Loading...
HomeMy WebLinkAboutNCS000598_2021 DMR_20220119Augas an Air Uquide company January 13, 2022 DEQ Winston-Salem Regional Office Attention: DEMLR Stormwater Program 450 West Hanes Mill Road Suite 300 Winston-Salem, NC 27105 Subject: Stormwater Permit Data Monitoring Report (DMR) for Period 2 in 2021 NPDES Stormwater Permit No. NCS000598 Airgas USA, LLC — Mebane Facility Mebane, Alamance County, North Carolina To Whom It May Concern: Airgas USA, LLC — Mebane Facility is submitting the enclosed Stormwater Discharge Outfall (SDO) Monitoring Report as required in the National Pollutant Discharge Elimination System (NPDES) Permit No. NCS000598. In accordance with the monitoring schedule in the NPDES Permit, the stormwater discharge monitoring at Outfall 001 is required twice a year: Period 1 from January through June and Period 2 from July through December. This report is for Period 2 in 2021. In accordance with the facility design, industrial stormwater runoff from the facility is first collected in the onsite wet pond and then discharged through the wet pond outlet/effluent pipe (Outfall 001). The stormwater discharge sampling location is Outfall 001 and the sampling occurs when there is a discharge flow at Outfall 001 during the monitoring period. Due to the design of the wet pond, the stormwater discharge occurs at Outfall 001 when the water level in the wet pond reaches the drawdown orifice of the riser structure. This drawdown orifice is approximatelyl0 feet above the bottom of the wet pond. Thus, the stormwater discharge at Outfall 001 occurs if and when there is a significant rainfall and does not occur automatically nor immediately when it rains. As shown in the enclosed SDO Monitoring Report, the required stormwater discharge monitoring could not be conducted. The water level in the wet pond has not reached the drawdown orifice of the riser structure during the monitoring period and there was no measurable flow at Outfall 001. When there is a significant rainfall, there can be a discharge flow from the wet pond as designed and the required stormwater discharge monitoring can occur. It is noted that in accordance with a visual inspection of the wet pond conducted in December 12, 2021, the riser structure reportedly leaks and Airgas plans to further investigate the leaking riser structure and correct the leakage issue. If you have any questions, please contact me at (919) 304-1010 or at rodne .st.'ohn air as.com. cc: File Enclosures: As Noted STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT FOR PERIOD 2 IN 2021 co L(i O 0 M U Z a zz *-u 04_04 a U 113 U- U C �4 (d MZ jazz C co .M L z zQa FBI ^ Q W W 40 44 N II 0 0 v 'o 0 0 0 w U 65 C a� CO ca o. PC a L a tw C..C•y� bL - �' ayi 6� av C �i b y CC rr Chi Ln y A a o c�U3 d 0 R it Z O C Z o y�► O �•� a> F, a d � p d o y •d � ,� PC Cd w y yu AEW AFW a O H