Loading...
HomeMy WebLinkAboutNCC220944_ESC Approval Submitted_20220307Barry Fay From: Auto_Sender@Accela.com To: mmacon@mstarproperties.com Subject: Plan Review Completed - Plans Approved for LDUTOD-2020-00064 "Please be advised that Foster Apartments, LDUTOD-2020-00064 has been reviewed and approved by the City of Charlotte. To obtain the approved plans, please visit Accela Citizen Access (https://aca-prod.accela.com/CHARLOTTE) and enter LDUTOD-2020-00064 in the Search box. Approved plans are available for download in the ""Attachments"" section of record LDUTOD-2020-00064. Please do not reply to this e-mail as it is auto -generated and will not be answered. If you have any questions please contact Land Development customer service at 704-336-6692." �! CHAT .III FINAL APPROVAL 7/14/2021 E I'I. PROJECT NUMBER: LDUTOD-2020-00064 ENGINEERING PCSO / DETENTION / DRAINAGE PLAN EROSION CONTROL URBAN FORESTRY TREE ORDINANCE CDOT PLANNING UMUDD / MUDD / PED / TOD NOTE: THIS PLAN APPROVAL DOES NOT INCLUDE CHARLOTTE WATER. FOR MORE INFORMATION, PLEASE CALL 704-336-5499 OR VISIT http://charlottewater.org NOTE: THIS PLAN APPROVAL DOES NOT INCLUDE COMMERCIAL ZONING. ALL BUILDING PERMITS AND ZONING APPROVALS CAN BE OBTAINED AT MECKLENBURG COUNTY CODE ENFORCEMENT. PLEASE CALL CTAC AT 704-314-CODE(2633) FOR MORE INFORMATION. NOTE: SCHEDULE PRE -CONSTRUCTION MEETING AT LEAST 48 HRS. PRIOR TO ANY LAND DISTURBING ACTIVITY USING THE ONLINE FORM FOUND AT http://charlottenc.gov/ld Keith Schell Justin Klein Craig Robinson Kevin Parker N/A CONTACTS • iv KIMBARK, LLC 417 E BLVD STE 205 CHARLOTTE, NC 28203 DEVELOPER MSC PROPERTIES LLC 725 PARK CENTER DRIVE MATTHEWS, NC 28105 704-814-7536 ATTN: MARSHALL MACON MMACON@MSTARPROPERTIES.COM CIVIL ENGINEER: BARRY M. FAY, PE AMERICAN ENGINEERING ASSOCIATES - SOUTHEAST, PA 8008 CORPORATE DRIVE SUITE 110 CHARLOTTE, NC 28226 704-375-2438 bfay@american-ea.com SURVFYOR- ANDREW B. BAKER R.B. PHARR & ASSOCIATES, P.A. 420 HAWTHORNE LANE CHARLOTTE, NC 28204 704-376-2186 abaker@rbpharr.com 9 ES Q hz1EA9jRfi7414 is 201 FOSTER AVENUE CHARLOTTE, NC 28217 PARCEL I D 147021211 14702122 Zoning: TOD-uc �o G,y 49 INTERSTATE 77 odSti YQ 2� SITE �4:9, f� New Bern C�d�t Station on Ra LOCATION MAP Not to Scale INDEX OF DRAWINGS COVER SHEET EXISTING CONDITIONS AND DEMOLITION PLAN CITE ICI A AI J I 1 L 1 Lri l l SIGHT DISTANCE PROFILE EROSION AND SEDIMENT CONTROL PH1 EROSION AND SEDIMENT CONTROL PH2 EROSION AND SEDIMENT CONTROL DETAILS GRADING PLAN DRAINAGE AREA MAP — CROSS SECTIONS STORM DRAIN PROFILES STORM DRAIN DETAILS - UTILITY PLAN UTILITY DETAILS LANDSCAPE PLAN LANDSCAPE NOTES & DETAILS SITE DETAILS SITE DETAILS SITE DETAILS NCG01- GROUND STABILIZATION NCG01- SELF INSPECTION NOTE: DRAWING NO. ORIGINAL DATE 1.) CONTRACTOR TO MAINTAIN RECORD DRAWINGS OF ALL CHANGES THROUGHOUT CONSTRUCTION. AFTER PROJECT COMPLETION THESE DRAWINGS SHALL BE TURNED OVER TO THE OWNER'S REPRESENTATIVE. C1.0 C2.0 C3.0 C3.1 XEI C4.1 C4.2 C5.0 C5.1 C5.2 C5.3 C5.4 owl C6.1 C7.0 C7.1 C8.0 C8.1 6/10/21 6/10/21 6/10/21 4/5/21 4/5/21 4/5/21 4/5/21 6/10/21 4/5/21 4/5/21 6/10/21 4/5/21 6/10/21 6/10/21 6/10/21 4/5/21 4/5/21 4/5/21 4/5/21 ..�� IL - q% s 33046 ) 1V T WCIO O ai N CO V^^V L) 4-) ICI �1 0 rrO F+I � •--1 0 CQ 0 \�^ �W L) V1 �TO 1� MODIFICATION LOG JOB NUMBER: C200023 CHECKED BY: BMF DRAWN BY: BHE DATE: 11-24-20 �99S_o # w�11=1 Z a 00 a N a�� N CV) W U) LV ._ .01 �L Qo �L QWN V N C 4; N w oz .2 U 0 (D00= E �p L QaoU COVER SHEET *** 3 Days Before Digging *** North Carolina 811 811 or1-800-632-4949 Remote Ticket Entry http://nc811.org/remoteticketenhy.htm SHEET: ciao ■ CHAI ►III FINAL APPROVAL 77T472021 INV-708 44 PROJECT NUMBER: LDUTOD-2020-00064 ENGINEERING PCSO DETENTION/ DRAINAGE PLAN EROSION CONTROL U BAN FORESTRY - TREE RDINANCE OT C PLANNING UMUD / MUDD / PED / TOD NOTE: HIS PLAN APPROVAL DOES NOT INCLU E CHARLOTTE WATER. FOR MORE INFO ATION, PLEASE CALL 7047336= VISIT tj�p:L/chaNsettewat org'`', NOTE: Fd" SLAW APPROVAL DO SI DT - SS INCLU E COMMERCIAL ZONING.WALL B1JItWNG PERMITS AND ZONING APPROVALS CABE 0BTAINrV AT-14ECK-L-EIN C(1l ��TnpE _ ENFORCEMENT. PLEASE CALL CT AT 704-314-CODE(2633) FOR MORE I FORMATION. NOTE: HEDULE PRE -CONSTRUCTION EETI AT LE T HRS. PRIOR TO ANY AND DISTU BIN IVITY USING THE 0NLINE, FORM OUND A `http://charlotten .govAd Keith Schell \ \ Justin KLein R/W rniiv ROf�i sOn -B - -G S 6 WM INSIDE SMH i / -❑E--❑E-` ,DE -G -G 38' DEEP FOSTER AVENUE R/W 50' PUBLIC R/W o R/W - - R/W - - SIC, E, \o . fin Parker"", 24� I/alley Curb -- �D ,Kb 5 9 --❑E- P' , o¢" V Ifey Al IN�-7 =706.47 706.23 ❑E - - OE N/ of /;�SMH L RIM=�08.87 -A n G 709. 9\ 3 SSMH v 2 4 OUT 701.78 ale Curb � N 7 2 o T 34 \ a BORE HOLE M I N 0 8 2 ❑E OE_-0 W-1 W-- ,Y®ungblood St. i Concrete z6- i6 Metal Drum 6- 6 a 34.6' FFE-707.67 \ HE\T-2 9 \ \ curb Ile 2 ❑ // \ �\ RE sV / \ ARE / a� \� TEMPORARY CONSTRUCTION x ENTRANCE ( P.) Party Well Agreement - D.B. 5596, PG. 963 \ / FEE- 715.91 E3 1-Story Metal l #211, 215 DISTURBED AREA: 1.00 ACRE -Story / � -stoBack . , Fred S. Gutuick t ; / TS Newbem LLC D.B. 5683, PG. 608 # 99 / D.B. 26531, PG. 346 PIN. 147-021-41 w Concrete :: PIN.- 147-021-20 GRADING PERMIT IS REQ IRED FOR / / Lott / Fountains at New Bern a DISTURBANCE 1 OR MOR ACRES w"Ju m. ./. y M.B. 55, PG. 579 / \ � / 'Py �0 / HOLE V DEEP O� R/ z4 RCP- mm `- �A> 33.5" DEEP OUT=707 9E- 4 W SS W W - -SS �S \ S TERR S ,W ' TBM 71 5 - W - W --w\ V -SS- �- ss- -r w - 6 WATTR aflw -w --W- o� - ,7 S54 2 R/W 3.32 1) F SF °° 6' 'ki W BLIND JUNCTION - R/W �- - As halt INV IN 705.05 p INV OUT 704.6,5 Asphclt�OE� r �grete I ° N 3 Well t St op �50.3' c E < x' Asphalt �.; o � m,4 St�pwp 6" wall FFE-711.58 FFE-711.75 « 59.6' \5 FEE =711.66 \FEE 711.64 FFE-715.93 HEIGHT-16.5' -71 . \\\\ Co x \\ \\ \\\\ L I LIMITS OF / DISTURBANCE (TYP.) Asphalt N Q ,. � 50.3' -.. co M • m..w...