Loading...
HomeMy WebLinkAboutNCC193297_NOT Closeout Documents_20220304PROJECT Briar Chapel — Granite Mill Blvd Forcemain CHATHAM CHATHAM COUNTY NORTH CAROLINA PERMIT # 2019-09078 NCG01 COC # NCC2193297 INSPECTION 1/15/21 CERTIFICATE OF DATE COMPLETION Chatham County Watershed Protection INSPECTOR Drew Blake Department THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a Chatham County erosion control inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and the Chatham County Soil Erosion and Sedimentation Control Ordinance. Inspection Comments All temporary erosion control measures have been removed and permanent ground cover sufficient to restrain erosion has been established. ® Chatham County Land Disturbing Permit(s) Closed The referenced permit(s) have been closed. ® NCDEQ DEMLR Self -Inspections Erosion and sediment control self -inspections may cease for the above -referenced project. ® File an e-NOT (electronic Notice of Termination) with NCDEQ DEMLR Proceed to deq.nc.gov/NCG01 and file an e-NOT. Filing the e-NOT releases the Financially Responsible Party from coverage and requirements of the NPDES General Stormwater Permit for Construction Activities (NCG01). An e-NOT should only be filed if no more land disturbance will occur by the Financially Responsible Party in the common plan of development (if all phases covered under 1 Certificate of Coverage from NCDEQ DEMLR) or select phases on this permit were permitted separate from future land -disturbing activities within the common plan of development and this land disturbance is completed (example: Certificate of Coverage from NCDEQ DEMLR was phase -specific instead of covering all development activities) . Erosion Control Final Inspections Form Bev 26, Oct 2020 Page 1 of 1