Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2022-03171_Well Construction - GW1_20220307
WELL CONSTRUCTION RECORD (GW-I) For Internal Use Only: 1-Well Contractor Information: 1 14:.WATER ZONES WellContrac rNaamme I FROM TO `DESCRIPTION �� ft. I . ft ft. NC Well Contractor Certification Number 15:OUTER:CASIN(r,(foc malti=rased wells)OR L3NER Morgan Well &Pump, Inc. : FROM TO DIAMETER THICIGIESS MATERIAL Company Name +1 ft. ft. 6 1181 ( in• sdr21 pvc n 16:TNNDRC GORTUBIIVG:' eottiermal'clo'sed lode 2.Well Construction Permit#: A/ FROM TO DIAMETER THICKNESS 939 MATERIAL List all applicable well construction perm is(n.e.MC,Counv,state,Variance,etc.)• ft ft. in. 3.Well Use(check well use): fL fr. in. VAgricullural upply Well: 17.SCREEN'.:.:.: FROM TO DIAMETER SLOT SrZE THICKNESS MATERIAL . [JMunicipal/Public ft. ft. in. rmal(Heating/Cooling Supply) Residential Water Supply(single) ft. ft inial/Commercial Residential Water Supply(shaz'ed) F..,...,,._ .:. •..:.::. GROUT-.'-.".:, .. :,...,: E hri atiOn FROM TO E IEMPL4CEMENTMETHOD&AMOUNT Non-Water Supply Well: o ft. 20 ft bentonite poured Monitoring Recovery ft. ft. Injection Well: _J Aquifer Recharge Groundwater Remediation Aquifer Storage and Recovery Salmi Barrer 19•SAND/GRAVEL PACK tf a "livable ":.:_:_ ;:-':,'.. _•".r-:': =• :.` �' i FROM TO I MATERIAL I EMPLACEMENT METHOD Aquifer Test 0stormwater'Drainage ft. ft I_J'Geothermal Experimental Technology Subsidence Control ft ft. Geothermal(Closed Loop) Tracer :20.DRU-IMiG.LOG'(attiEY dditidn'slsbeetsifrieees's•-)'t (Heating/Cooling Return) i Other(explain under#21 Remarks) FROM TO DESCRIPTION(color,hardness,soiUrock type :rain size,etc-) ' 4.Date Well(s)CompletedlV- Well ID# g . ft Sa.Well Location: ��( ft ft. L,� trig.. •lL1�2 nt,M K ft ft `[`C Facility/ caner Name Facility ED#(if applicable) ft. ft BIZ_ ft. ft P ical Address,City,and Zip ft. ft 21]MMIARKg County Parcel Identification No.(PIN) s:tiw'�':v 1lisn7 Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one lat/long is sufficient) Q' ' n 22.Certification: �S.Slbq N U . ! is D W /J 6.Is(are)the wells) Permanent or 3 Temporary Si, a fCertified Well Contractor Date 1t� B erring this form,I hereby certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: ©Yes or SNo with 15A NCAC 01C.0100 or 15A NCAC 01C.0100 Well Construction Standmds and that a Ifthis is a repair,fill out known well construction information and explain the nature ofthe copy ofthis record has been provided to the,,ell owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to;provide additional well site details or well construction,only 1 GWA is needed. Indicate TOTAL NUMBER bf wells construction details. You may also attach additional pages if necessary. drilled: % SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: For mul (ft) 24a. For All Wells: Submit this fotm within 30 days of completion of well multiple'wells list all depths if different(example-3 tr 00'mid 2QI00� construction to the following: 10.Static water level below top of casing: LA S (ft-) Division of Water Resources Information Processing Unit;If water level is above casing,use e 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 (in.) 24b.For Iniection Wells: In addition)to sending the form to the address in 24a 12.Well construction method: ro �(A above,also submit one copy of this form within 30 days of completion of well (Le.auger,rotary,cable,direct push,etc.) construction to the following: j Division of Water Resources,Underground Injection Control Program, EDisinfection UPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 Method of test: air pressure 24c.For Water Sunuly&Iniection Wells: In addition to sending the form to the address(es) 'above, also submit one copy of this form within 30 days of typ • Y Amount: a completion of well'construction to the county health department of the county where constructed Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016 'r .