„ Concrete m - 59.7'.... v -f --- - 18 .......m ..... A 3.0' 71I " � 15 " � --- - a �.. GR 7 w OUT/705. . o;+t'•. w / \' o ra gee E semeC•t .Ito k.�HEEI�' Dull... I \.. 8, a t� 9 _7 - - _ �u .v M ! \ N56�13'23W 22'G`.34 ® �\®cB .. GR-723.70 ,- _ 3 DI \ .. ,,,,�! DI �J 48' RCP Storm Pipe May\Be Sub ect to r GR=716.06 \ 48 RCP \G 713 04 7055" Drama e Ea ement 4 o 9 SILTfENCE TYP. rt OUT=UNAB LE — N' TO MEASURE .. u.. ......... ..... _ �------- � " \ LM P City of Charlotte ,D.B. 14846, PG. 97 PIN. • 147-021-28 Tract I Fridell Property -Map 1 M.B. 35, PG. 321 GRAPHIC SCALE 20 0 10 20 40 ( IN FEET) 1 inch = 20 ft. LEGEND: EASEMENT RIGHT-OF-WAY ------- SETBACK G G GAS LINE CE of of OVERHEAD POWER LINE ss ss EXISTING SANITARY SEWER PIPE so so EXISTING STORM DRAIN PIPE -UT-UT-TELEPHONE LINE (UNDERGROUND) w w WATER LINE CATCH BASIN & PIPE D STORM DRAIN JUNCTION BOX & PIPE Q ' , PROPOSED CONCRETE PAVEMENT TP TP PROPOSED TREE PROTECTION FENCE EROSION CONTROL LEGEND LIMITS OF DISTURBANCE TRIBUTARY AREA -SF -o-o-SP - -0- TEMPORARY SUPER SILT FENCE -SF -SF -SF -SF - TEMPORARY SILT FENCE 685 MAJOR PROPOSED CONTOURS 684 MINOR PROPOSED CONTOURS 635 EX. MAJOR CONTOURS 684 EX. MINOR CONTOURS C.B./DI INLET PROTECTION ROCK CHECK DAM TEMPORARY CONSTRUCTION ENTRANCE CONSTRUCTION SEQUENCE 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE CITY OF CHARLOTTE ENGINEERING DEPARTMENT. 2. SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR OF THE CITY ENGINEERING DEPARTMENT TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF CHAPTER 17 OF THE CITY CODE AND IS SUBJECTTO FINE. 3. INSTALL SUPER SILT FENCE AND INLET PROTECTION AS SHOWN. BLOCK OFF SITE ACCESS POINTS TO VEHICULAR TRAFFIC. 4. COORDINATE WITH THE CITY INSPECTOR TO ENSURE SUPER SILT FENCE AND INLET PROTECTION INSTALLATION IS SATISFACTORY PRIOR TO BEGINNING DEMOLITION. 5. COORDINATE WITH CITY INSPECTOR UPON COMPLETION OF PHASE 1 DEMOLITION. 6. INSTALL ALL PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 7. CONTINUE CONSTRUCTION OF THE SITE TO COMPLETION. 8. UPON FINAL STABILIZATION OF THE SITE, THE CONTRACTOR SHALL CONTACT THE CITY INSPECTOR TO RECEIVE APPROVAL. GENERAL CONSTRUCTION SEQUENCE NOTES: • THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. • FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. • STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. • COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURE. • ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, AND THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. EROSION AND SEDIMENT CONTROL NOTES: LOCATION MAP Not to Scale GENERAL NOTES 1. ALL MATERIALS, CONSTRUCTION, AND PLANS ARE TO COMPLY WITH CURRENT CITY OF CHARLOTTE AND NCDEQ STANDARD SPECIFICATIONS AND DETAILS. 2. CONTACT NORTH CAROLINA ONE CALL SERVICE @ 811 OR 800-632-4949 AND CITY OF CHARLOTTE, A MINIMUM OF 72 HOURS BEFORE DIGGING. 3. ANY SITE GRADING SHALL COMPLY WITH INTENT OF ORIGINAL DEVELOPMENT GRADING AND DRAINAGE PLANS. 4. THE CONTRACTOR SHALL VERIFY ALL EXISTING STRUCTURES PRIOR TO CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. 5. NO BMPS SHALL BE PLACED ON ADJACENT PROPERTY WITHOUT THE WRITTEN CONSENT OF THE PROPERTY OWNER AND THE CITY OF CHARLOTTE. 6. THE NCDEQ EROSION CONTROL MANUAL AND CITY OF CHARLOTTE STANDARDS SHALL BE USED AS A GUIDELINE FOR IMPLEMENTATION AND MAINTENANCE OF BMPS. THE FOLLOWING BMPS: • SURFACE ROUGHENING • STABILIZED CONSTRUCTION ENTRANCE • SILT FENCE • HARDWARE FABRIC AND STONE INLET PROTECTION • CHECK DAMS • TEMPORARY SEEDING • PERMANENT SEEDING • MULCHING • SOD 1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) FEET SHOULD BE STABILIZED WITH SYNTHETIC OR 21. SHOW BMP MEASURES FOR CONCRETE TRUCK WASHOUT AREA, OR ADD THE FOLLOWING NOTES: VEGETATIVE MAT, IN ADDITION TO HYDROSEEDING. IT MAYBE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED DAILY UNTILTHE SLOPE IS CONCRETE TRUCKS SHALL NOT TYPICALLY BE WASHED OUT ON SITE. IF CONCRETE TRUCK WASHOUT IS BROUGHT TO GRADE. PERMITTED ON SITE, COORDINATE LOCATION AND BMP'S WITH SITE INSPECTOR. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE DO NOT DISPOSE OF CONCRETE TRUCK WASHOUT WASTE BY DUMPING INTO A SANITARY SEWER, CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN STORM DRAIN OR ONTO SOIL OR PAVEMENT THAT CARRIES STORM WATER RUNOFF. FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW: CONCRETE TRUCK WASHOUT SHALL BE DISPOSED OF IN ACCORDANCE WITH THE FOLLOWING: ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL T01 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION DESIGNATED AREA THAT WILL LATER BE BACKFILLED SLURRY PIT ( ) WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM DESIGNATED AREA WHERE CONCRETE WASH CAN HARDEN AND BE DISPOSED OF AS SOLID WASTE. THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED LOCATION THAT IS NOT SUBJECT TO WATER RUNOFF AND MORE THAN 50 FEET AWAY FROM A TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN STORM DRAIN, OPEN DITCH, OR RECEIVING WATER WAY. ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. PUMP EXCESS CONCRETE IN CONCRETE PUMP BIN BACK INTO CONCRETE MIXER TRUCK. CONCRETE WASHOUT FROM CONCRETE PUMPER BINS CAN BE WASHED INTO CONCRETE PUMPER 3. ALL CUT AND FILL SLOPES AND CHANNEL SIDE SLOPES WHICH ARE NOT TO BE PAVED SHALL BE SEEDED TRUCKS AND DISCHARGED INTO DESIGNATED WASHOUT AREA OR PROPERLY DISPOSED OF UNTIL A GOOD STAND OF GRASS IS OBTAINED IN ACCORDANCE WITH THE SEEDING SCHEDULE ON SHEET OFFSITE. C8.5. ALL SEEDING WILL BE MULCHED. 