Loading...
HomeMy WebLinkAboutGW1-2021-02812_Well Construction - GW1_20210810 RVELL CONKRUMON RE Gw-1 For I rnal Use Only: �. L Well Contractor Information: " L r IC.WATERZON$$.. wen Nam FROM TO 0 R' R 5 ft. R NCWd1Co Corti Nmaba IILOUTEBCAS1TiG fbrm6ltieasedWdb ORLIl�13 I\jWm— ?A DIMMORR 723cmmMATERIAL R R ia; CompegyN®e - / 46.IINN=CASINGORTUMNG( 2.Wen Comtrncden Permit d: ! v FROM ro ale�� WAa AT LLttaIIappt(arbkMsAooraar d-permlu(ia Z11� Sm�Ymimm�ue) —r R 3` R s7�j, R' 3.Well Use(check well=e). $ R in. ater Supply Well: ;;17.S(�8S11I r:.: { FROM 7O SLOTSnz: TB ffiS :MA17gTAL XAVicultural ON R is (H�C�mg SMAY) OR= water Supply(single) R io OkKkUtiaUCammeMial Opim lential Water Supply(shm4 18.QtOU1 Vkrigation ❑ >100000GPD FROM i To MA'18RiAL IMIACMMMMODaAMOUM Non-water Supply Welk R R �k ONE oRecc 7ty R R injection Weil• R❑AgniferRacharge ❑Gmo waberRemediation R QAgrriErt Storage and Recovery 13Salk tyBarrier 19.SAPID1C,dtAv&L FROM TO MA33MIAL 4>amtwcttr�rt Mnzsea OAquiSerTest C3S=mader Drainage R R OEgxrimaotal TachndoV OSubs dence Control R R OCkothemnal(Closed gyp) C3T=r LOG attieh additio®al atie4ls`itF' ': ❑ (EeatingCooling Rettua) ❑ (explain under#21 Remarks) FROM To a rrox core swi/r.e1c eee R R 4.Date Wells)Completed: -10 -7/ W ilia R tt 52.Wen Location: R R JvhY-1 �arcl". Fam3ty/Qevner Name F,c9fty MO(ifq*hcable) ft. R ° Pltysial Address,City,aodZip R R , y� 21,RB111A885: Or --1 Id on Na"4) 5b.Latitude and longitude in degreeshninutes/m onds or dee®al degrees: (ifwren&K am l VIM is snfficieft) ' 22.Certification: 91 N 2 3 ., W 6.Is(are)the welt(s): ermeaent or OTeim porm'y 2� Sigoatme VeII Dam aysigmigrJ6sfonr;ly.,,,6rtnrrhewau(s)wvs(wem)cmavu mabia000A mewtrh 7.Is this a repair to an erisfiag well:, •=es L L7 o 1SANGLC 02C:0100 or ISAJVCAC 02C.0200 WeQ Cgvnvumon Srmdads and der a copy If dds fsa npalr,jm mib O > omraszrtaa an d esplmo-,the,roaoe ofrtx of Aria rec»,dhas bmr provided to due well owner. '?!parr miler#21 rm arkseaftmt or the6=kOfthfs 23.Sine diagram or additional well details: 8.For CvmWobdDPT or Closed-Loop Geotherm I Wens having the same You may use the back of this page to provide additional well construction late construction,only 1 GW 1 is needed. 36didte TOT LL NUMBER of wells (add'See Over'in Remarks Box}You may also attach additional pares if necessary. drr7lcd 24.SUBMTITAL WSiRUCTIOiHS 9.Total well depth below land surface: (ft) For eminple,*&Est aU deeds rfaff&e u(m=plt.3@2 'm d2@IM Submit this GW 1 within 30 days of well completion per the fallowing: 10.Static water level below top of cashW. (�) 24a. For All Wells: Original fens to Division of Water Reaouaoes (DWR), to as elbows �e +i hsf miation Processing Unit 1617 NEC.Raleigh, of 27699-1617 1L Borehole diameter: {m.) 24b.For Infection Well=Copy to DWR,Underground Injection Control(RTC) Program61636 MSC,Raleigh,NC 27699=1636 a well contraction method: o t a t" r C -VV._mw,-W&reap-%eta.) 1 24c.For Water Saodand Oxen-Loop_Geotbermal Reta im Wt Cepy to the county envuonmemar halm aepactroent of the county where'm [eel FOR WATER SUPPLY ONLY: 24d.For Water Wells rode' over mm GPI):Copy to.DWR.CCPCEJA 134a.Yleld W* ? Method of test ;y- Permit Program,1611 W 99- 11 13L Dbb*cdon type: ! Am t t�✓ FomsGW-1 North r Dept ofEnvao==ul Quality-Division of Water Resources Revised 6-&2018