Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2021-02529_Well Construction - GW1_20210521
WELL CONSTRUCTION RECORD For Internal Use ONLY: This form can be used for single or.multiple wells 1..Well Contractor Information: SOShane Gossett p's O� FROM TO DESCRtPTION Well Contractor Name q 1 W 260 ft- 262 ft- 15gpm 3528-A 11't ft. tt. ra,�i�fJ NC Well Contractor Certification Number Iqt{Oif;3 t'0. c .^YtOB FROM �ro nu�fETER Tint�cNEss uAxER>►I McCall Brothers, Inc. © '1' 1 ft. 186 ft. 6.25 in. 0.25 steel Company Name t , FROM TO DTAMETER T1tICKNRSS MATERIAL 2.Well Construction Permit#: Eh20-00713 0 ft. ft. in. List all applicable well construction permits(i.e.County,State,Variance,etc.) ft. ft. In. 3.Well Use(check well use): z 11 Water Supply Well: FROM TO DIAMETER SLOT SIM THICKNESS MATERIAL ❑Agricultural ❑ umcipaMblic 0 ft. ft. in. ❑Geothermal(Heating/Cooling Supply) residential Water Supply(single) ft. ft. in. 01ndustrial/Commetcial ❑ResidenlW Water Supply(Shared) 1 flR ' TO MATERIAL EMPLICEMExThrBTHOD&AMOUNT " Irrigation❑ 0 ft. 186 ft. o an trimmlerout f grom bottom to Non-Water Supply Well: ft. ft. cement. ❑Monitoring ❑Recovery Injection Well: ❑Aquifer Recharge ❑GroundwaterRemediation a tf`fe ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERiAI. EMPLAC$MRNT METHOD 0 ft, ft. ❑Aquifer Test ❑StonnwaterDrainage ft. ft. ❑Experimental Technology ❑Subsidence Control ' ❑Geothemhal(Closed Loop) ❑Tracer FROM To DESCRIPTION color,hardn anil/rock a ft etc. ❑Geothermal(Hcatin Coolin Return) 00ther(explain under#21 Rcmattts 0 ft. 25 ft. ! red clay 5 4/2021 26 ft, 175 lt. saperlite 4.Date Well(s)Completed: 176 ft- 200 ft- granite 5.Well Location: 201 rt. 300 ft. granite earnest estates ft. ft. Facility/Owner Name Facility lD#(if applicable) ft. ft. 7678 Katherine Dr Denver nc fr. rt. Physical Address,City,and Zip - Lincoln County Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (if wall field,one lat/long is sufficient) 35030'58.4784" N 80059'42.2304"1 W " 5/7/2021 Signature of Certified Well Contractor i Date 6.Is(are)the wermanent or ❑Temporary By signing this fonm,I hereby certify that 4he wells)was(were)cotuttucted in accordance 140ewith 15A NCAC 02C.0100 or 15A NCAC 02C..0200 Nell Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes 00NO I copy of this record has been provided to the well owner. If this is a repair,fill out known well construction information and explain the t),ature of the repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well S.Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the Sadie construction,you can submit one fond. 24.Submittal Instructions: 9.TOUtI well depth below land surface; 300 (ff.) 24a. For AR Wells: Submit this firm within 30 days of completion of well ror multiple wells list all depths(f dilJerem(example-3@200'and 2@ 1001 I construction to the.following: 10.Static water level below top of casing: 30 (ft.) Division of Writer Quality,Ulforuuttion Processing Unit, If water level is above,casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 � i i 11.Borehole diameter: 6 (in.) 24b.For Injection Wells: In addition to sending the foim to the address in 24a above, also submit a copy Of this form within 30 days of completion of well 12.Well construction method: air rotary ! construction to the following: (i.e.auger,rotary,cable,direct push,etc.) I Division of Water Quality,Underground'`Injection Control Program, 13.FOR WATER SUPPLY WELLS ONLY: 1636 if Service Cent'I Raleigh,NC 27699-1636 13a Yield(gpro) 15 Method of test: all lift 24c.For Water Sumrly&C,eo(berm Ai Weila: In addition to sending the fond to the addtess(es)above, also submit one copy of this form within 30 days of 13b.Disinfection type: hth Amount: 20o ices completion of well construction to the county health department of the county where constructed. 4 Form GW-1 North Carolina Department of Environment and Natural Resources-Division of Water Qua o lity Revised Jan.2013 I ,