22. ALL CHEMICAL SPILLS, OIL SPILLS, OR FISH KILLS MUST BE REPORTED TO NCDEQ- CALL THE 24-HOUR 4. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS AND WITHIN EMERGENCY RESPONSE LINE AT 1-800-858-0368. 24 HOURS AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (0.5) INCH. IF SITE INSPECTIONS IDENTIFY BMPS THAT ARE DAMAGED OR NOT OPERATING EFFECTIVELY, MAINTENANCE MUST BE 23. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR ALL CONSTRUCTION WORKERS AND SITE VISITORS PERFORMED AS SOON AS PRACTICABLE OR AS REASONABLY POSSIBLE AND BEFORE THE NEXT STORM IN ACCORDANCE WITH 2O06 INTERNATIONAL PLUMBING CODE GENERAL REGULATIONS, SECTION 311. EVENT WHENEVER PRACTICABLE. PORTABLE FACILITIES SHALL BE PLACED ON LEVEL GROUND AND AWAY FROM STORM DRAINAGE SYSTEMS (DITCHES, CATCH BASINS, ETC.). DISPOSAL AND HANDLING OF SANITARY WASTE MUST COMPLY WITH 5. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY STATE AND LOCAL REQUIREMENTS. SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY STORMWATER SYSTEMS, WATER COURSES AND WATERS OF THE STATE (WOS) OR WATERS OF THE UNITED STATES (WOU.S.). 24. FINAL GRADES FOR GRASSED AND LANDSCAPED AREAS SHALL REQUIRE A MINIMUM OF 4-61 OF CLEAN TOP SOIL, FREE OF DEBRIS AND CONTAMINANTS, AND PREFERABLY OF NATIVE ORIGIN. 6. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTILTHE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN 25. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE 26. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 7. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY 27. IN ORDER TO ENSURE PROPER DRAINAGE, KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 28. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT-OF-WAY IF DEEMED 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCE. NECESSARY BY THE INSPECTOR. 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO 29. CURB AND GUTTER SHOWN ON PLANS ALONG NORTH COLLEGE STREET MAY BE ADJUSTED BASED UPON ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL FIELD STAKING BY CITY ENGINEERING. ASSOCIATED STORM DRAINAGE MAY ALSO REQUIRE MODIFICATION EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE BASED UPON FIELD CONDITIONS. NOTED. 30. THE DEVELOPER SHALL CONTACT THE CHARLOTTE DEPARTMENT OF TRANSPORTATION (GUS JORDI, 10. THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE RECOMMENDED AT A MINIMUM. 704-336-7086) TO IDENTIFY ANY CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60- 90 DAYS WILL ACTUAL MEASURE NECESSARY FOR CONTAINMENT OF RUN-OFF SHALL BE THE RESPONSIBILITY OF THE BE REQUIRED TO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIBLE FOR ALL RELATED CONTRACTOR AND BE FIELD VERIFIED. RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THE CONTRACTOR/DEVELOPER. 11. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE 31. CERTIFICATION AND STREET CUT PERMITS ARE REQUIRED FOR UTILITY CUTS ON CITY STREETS. ALLOW 7 OF THE CITY ENGINEERING DEPARTMENT. DAYS PROCESSING FOR PERMIT. FOR INFORMATION CONTACT CHARLOTTE DEPARTMENT OF TRANSPORTATION (704-336-4025) OR VISIT 12. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10, REQUIRE ADEQUATE HTTP://WWW.CHARMECK.ORG/DEPARTMENTS/TRANSPORTATION/STREET+MAINTENANCE/HOME.HTM TERRACING. 32. ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF THE SIDEWALK OR TRAVEL LANE FOR LESS 13. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT THAN 30 DAYS REQUIRES A R/W USE PERMIT. TRAFFIC CONTROL PLANS FOR ANY SIDEWALK OR TRAVEL PREVIOUSLY APPROVED. LANE CLOSURES MUST BE SUBMITTED AS PART OF THE R/W USE PERMIT REQUEST. TRAFFIC CONTROL PLANS MUST BE IN ACCORDANCE WITH CDOT'S WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) AND 14. ON -SITE BURIAL PITS ARE NOT ALLOWED, UNLESS WRITTEN APPROVAL IS RECEIVED FROM THE OWNER AND MUST BE REVIEWED AND APPROVED. CONTRACTOR SHALL CONTACT CDOT AT LEAST 5 BUSINESS DAYS IN AN ON -SITE DEMOLITION LANDFILL PERMIT IS RECEIVED FROM THE ZONING ADMINISTRATOR. ADVANCE OF BEGINNING OF WORK AT (704) 432-1562. 15. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF 33. RIGHT-OF-WAY CLOSURES LONGER THAN 30 DAYS REQUIRE A R/W LEASE AGREEMENT WHICH WILL THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. INCLUDE THE SUBMITTAL OF A TRAFFIC CONTROL PLAN. TRAFFIC CONTROL PLANS REQUIRED THROUGH A LEASE AGREEMENT MAYBE DIFFERENT FROM THE ONE REQUIRED DURING THE LAND DEVELOPMENT PLAN 16. ALL "STD." NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. REVIEW AND ARE SUBJECT TO REVISIONS. THE REVISED TRAFFIC CONTROL PLANS MUST BE SUBMITTED AS PART OF THE LEASE AGREEMENT PROCESS FOR APPROVAL PRIOR TO START OF R/W CLOSURES. 17. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348. PRE -CONSTRUCTION MEETING. 34. CONSTRUCTION STAGING WITHIN CITY R/W LASTING MORE THAN 30 DAYS REQUIRES A R/W LEASE 18. A PREWORK MEETING SHALL BE SCHEDULED WITH THE CITY INSPECTOR PRIOR TO CONSTRUCTION. AGREEMENT. CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348. 19. APPROVAL OF THE EROSION AND SEDIMENT CONTROL PLANS BY THE CITY OF CHARLOTTE GRANTS COVERAGE TO THE DEVELOPMENT UNDER THE STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES (NCDEQ) DIVISION OF WATER QUALITY (DWQ) GENERAL PERMIT - NCG 010000 TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM FOR CONSTRUCTION ACTIVITIES. THE FINANCIALLY RESPONSIBLE PARTY FOR THIS DEVELOPMENT IS RESPONSIBLE FOR MEETING THE REQUIREMENTS OF THE GENERAL PERMIT. A COPY OF THE GENERAL PERMIT IS AVAILABLE ONLINE THROUGH THE NCDEQ-DWQ WEB SITE https:Hdeg. nc.gov/a bout/d ivisions/energy-m inera l-land-resources/energy-m inera l-la nd-permits/stormwater-permits/construction-sw 20. