Loading...
HomeMy WebLinkAboutGW1-2021-02388_Well Construction - GW1_20210727 .rllt WELL CONSTRUCTION'ik' E ORD GW-1 For Internal Use Only: I.Well Contractor Information: 94i�4A'EMZ0NlfS MFROMTO DESCRIPTION Well Contractor Name . ,. ,tft.a�-�-� . ftNC Wcll ContraMor Certification Number ItCASRfer TO DIAMETER THICKNESS MATERIAL ft in. Company Name 1 lg; WCASIN 2.Well Construction Permit#: ' b 'L FROM TO DIAMETER THICKNESS MATERIAL PP •� ry• t I ft ft ?� to Kj List all applicable well construction permits r.Ul .County.State.Variance.etc.) ft ft in. 3.Well Use(check well use): Water Supply Well: F i a7:SCREEN: , PP Y �;� FROM I TO I DIAMETER I SLOT SIZE I THICKNESS It MATERIAI. Agricultural unicipal/Public ft ft. in. ! Geothermal(Heating/Cooling Supply)' idential Water Supply(single) fc. ft. in Industrial/Commercial esidential`Nate,Supply(shared) i8:GROUT. ` .Irrigation i I FROM I TO MATERIAL EMPLACEMENT METHOD /&AMOUNT Non-Water Supply Well: ',I ft. ft Monitoring j ecovery ft. ft' Ad16A Injection Well: ft, fr. Aquifer Recharge i round-watcr Rcmediation l9:SANWGRAVELPAIMflifaMicsible i; Aquifer Storage and Recovery i alinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD Aquifer Test `i tormwater Drainage ft fr' Experimental Technology 1 [3 ubsidence Control ft. ft 26:'It1CIIZiING.I OG!'iiriadidiHts'Le7f Geothermal(Closed Loop) ❑ racer "... FROM TO DESCRIPTION(color.hardness.soiVroek type.grain Sim etc.)Geothermal(Heating/Coo ling Return);' n ther(explain under#21 Remarks) ft ft. 4.Date Well(s)Completed: 7 4L'ii Well ID# ft ft. . �I ft Sa.Well Location: , vr. L M6ay ;� f.t. fL I; Facility ID# ifa applicable) ft. fr Facility/Owner Name ry (• PP• ' 1 fL ft JUL IJ • i�' .01 Ph cal Address,City,and Zip p(OCeSBICI(� /'j 1 � 'tl:sREhIARKS ' t G: Coun;1 k 1 Parcel Identification No.(PIN) County ` i 5b.Latitude and longitude in degrees/In[nut /seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certification: 3 ' �� , K, 6.Is(are)the well(s) Permanent oil I emporary Signature of Certified Well Contractor Date 1 By signing this form,I hereby certi�•that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: by or No with 15.4 NCAC 02C.0100 or 15.4 NCAC 02C.0200 Well Construction Standards and that a Ifthis is a repair,fill out knoKrt well constructioA info ration and explain the nature of the copy of this record has been provided to the wek ner. repair under#21 remarks section or out the back bf thi form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop G6oth mal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-I is needed. IndtCate OTAL NUMBER of wells construction details. You may,also attach additional pages if necessary. drilled: - SUBMITTAL INSTRUCTIONS 1 9.Total well depth below land surface:!! Z6 -(fit-) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if different(exali�ple- 100'atul?@I001 construction to the following: 10.Static water level below top of eosin&; (ft.) Division of Water Resources,Information Processing Unit, If water level is above casing,use"+" i 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: (i ) 24b.For Iniection Wells: In addition to§obdifig the form to the address in 24a I; L above,also submit one copy,of this form£within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) 1 Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY:I 1636 Mail Service Center,Raleigh,NC 27699-1636 132.Yield(gpm)�i D ietho I of test: YY 24c.For Water SuoDly&Iniection Wells: In addition to sending the form to the address(es) above, also Isubmit one copy of this form within 30 days of 13b.Disinfection type: A mount: I w completion of well construction to the county health department of the county where constructed. Form GW-1 Nth Carolina Department of Environmental Quality-Division of water Resources Revised 2-22-2016