/NCGO1 for more information about this permit. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfzche. Please do not respond to this email address, as responses are not monitored.