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR *** 3 Days Before Digging *** IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT North Carolina 811 COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN 811 or 1-800-632-4949 STORM WATER DISCHARGES. Remote Ticket Entry http://nc8l l.org/remoteticketentry.htm ssi'' 33046 9) 4--) W co O O O W 0 ^� W � F-�-1 MODIFICATION LOG JOB NUMBER: C200023 CHECKED BY: BMF DRAWN BY: BHE DATE: 11-24-20 688E-0 # INiJI_4 Z < °° 11 N a • N C) ^1 3 0 W U) N N o Q N V N Q LU a)S 4; N CM U W oZ C13U O N 00 N E C) NE L < cc) EROSION AND SEDIMENT CONTROL PH 1 SHEET: C490 ■ CHAI ►III FINAL APPROVAL 77T472021 INV-708 44 l[LOT 11., PROJECT NUMBER: LDUTOD-2020-00064 I \ ENGINEERING PCSO DETENTION/ DRAINAGE PLAN EROSION CONTROL U BAN FORESTRY - TREE RDINANCE C OT PLANNING <. UMUD / MUDD / PED / TOD NOTE: HIS PLAN APPROVAL DOES NOT INCLU E CHARLOTTE WATER. FOR MORE INFO ATION, PLEASE CALL 704-336- visrrittp://charlottewater.org NOTE: THIS SLAW=APPROVAL D6&,_1TOT-SS INCLUDE COMMERCIAL ZONING.WALt.ZyILMNG PERMITS AND ZONING APPROVALS CAI�BE 0BTAINrV AT-14ECK-L-EIN C(1l ��TnpE - ENFORCEMENT. PLEASE CALL CT AT 704-314-CODE(2633) FOR MORE I FORMATION. NOTE: SCHEDULE PRE -CONSTRUCTION EETI AT LE T 48 HRS. PRIOR TO ANY AND DISTU BING ACTIVITY USING THE ONLINE" FORM OUND AT http://charlotten .gov/t� Keith Schell \ \ Justin KLein R/W Craig Robinson--- C P k f 24" ll = FOSTER AVENUE � m - R/W 50' PUBLIC R/W R/W R1W 6" WM INSIDE SMH G -G - G 38" DEEP / -G -G - -G 1 d e V I n 01 lull a ey Curb C B GR-70 5 I 06.47 f 0-706.23 SSMH - RIM =708.87 " n IN-703.35 G 709.39 OUT=701.78 N-7 5.52 24" I/alleCurb _� - s- W w-- V06 gblood St. Concrete Metal 1iiiiiiii�E i 14 uiUM D e�I b ....Trash*\ Room Db Fred S. Gutuick D.B. 5683, PG. 608 PIN. • 147-021-41 w W 11 a ED aana� - aaa� , i _ � ■- �■ Ire .: � \:!��j� j����,. d a 716 LJ b / b D P D } ryAb b 71 Retail °b Leasing 4, / Office o Lobby oc c°\ O /...714 Mailboxes Bicycle b INLET PROTECT N b b b o � I Storage o d ° b o ° b o° I (TYP.) b rm. Pump I �` �� ° b o ob° b Elevat r S p�ppp�ppp� o � 1 MDF Room / o D ° _ a a G a s D a a a D a a ° DISTU D AREA: a a a a 01.00 ACRES Q f \ t, b\> 1 g TSNewbemLLC 6 . ';... #dX D.B. 26531, PG. 346 l ° l PIN. • 147-021-20 r b � � bLot l GRADING PERMIT IS REQUIRED FOR Fountains at New Bem b D ° DISTURBANCE 1 OR MORE ACRES o b a X M.B. 55, PG. 579 b b b Stairwell / b b b b d p Electrical / a a a a a �E p b b b �a • @@ b B b b 4 b o 33 ## S a b a a b a Doe b b ## ba b gg m.. n.,. ......... .... .... .... ......... ......... ... ... : •� �. bb � � ......:.., .W.u... .v ""..... * .'. ' rho.. ..•. ,. 4 6 _ o b d a D b .... ° .......... ......... b b b w... b b D \� b ,:.. •,.�• 4 D „ ...�, g...... b .. Stairwell b . # 0 pp � n u _y yam. 7- #- 48' RCP Gd1I3 04 �.. - 7. T -715 (48-702.12 A GRAPHIC SCALE 20 0 10 20 40 ( IN FEET) 1 inch = 20 ft. r v N56 m ®\\®CB 3 � GR-723.70 48" RCP _...DI Storm Pipe Mae Subject to w •• GR=718.06 Drainage Eaement `# .° - g w rt OUT -UNABLE.. ' TO MEASURE City of Charlotte ,,D.B. 14846, PG. 97 PIN. 147-021-28 Tract I Fridell Property -Map 1 M.B. 35, PG. 321 LIMITS OF DISTURBANCE (TYP.) LEGEND: EASEMENT RIGHT-OF-WAY ------- SETBACK G G GAS LINE OE of of OVERHEAD POWER LINE ss ss EXISTING SANITARY SEWER PIPE -So-so-EXISTING STORM DRAIN PIPE -UT-UT-TELEPHONE LINE (UNDERGROUND) w w WATER LINE CATCH BASIN & PIPE D STORM DRAIN JUNCTION BOX & PIPE Q ' , PROPOSED CONCRETE PAVEMENT rP rP PROPOSED TREE PROTECTION FENCE EROSION CONTROL LEGEND am on= mm am LIMITS OF DISTURBANCE TRIBUTARY AREA -SF - -0-SF - -0- TEMPORARY SUPER SILT FENCE -sF -sF -sF -sF - TEMPORARY SILT FENCE 685 MAJOR PROPOSED CONTOURS 684 MINOR PROPOSED CONTOURS 635 EX. MAJOR CONTOURS 684 EX. MINOR CONTOURS C.B./DI INLET PROTECTION ROCK CHECK DAM TEMPORARY CONSTRUCTION ENTRANCE CONSTRUCTION SEQUENCE 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE CITY OF CHARLOTTE ENGINEERING DEPARTMENT. 2. SET UP AN ON -SITE PRE -CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR OF THE CITY ENGINEERING DEPARTMENT TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF CHAPTER 17 OF THE CITY CODE AND IS SUBJECTTO FINE. 3. INSTALL SUPER SILT FENCE AND INLET PROTECTION AS SHOWN. BLOCK OFF SITE ACCESS POINTS TO VEHICULAR TRAFFIC. 4. COORDINATE WITH THE CITY INSPECTOR TO ENSURE SUPER SILT FENCE AND INLET PROTECTION INSTALLATION IS SATISFACTORY PRIOR TO BEGINNING DEMOLITION. 5. COORDINATE WITH CITY INSPECTOR UPON COMPLETION OF PHASE 1 DEMOLITION. 6. INSTALL ALL PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 7. CONTINUE CONSTRUCTION OF THE SITE TO COMPLETION. 8. UPON FINAL STABILIZATION OF THE SITE, THE CONTRACTOR SHALL CONTACT THE CITY INSPECTOR TO RECEIVE APPROVAL. GENERAL CONSTRUCTION SEQUENCE NOTES: • THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. • FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. • STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. • COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURE. • ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, AND THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. EROSION AND SEDIMENT CONTROL NOTES: LOCATION MAP Not to Scale GENERAL NOTES 1. ALL MATERIALS, CONSTRUCTION, AND PLANS ARE TO COMPLY WITH CURRENT CITY OF CHARLOTTE AND NCDEQ STANDARD SPECIFICATIONS AND DETAILS. 2. CONTACT NORTH CAROLINA ONE CALL SERVICE @ 811 OR 800-632-4949 AND CITY OF CHARLOTTE A MINIMUM OF 72 HOURS BEFORE DIGGING. 3. ANY SITE GRADING SHALL COMPLY WITH INTENT OF ORIGINAL DEVELOPMENT GRADING AND DRAINAGE PLANS. 