Loading...
HomeMy WebLinkAboutGW1-2022-02917_Well Construction - GW1_20220228 WELL CONSTRUCTION RECORD For Internal Use ONLY: G Ell p This form can be used for single or multiple wells R i a I.Well Contractor Information: 14,WATER ZONES `— Kolby Mitchell Sawyers FROM TO DESCRIPTION` fr, tL � 'v r i- v^v.'r:^(J' flit Well Contractor Name r 4471-A NC Well Contractor Certification Number 15.OUTER CASING for multi-eased wells)OR LINER(if a livable FROM TO DIAMETER THICKNESS MATERIAL CLYDE SAWYERS & SON WELL & PUMP INC +1 ft. 50 ft- 6.25 in #21 PVC Company Name 16.INNER CASING OR TUBING eothermal closed400 21100108454 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: ft. ft. in. List all applicable well permits(i.e.Count),,State, Variance,Injection,etc.) ft. ft. 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ft. ft. in. ❑Agricultural ❑Municipal/Public in. ❑Geothermal(Heating/Cooling Supply) E lResidential Water Supply(single) ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑lrri ation 0 fc. 20 rt. Bentonite Pumped Non-Water Supply Well: ❑Monitoring ❑Recovery Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier ft. ft. ❑Aquifer Test ❑Stonnwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG attach additional sheets if necessary): ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,soil/rock type,grain size,etc.) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under 421 Remarks) 0 tt 50 tt OVER BURDEN 11-16-2021 50 fr 185 ft GRANITE 4.Date Well(s)Completed: Well ID# 5a.Well Location: Chad Cabe ft. ft. Facility/Owner Name Facility ID#(if applicable) ft. ft. Hutch Mtn Estates lot 11 Fletcher, NC 28732 ft. ft. Physical Address,City,and Zip 21.REMARKS Henderson 9662765749 COnnty Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22•Certification: (if well field,one lat/long is sufficient) N w 11-16-2021 Signature of Cerlifi Well Contractor Date 6.Is(are)the well(s): 2Permanent or ❑Temporary gy signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or ENo cony gflhis record has been provided lo'lhe well owner. I/this is a repaint,lill out known well construction information and explain the nature of the repair under 021 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: 1 construction details. You may also attach additional pages ifnecessary. Fur multiple injection or non-water supply wells ONLY with the same construction,you can SUBMITTAL INSTUCTIONS submit om-fnrm. 9.Total well depth below land surface: 185 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths i/'di(Jerent(example-3@200'and 2@100') construction to the following: 10.Static water level below top of casing:40 (fL) Division of Water Resources,Information Processing Unit, if water level is above casing,use"+- 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6.25 (in.) 24b. For Infection Wells ONLY: In addition to sending the form to the address in ROTARY 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) 8 Method of test: RIG 24c.For Water Supply&Injection Wells: Also submit one copy of this form within 30 days of completion of 13b.Disinfection type: PILLS Amount: 20 well construction to the county hi alth department of the county where constructed. Form GW-I North Carolina Department of Environment and Natural Resources—Division of Water Resources Revised August 2013