Loading...
HomeMy WebLinkAboutGW1-2022-02991_Well Construction - GW1_20220302 t.ilirlI Usti WELL CONSTRUCTION RECORD(M-1) For bftmid Use Only: 1. R Contractor Information: 1-L 9VATER ZONES Tel!Conic*rName FROM I TO DISCRIIION IUPt' log ft. we Well ,C/oatrmEerCcdSe�im�— 'GM aril� l/ y F�� � j/✓ ��( �s 1� ' (/ FROM TO DUMB= TEIICffiyV�B98 Ln tt. s. in. CompaiiyNama N o 0�C v� 16.]NNERCASINGORTUBING Aned4owl 2.WeR Construction Pea'mit#: FROM To DIAM UM TMCKNM I MATERIAL list all appficabla well COMIMCdon par ts(Le.19C,County,State Itarlmrce,etc.) & tt. is 3.Well Use(ehwkwell use): fit. B. in. 1`�Irrlzfttion ater Supply Well: .17 SCRMN FROM TO DrAM1MM RM MAIRMAL Agricultural 13M�_�_., aMblio O ft. fa (3eottertnd(Heating/Cooling Supply) DRd Midentiai Water Supply(single) ndustrlallCommerciei Residential Water Supply(shared) 1�tRIODT FROM I TO 1 EMPLACEM ff OD&AMQUNr Non-Water Supply Well: 0 60 Q R- Moni tg ft. t} bdection Wen: ft. ft. Aquifer Recharge [3GmundweterRa a ietioa uifer St 1S►.SANDI�VBL PA k - JAquifer Aq orage and Recovery 133adurityBanicf tutoat To MATMUAi hnt�tA NEW oD Test OStomtwaterDrainage - Experimental Technology D ttbsidence CoMml & ft Geothermal(Closed Loop) Tracer 2LDRMU M LOG:attaehadditionishe:isR Geothe»ai Coolin Retnm Other lain under#21 Remarks) FROM TO DESCWnON dolor bmda soh kv& M M 4.Date Wells)Completed: _9 Jam'• • WeRM# M so.Wen Location. R' 6 & % Fac' 1/O�wneDrI3ame Faci*M#(ifapplimble) R 0 2 �• tt. .._._._ . . PhysicalAddrew Ci mrdti n �. W.W. P I 10'it �✓!n z1.RFdam Co ntY Pmrd IdentificatianNo.(MQ t 64!7'W fib.Latitude and longitude in degrwdininuteslseconds or decimal degrees: (ifweU field,one latlllongis sa icient) 22,Certification: rot"N �1 U4_IU�, w 7 6.Is(are)the well(s) ermanent or 13Temporary Signature of Certified Well Contractor Data Lay Soft thts farm,I hereby CM&that the weW(S)was(were)CMMCW In accordmnre 7.Is this a repair to an eaisftg weR: �er EPTp ivUh ISANCAC 02C A100 orISANCAC 02C.0200 Well Con uctio:Standards and that a lfthls Isarepatr fill outAnown well conmuaion Inform don and explafn the nanueofthe copy ofthls record has been providod to die well onmer. repatrunder#21 rer»arlasedlon oran the backefft farm. 23.Site dinglmmoraddidonai well details 8.For GeoprobeMPT or(3osed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only I GW-1 is needed. Indicate TOTAL NUM ER of wens eonstmetion details. may also attach add'itionat pages if necessary. drilled-_ t 9.Total well depth below lend aunt ace: 7) 0L) 24a.For Alt Webs: Submit this form within 30 For muldple wells Ust all depths if dl&rm(emwle- Q200'and 2@)1005 cone action to the following � �of completion of well 10.Static water tent below top of easing: 4 (ft.) Division of Water Re`souroea,Inforntatioa Processing IInit, ljwater level is above oosir:g use^+" 1617 M"Service Center,Raleigh,NC 2,7699-1617 11.Borehole dh�ter. / (ln.) 24b.For ecdon W-Ost In addition to sending the form to the address in 24a �� above,also submit one copy of this form within 30 days of completion of well It Well ennstraction method: construction to Ste following (Le ago rotary,cable directpask eta.) DIvIslon of WeterBesom ,Undwground]Wecttoa C= of Program, FOR WATER SUPPLY WMB ONLY 169Mail ser&CeniW,IW@I 6,NC2769NI06 : 13a.Yield%pm) Method of task 24e.Fbr Wa w Sugfy&—lee'rean Welts: in addition to sending the form to 1 the address(es) above also submit one copy of this form worm 30 days of 13b.Disinfeetton type: -1 I� Amount:_1� d�,IrZ completion of MR mnstrut fli to the comfy health depa Covent of the conmy whefe constrahted. FormGW-i NorthCarW=Dep wztaMvlroamaatdQuality-Din WonofWawRaw= RwAsed2,22-2016