4. THE CONTRACTOR SHALL VERIFY ALL EXISTING STRUCTURES PRIOR TO CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. 5. NO BMPS SHALL BE PLACED ON ADJACENT PROPERTY WITHOUT THE WRITTEN CONSENT OF THE PROPERTY OWNER AND THE CITY OF CHARLOTTE. 6. THE NCDEQ EROSION CONTROL MANUAL AND CITY OF CHARLOTTE STANDARDS SHALL BE USED AS A GUIDELINE FOR IMPLEMENTATION AND MAINTENANCE OF BMPS. THE FOLLOWING BMPS: • SURFACE ROUGHENING • STABILIZED CONSTRUCTION ENTRANCE • SILT FENCE • HARDWARE FABRIC AND STONE INLET PROTECTION • CHECK DAMS • TEMPORARY SEEDING • PERMANENT SEEDING • MULCHING • SOD 1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) FEET SHOULD BE STABILIZED WITH SYNTHETIC OR 21. SHOW BMP MEASURES FOR CONCRETE TRUCK WASHOUT AREA, OR ADD THE FOLLOWING NOTES: VEGETATIVE MAT, IN ADDITION TO HYDROSEEDING. IT MAYBE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED DAILY UNTILTHE SLOPE IS CONCRETE TRUCKS SHALL NOT TYPICALLY BE WASHED OUT ON SITE. IF CONCRETE TRUCK WASHOUT IS BROUGHT TO GRADE. PERMITTED ON SITE COORDINATE LOCATION AND BMP S WITH SITE INSPECTOR. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE DO NOT DISPOSE OF CONCRETE TRUCK WASHOUT WASTE BY DUMPING INTO A SANITARY SEWER, CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN STORM DRAIN OR ONTO SOIL OR PAVEMENT THAT CARRIES STORM WATER RUNOFF. FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW: CONCRETE TRUCK WASHOUT SHALL BE DISPOSED OF IN ACCORDANCE WITH THE FOLLOWING: SILT FENCE TYP. ( ) ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL T01 VERTICAL 3:1 SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION DESIGNATED AREA THAT WILL LATER BE BACKFILLED SLURRY PIT WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM DESIGNATED AREA WHERE CONCRETE WASH CAN HARDEN AND BE DISPOSED OF AS SOLID WASTE. THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED LOCATION THAT IS NOT SUBJECT TO WATER RUNOFF, AND MORE THAN 50 FEET AWAY FROM A TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN STORM DRAIN, OPEN DITCH, OR RECEIVING WATER WAY. ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. PUMP EXCESS CONCRETE IN CONCRETE PUMP BIN BACK INTO CONCRETE MIXER TRUCK. CONCRETE WASHOUT FROM CONCRETE PUMPER BINS CAN BE WASHED INTO CONCRETE PUMPER 3. ALL CUT AND FILL SLOPES AND CHANNEL SIDE SLOPES WHICH ARE NOT TO BE PAVED SHALL BE SEEDED TRUCKS AND DISCHARGED INTO DESIGNATED WASHOUT AREA OR PROPERLY DISPOSED OF UNTIL A GOOD STAND OF GRASS IS OBTAINED IN ACCORDANCE WITH THE SEEDING SCHEDULE ON SHEET OFFSITE. C8.5. ALL SEEDING WILL BE MULCHED. 22. ALL CHEMICAL SPILLS, OIL SPILLS, OR FISH KILLS MUST BE REPORTED TO NCDEQ- CALL THE 24-HOUR 4. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS AND WITHIN EMERGENCY RESPONSE LINE AT 1-800-858-0368. 24 HOURS AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF (0.5) INCH. IF SITE INSPECTIONS IDENTIFY BMPS THAT ARE DAMAGED OR NOT OPERATING EFFECTIVELY, MAINTENANCE MUST BE 23. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR ALL CONSTRUCTION WORKERS AND SITE VISITORS PERFORMED AS SOON AS PRACTICABLE OR AS REASONABLY POSSIBLE AND BEFORE THE NEXT STORM IN ACCORDANCE WITH 2O06 INTERNATIONAL PLUMBING CODE GENERAL REGULATIONS, SECTION 311. EVENT WHENEVER PRACTICABLE. PORTABLE FACILITIES SHALL BE PLACED ON LEVEL GROUND AND AWAY FROM STORM DRAINAGE SYSTEMS (DITCHES, CATCH BASINS, ETC.). DISPOSAL AND HANDLING OF SANITARY WASTE MUST COMPLY WITH 5. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY STATE AND LOCAL REQUIREMENTS. SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY STORMWATER SYSTEMS, WATER COURSES AND WATERS OF THE STATE (WOS) OR WATERS OF THE UNITED STATES (WOU.S.). 24. FINAL GRADES FOR GRASSED AND LANDSCAPED AREAS SHALL REQUIRE A MINIMUM OF 4-61 OF CLEAN TOP SOIL, FREE OF DEBRIS AND CONTAMINANTS, AND PREFERABLY OF NATIVE ORIGIN. 6. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTILTHE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN 25. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE 26. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 7. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY 27. IN ORDER TO ENSURE PROPER DRAINAGE, KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 28. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT-OF-WAY IF DEEMED 8. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ENTRANCE. NECESSARY BY THE INSPECTOR. 9. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO 29. CURB AND GUTTER SHOWN ON PLANS ALONG NORTH COLLEGE STREET MAY BE ADJUSTED BASED UPON ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL FIELD STAKING BY CITY ENGINEERING. ASSOCIATED STORM DRAINAGE MAY ALSO REQUIRE MODIFICATION EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE BASED UPON FIELD CONDITIONS. NOTED. 30. THE DEVELOPER SHALL CONTACT THE CHARLOTTE DEPARTMENT OF TRANSPORTATION (GUS JORDI, 10. THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE RECOMMENDED AT A MINIMUM. 704-336-7086) TO IDENTIFY ANY CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60- 90 DAYS WILL ACTUAL MEASURE NECESSARY FOR CONTAINMENT OF RUN-OFF SHALL BE THE RESPONSIBILITY OF THE BE REQUIRED TO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIBLE FOR ALL RELATED CONTRACTOR AND BE FIELD VERIFIED. RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THE CONTRACTOR/DEVELOPER. 11. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE 31. CERTIFICATION AND STREET CUT PERMITS ARE REQUIRED FOR UTILITY CUTS ON CITY STREETS. ALLOW 7 OF THE CITY ENGINEERING DEPARTMENT. DAYS PROCESSING FOR PERMIT. FOR INFORMATION CONTACT CHARLOTTE DEPARTMENT OF TRANSPORTATION (704-336-4025) OR VISIT 12. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10, REQUIRE ADEQUATE HTTP://www.CHARMECK.ORG/DEPARTMENTSfrRANSPORTATION/STREET+MAINTENANCE/HOME.HTM TERRACING. 32. ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF THE SIDEWALK OR TRAVEL LANE FOR LESS 13. A GRADING PLAN MUST BE SUBMITTED FOR ANY LOT GRADING EXCEEDING ONE ACRE THAT WAS NOT THAN 30 DAYS REQUIRES A R/W USE PERMIT. TRAFFIC CONTROL PLANS FOR ANY SIDEWALK OR TRAVEL PREVIOUSLY APPROVED. LANE CLOSURES MUST BE SUBMITTED AS PART OF THE R/W USE PERMIT REQUEST. TRAFFIC CONTROL PLANS MUST BE IN ACCORDANCE WITH CDOT'S WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) AND 14. ON -SITE BURIAL PITS ARE NOT ALLOWED, UNLESS WRITTEN APPROVAL IS RECEIVED FROM THE OWNER AND MUST BE REVIEWED AND APPROVED. CONTRACTOR SHALL CONTACT CDOT AT LEAST 5 BUSINESS DAYS IN AN ON -SITE DEMOLITION LANDFILL PERMIT IS RECEIVED FROM THE ZONING ADMINISTRATOR. ADVANCE OF BEGINNING OF WORK AT (704) 432-1562. 15. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF 33. right-of-way closures longer than 30 days require a r/w lease agreement which will include the submittal of THE CITY/COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. a traffic control plan. traffic control plans required through a lease agreement may be different from the one required during the land development plan review and are subject to revisions. the revised traffic 16. ALL "STD." NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL. control plans must be submitted as part of the lease agreement process for approval prior to start of r/w 17. DRIVEWAY PERMIT FOR CONSTRUCTION ENTRANCES IN NCDOT RIGHT OF WAY MUST BE PRESENTED AT closures. contractor shall contact cdot at (704) 336-8348. PRE -CONSTRUCTION MEETING. 34. construction staging within city r/w lasting more than 30 days requires a r/w lease agreement. contractor 18 A PREWORK MEETING SHALL BE SCHEDULED WITH THE CITY INSPECTOR PRIOR TO CONSTRUCTION shall coNTACT CDOT AT (704) 336-8348. 19. APPROVAL OF THE EROSION AND SEDIMENT CONTROL PLANS BY THE CITY OF CHARLOTTE GRANTS COVERAGE TO THE DEVELOPMENT UNDER THE STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES (NCDEQ) DIVISION OF WATER QUALITY (DWQ) GENERAL PERMIT - NCG 010000 TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM FOR CONSTRUCTION ACTIVITIES. THE FINANCIALLY RESPONSIBLE PARTY FOR THIS DEVELOPMENT IS RESPONSIBLE FOR MEETING THE REQUIREMENTS OF THE GENERAL PERMIT. A COPY OF THE GENERAL PERMIT IS AVAILABLE ONLINE THROUGH THE NCDEQ-DWQ WEB SITE https:Hdeg. nc.gov/a bout/d ivisions/energy-m inera l-land-resources/energy-m inera l-la nd-permits/stormwater-permits/construction-sw 20. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR *** 3 Days Before Digging *** IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT North Carolina 811 COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN 811 or 1-800-632-4949 STORM WATER DISCHARGES. Remote Ticket Entry http://nc8l l.org/remoteticketentry.htm S S/'' q* s 33046 _1n_11 ) 1V T W co O O N 4-) 0 r� O O W 0 ^� W � T� V1 MODIFICATION LOG JOB NUMBER: C200023 CHECKED BY: BMF DRAWN BY: BHE DATE: 11-24-20 688E-0 # INiJI_4 Z Q 00 11 N a • N C) W U) N N o 13.0 Q N V 04 Q LU a)E- N 4; CM U W oZ .0 U O N 00 N E C) NE L Q cc) EROSION AND SEDIMENT CONTROL PH2 SHEET: C4e 1 ■ CRAI EN PCSO ER UP TREE CC PL NOTE: INCLU INFOR VISIT NOTE: INCLU PERMI O BTAI ENFOF 704-3: NOTE: AT LEI DISTU FORM ID FINAL APPROVAL 77T 472021 I[LOTTE- PROJECT NUMBER: LDUTOD-2020-00064 I GINEERING STEEL P Keith 6' MAX. DETENTION / DRAINAGE PLAN OSION CONTROL .4" Khain • �::.:�. -: ; �4 rr ANNING _ / MUDD / PED / TOD - T HIS PLAN APPROVAL DOES NOT E CHARLOTTE WATER. FOR MORE ATION, P L -5499 OR ittp://char THIS PLANIAPPIAMENDOUTEROMABRIC BE JSED WHERE S FENCE IS TO REMAIN FOR A PERIOD OF )E COMMERCIAMOREIIIIIMhKI30BOAY$NG FS AND ZONING APPROVALS CAN BE 4ED AT ME2KLE8XgiG FUSUnSHRU BE 5 0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL CEMENT. PLEASIL CTAC AT 4-CODE(2633) FOR MORE INFORMATION. SCHEDUL RE- S I E AT ENDS. 48 RS PRIpA CE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS BINGT H ACT 'f: BUFF S, STREAMS OR WETLANDS (REFER TO SWIM BUFFER =oUND AT http: GR R1 1S RES' D FOR VISUAL IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS CHARLMTE_ INCLUDES CHARLOTTE ETJ STEEL POST FILTER FABRIC ANCHOR SKIRT; EXCAVATE TRENCH AND COMPACT BACKFILL MAINTENANCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. TEMPORARY SILT FENCE NOT TO SCALE GENERAL NOTES: 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2-FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE CLEAN GRAVEL (NC DOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. 6. COMPACT THE AREA PROPERLY AND STABILIZED IT WITH GROUNDCOVER. NCDOT #5 OR #57 WASHED STONE NCDOT #5 OR #57 WASHED STONE • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS 30.06A 15 CMUMTE- INCLUDES CHARLOTTE ETJ NOTES: 1. A STABILIZED ENTRANCE PAD OF 2-3" OF WASHED STONE AND/OR RAILROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. ANY AGGREGATE TRACKED INTO THE ROADWAY MUST BE SWEPT BACK ONSITE ON A NIGHTLY BASIS. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN SEE STD. NO. 30.11B. 6. CDOT MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 10.24 & 10.25) TO ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE, OR ON ANY STREET WITH AN EXISTING SIDEWALK TO REMAIN OPEN DURING CONSTRUCTION. 7. FOLLOW WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) FOR SIDEWALK CLOSURE OR DETOUR/DIVERSION. EXISTING GROUND SOILI STABILIZATION FABRIC UNDER 2-3" OF WASHED STONE Z 00 PUBLIC STREET w w V) N U J m D a EX. CONC. DRIVEWAY APRON WITH SIDEWALK AT BACK OF CURB (IF RETAINED DURING CONSTRUCTION.) NOT TO SCALE • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS STABILIZED CONSTRUCTION ENTRANCE INCLUDES CHARLOTTE ETJ GENERAL NOTES: 1. RIPRAP SIZE TO BE DESIGNED BY ENGINEER. 2. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATE SEDIMENT TRAPS. V-6• MIN. SECTION • CITY OF CHARLOTTE STD. NO. I RJM LAND DEVELOPMENT STANDARDS 30.11 A 15 CMMTE_ INCLUDES CHARLOTTE ETJ 3. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE 5 WASHED STONE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE DOWNSTREAM DAM (SEE DIAGRAM BELOW). 2 MAXIMUM SPACING B A AND B ARE AT EQUAL ELEVATIONS CLASS B RIP PLAN 4'TO6' CROSS SECTION H 2' MAX AT CENTER NOT TO SCALE • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS TEMPORARY ROCK CHECK DAM STD. NO. I REV CHARLOTTE_ INCLUDES CHARLOTTE ETJ 130.10A 115 4' MAX. �19-GAUGE HARDWARE CLOTH ( " MESH OPENINGS) ------------------ 2' 16" MIN. 2' J_ NOT TO SCALE HARDWARE CLOTH AND GRAVEL INLET PROTECTION 30 STD. N0. 1.09 1 NOTES: 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. 2. FILTER TYPES SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR TO INSTALLATION. 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION OF THE ENGINEER. 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE AND/OR CLOSE OUT OF GRADING PERMIT. 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). 6. FILTER BAGS MAY BE INSTALLED IN EXISTING CITY OR NCDOT ROADS AS LONG AS STORM DRAINAGE IS NOT IMPEDED. GRATE 1" REBAR FOR BA LET REMOVAL FROM IN FILTER I DUMP LC CATCH BASIN INSTALLATION STAKES SPECIFIC APPLICATION: THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. • CITY OF CHARLOTTE (M LAND DEVELOPMENT STANDARDS CHARIATTE- INCLUDES CHARLOTTE ETJ BLOCK AND GRAVEL STONE INLET PROTECTION NOT TO SCALE 30.07 FOR LATE WINTER AND SOIL AMENDMENTS: EARLY SPRING: FOLLOW RECOMMENDATIONS OF AND 750 LB/ACRE 10-10-10 SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE FERTILIZER SEEDING MIXTURE: MULCH: RYE (GRAIN) - 120 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANNUAL LESPEDEZA (KOBE) - 50 LB/ACRE ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING (OMIT ANNUAL LESPEDEZA WHEN DURATION TOOL OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE) MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING SEEDING DATES: EROSION OR OTHER DAMAGE JAN. 1 - MAY 1 FOR SUMMER: SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE SEEDING MIXTURE: AND 750 LB/ACRE 10-10-10 FERTILIZER GERMAN MILLET - 40 LB/ACRE MULCH: (A SMALL -STEMMED SUDANGRASS MAY BE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SUBSTITUTED AT A RATE OF 50 LB/ACRE) ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING SEEDING DATES: TOOL MAY 1 - AUG. 15 MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING DEFLECTOR REQUIRED WHEN USED ON EROSION OR OTHER DAMAGE EXISTING MAINTAINED STREETS. DEFLECTOR SHALL BE PLACED SUCH THAT FOR FALL. JUIL AM GIV UM GIV IJ: IT WILL NOT COMPLETELY OBSTRUCT STORM FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE WATER FLOW FROM ENTERING VIA THE CURB AND 1,000 LB/ACRE 10-10-10 FERTILIZER OPENING. ENSURE NO MORE THAN 25% OF SEEDING MIXTURE: CURB OPENING IS OBSTRUCTED. )UTLET RYE (GRAIN) - 120 LB/ACRE MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SEEDING DATES: ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING AUG. 15 - DEC 30 TOOL MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. FOR ADDITIONAL INFORMATION, REFER TO NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (ESCPDM), SECTION 6.10. FOR PERMANENT SEEDING SPECIFICATIONS, INCLUDING SEED BED PREP, SEASONAL LIMITATIONS FOR SEEDING OPERATIONS, THE KINDS OF GRADES OF FERTILIZERS, THE KINDS OF SEED, AND THE RATES OF APPLICATION OF LIMESTONE, FERTILIZER, AND SEED, REFER TO NCDENR ESCPDM SECTION 6.11 AND NOT TO SCALE THE CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS SECTION 04200 SEEDING AND SODDING OF TURFGRASS. • CITY OF CHARLOTTE CATCH BASIN INLET PROTECTION STD. N0. I REV. LAND DEVELOPMENT STANDARDS TEMPORARY SEEDING SCHEDULE STD. NO. IRE 30.15 113 CHARWrTE_ INCLUDES CHARLOTTE ETJ 130.17 19 *** 3 Days Before Digging *** North Carolina 811 811 or1-800-632-4949 Remote Ticket Entry http://nc811.org/remoteticketenhy.htm ``\``11►1111111►,,,, sS/ ' 33046 11 co o ' _4 4-) ^� �1 0 O .--1 O r4 U MODIFICATION LOG JOB NUMBER: C200023 CHECKED BY: BMF DRAWN BY: BHE DATE: 11-24-20 699E-0 # IN211_4 Z Q co CO a N a a)C W 0oo� � o LV ._ o WQo rn °? ) N Q LU N C 4; N w oZ CU 0 0 a) CO t`o E �p L < cc) EROSION AND SEDIMENT CONTROL DETAILS SHEET: C4w2 Y M.FP�� 111111111%0% rn FINAL APPROVAL ![LOT 'E PROJECT NUMBER: LDUTOD-2020-00064 ENGINEERING PCSO DETENTION/ DRAINAGE PLAN EROSION CONTROL U BAN FORESTRY - TREE RDINANCE C OT °611 PLANNING- UMUD / MUDD / PED / TOD NOTE: HIS PLAN APPROVAL DOES NOT INCLU E CHARLOTTE WATER. FOR MORE INFO ATION, PLEASE CALL 704-336- visrrittp://charlottewater.org NOTE: TH4S P AWAPPROVAL D6&,_ OT-SS INCLUDE COMMERCIAL ZONING.WALt.ZyItb4NG PERMITS AND ZONING APPROVALS CADRE OBTAINED AT-MEC�EN C(1l '1TE - ENFORCEMENT. PLEASE CALL CT AT 704-314-CODE 2633 FOR MORE I FORMATION. ( l M NOTE: SCHEDULE PRE -CONSTRUCTION EETI AT LE T 48 HRS. PRIOR TO ANY AND DISTU BING ACTIVITY USING THE ONLINE FORM OUND AT http://charlotten .222 m m„ .mow Keith Schell" m x FOSTER \ �AVE Justin ein � �c� AVENUE R/W R/W 50' PUBLIC R/W S c�l`Ni R/W R/W - - G IPC" - G G 6 WM INSIDE SMH _ G 38 DEEP _ G /718.05 / -G-G-G �, m �S I""�evin Parker,, 24" Volley curb CBSir curb l sir GR=7 5 TO`E CONVERT TO MH 24' Iley /Ss ,��• EXISTING CB TO 9E IN=7o6.47 N 10+00 "13=706.23 � /STRUCTURE CONVERTED TO PROP6SED JB } - SS M H 1 +00 g ° 715.70 b ° RIM-708.87 n / N=703.35 G -709.3 OUT-701.78 SSMH 717.84 24 4alley Curb A11-EX-JB N=7 5.5 A6-CBO RIM-714. 3 / ° � b I OUT= .34 OR N IN-708.24 / D 15" RCP 33.5" DEEP 713.90 oUT=707.92 / 716.24 S - 707.59 > t \ W 1- w-- 7o7.8a w w S s $ ERR. ✓�, n3.zz 707.98 BORE b - W W -SS- SS- b 716.75b / Z_ / 708.42 A8-BEND Concrete �0 088. Me Dn 708.z' 0708.3 Fred S. Gutuick D.B. 5683, PG. 608 PIN. • 147-021-41 w COP B3-DI � 10" H 111fE##3 ° 2 T) F 708.73 D 709.16 708.54 RC P �� ° Li D u ° ` n 715.97 ° 8 HDPE b b 15 RCP D nas9 ns.a2 b 708ss N7NA UUI Al2-JB ^ ti °------714.96--�---r 715.55--- b 709.28 U ^ b 713.78 . 708.59 •, _ • , , -�_ ° _' .: - �� ° 715 91 r. � - A9-BEND + 7io s9 _ na.9s 71s.7a ns.9z i _ � � � �• -------- 716.25 y 715.01 r J ° 708.68 715.97 a u -------------- - ---- ° ° 716.07 d 9 _ b 708.68708.68 ,. 716.25 �- a::: t o 716.Oa D p / u 716.17 716.18 716.17 %� ap 708.82 '�-•• 716.18 r � Q o - TRASH 716.25 716.25 RETAIL - °b LEASING _ F E=70 . FFE=716.25 70905 716.25 OFFICE BnN 4-DI cn FFE=716 15.80 o / 708.68 715.95 • � LOBBY j LP:715.58 FFE=716.25 I 715.80 r �. 716.25 716.17 b 716.17 716.17 b b D ° D I b ° b f 716.2s ' Fxq b ° MAILBOXES 716.18 CCF$$ I' BIKE b p 716.17 4 FFE=716.25 D,B, o > STORAGE b d b b G b D 716.11 2 1333 `/rye$ 715.5 FFE=716.19 b ° b ° b ° b 716.25 14i PG M% ° b o ° ° b HP.715.30 # $8 b b U b 716 d° b ELEVATOR PUMP V j MDF ROOM ° ° °Ln p ° °C 715.52 ---- r /( _ 716.19 ° b 715.99 b 715.96 1 715.94 b 715.90 716.04 1 p b 715.72 p716.15 I b ° 715.21 b b I LP 714.99 d / IE TS Newbem LLC 71 0. b b 1 b 1 6 b a b D 1 b D b o. 1 ` ;�'."." ' 715.65 A2-DI:'< D.B. 26531, PG. 346 1 1411111 715.49 0 715.77 ` b 715.70 p i b/ 4 Lot 1 n6.zo u / � � Fountains of New Bern 71 I M.B. 55, PG. 579 710.00 Db D b b b b 716.25 Lei STAIRWELL 716.09 715.67 u ° 716.18 # # 715.82 715.40 b 715.15 b 715.55 b ° ° 715.94 715.84 / b b b b D 716.25 b ELECTRICAL 716.08 HP: 715.70 I; 715.76 0 715.57 b bo b 4 D b ROOM 716.18 X FFE=716.25 716 04 715 / o b 715.94 g b b 7 b 716.23 0 1 b b d b b 33## 011 oL) o _ b b b 716.25 0R 61-DI b d ° b °b ° D ° ° ° b ° ° 715.44 Li 715.22 y. 3 715.88 b b p LP•714.62 b p 715.19 o �7..46 715.27 b ° b b. b - ° 715.42 o f b b b b b L .. ...`.W.. ,. Al DI N' ° ° W SS}f °$ »n •,.� � ._.m "a, 0 716.12 b a �' 1.;' 715.69 p 4 ° a 715.23 b 714.85 1 o 715.42 b ° M 9 i 716.14'( b ° D 715.8 715.5 gggqq 0 ° ° b °.a �., a.. u ° (�� b ° D b ° M ° b D , b ..... p ...ww..b.m�.:m � -- ----- - - 716 77 "' 716.51 f b:. b p b ,...-.•. ,...M. •^. �, �... N �....m .•.�'.: .µ".me b p ,.�.* 4 ... 715.17 A 715.74 b o° •,y + 730.25 715.68 ""` 715.55• b v b 717 37 TW` 717.0 717 STAIRWELL 716.75 BW , °\ 730.25 715.86 °v. ...M B5-BEND 15 RCP �'O B6-DI 15" RCP B7-DI 714.37 Ln 48" DI RCP G77 3.04 69-EX DI 48 - 02.1 - --------- vim 717.06 ,.: " n .za .<:_ _ ..; ne 11 7 _ 7.. :. ... 8 r. :_. ._ ........ ..._ ! 719.16TW. .r ... .<., 71 .719.12BW B2-DI •i � 719.12 ' N56'13'28 W 22G 34�T u.... _ ��� ® i P'S ®CB 477 8" RCP Storm Pipe Mays',6e Subject to � i P..R INING\ ��7 OR 718.06 Drainage Ea\ement T'� 4 0 I WALL�BY OTHERS) (30")=713.81 � I ! OUT=UNABLEmm I TO MEASURE A, � City of Charlotte � I ,,D.B. 14846, PG. 97 PIN. 147-021-28 Tract I Fridell Property -Map 1 M.B. 35, PG. 321 GRADING NOTES 1. THE CONTRACTOR SHALL NOTE THATTHE PLANS ARE SCHEMATIC IN NATURE AND DO NOT SHOW EVERY OFFSET, TRANSITION, GRADE CHANGE, ETC. THAT MAY BE REQUIRED FOR A COMPLETE AND WORKING SYSTEM. 2. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES BEFORE BEGINNING CONSTRUCTION. 3. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 4. ALL FILL TO BE COMPACTED TO 95% DRY DENSITY (STANDARD PROCTOR) UNDER PAVEMENT AND BUILDING PAD. 5. THE PROPOSED CONTOURS SHOWN ARE FINISHED ELEVATIONS. REFER TO PAVEMENT AND SIDEWALK DETAILS TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 6. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE SO THAT RUNOFF WILL FLOW BY GRAVITY AWAY FROM BUILDING(S) AND ACROSS NEW PAVEMENT AND/OR LANDSCAPE AREAS TO NEW OR EXISTING STORM DRAIN INLETS, SWALES, DITCHES OR OVERLAND SHEET FLOW. 7. GRADE BUILDING PAD TO A LEVEL BELOW FINISHED FLOOR EQUALTO THE FLOOR SLAB THICKNESS TO AN ACCURACY OF 1/10th OF A FOOT. 8. IN ORDER TO ENSURE PROPER DRAINAGE, KEEP A MINIMUM OF 0.50% SLOPE ON THE CURB. 9. COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. 10. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 11. EROSION PROTECTION DURING CONSTRUCTION MUST BE MAINTAINED UNTIL LANDSCAPING IS COMPLETE. LOCATION MAP Not to Scale LEGEND: EASEMENT PROPERTY LINE PROPERTY LINE (NOT SURVEYED) RIGHT-OF-WAY Rt- - - -R/W- - - RIGHT-OF-WAY NOT SURVEYED) SETBACK FIBER OPTIC LINE 170......... ......... ....... g ............................... FENCE - X X X X - GAS LINE -113 - -113 - -113 - POWER LINE --OE--OE--OE--OE--OE SANITARY SEWER PIPE ss ss ss STORM DRAIN PIPE WATERLINE W - - W W W--W- EX. MAJOR CONTOUR 680 - EX. MINOR CONTOUR 677 DROP INLET & PIPE CATCH BASIN & PIPE STORM DRAIN MANHOLE & PIPE GRAPHIC SCALE 20 0 10 20 40 ( IN FEET) 1 inch = 20 ft. I 1 I *** 3 Days Before Digging *** North Carolina 811 811 or1-800-632-4949 Remote Ticket Entry http://nc8l l.org/remoteticketentry.htrn loi SSI�• ' 33046 V1 W co O m rO F+I � •--1 0 N C� \� W L) V1 MODIFICATION LOG JOB NUMBER: C200023 CHECKED BY: BMF DRAWN BY: BHE DATE: 11-24-20 688E-0 # IN211_4 Z Q 00 CL N a N C) W 07CL) O N � U) o 13.0 �L C V N Q a) C 4; N W oZ 0U 0 N 00 `N E O L QaoU GRADING PLAN SHEET: C590