Loading...
HomeMy WebLinkAboutGW1-2021-02375_Well Construction - GW1_20210723 I J� P� ems. i - WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.Well C tor Info 'o q��I �1 14.WATERZONES'::=`.' FROM TO DESCRIPTION Well Co acto ame \ C) 'a � \\l ft ft I ct J� r r r L Z,On 15:'OUTER CASING.for multi=rased`wells'OR NC Well Contractor Certification Number 4 I I t yE, LTNER if a' licatile=•�'.:._:_`>.,.:.. Morgan Well & Pump, Inc. ���c� L�Z ' FROM TO ( DIAMETER THICKNESS MATERIAL +1 ft ft 61/8/ j in sd21 pvc Company Name ,/� J[CINNER CASING ORTUBING`'eothei mal'.dosed=lod' 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State,Variance,etc.)- ft ft in. 3.Well Use(check well use): ft ft in. iZ:'.SCREEN '. V. ............. Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL Agricultural �Municipal/Public ft. ft �• J Geothermal(Heating/Cooling Supply) *Residential Water Supply(single) ft. ft in. Industrial/Commercial �Residential Water Supply(shared) 18.GROUT..*_`.. — Iln ation FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft 20 ft bentonite poured Monitoring QRecovery ft ft Injection Well: ft ft Aquifer Recharge Groundwater Remediation .19:SAND/GRAVEL'PACK if a livable)* Aquifer Storage and Recovery Salinity Barrier FROM To MATERIAL EMPLACEMENT METHOD' _I Aquifer Test [3Stormwater Drainage ft ft Experimental Technology OSubsidence Control ft ft - Geothermal Geothermal(Closed Loop) Tracer 12b.DRELLING {aita'di sh'eats` .LOG' 'sdditioiial :if ueces )','_ FROM TO DESCRIPTION(color,hardness,sail/rock type, rain size,etc Geothermal(HeatingLCooling Retum) i Other(explain under#21 Remarks) 0 ft �C ft 4.Date Well(s)Completed: Well ID# ft ft. R' tt� 5a.Well Location: ft. ® ft. 0 ft VtO ft- Facility/Owner Name Facility ID#(if applicable) ft ft ly f� � l� � ��� ft ft al Address,City,and Zip ft ft ".:11'REN ARKRj'_':=_-; County Parcel Identification No.(PIN) Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) p Jg tie . 6.Is(are)the well(s)&Permanent or OTemporary ified Well Contractor at form,I hereby cer fify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: OYes or MNo C 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a If this is a repair,fill out known well construction information and explain the nature of the copy of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well'details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to,provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface:2D (ft•) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ifdifferent(example-/3Q200'a»d 2Q100� construction to the following: 10.Static water level below top of casing: (ft) Division of Water Res oul ces,Information Processing Unit, If water level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 n.) 24b.For Iniection Wells: In addition to sending the form to the address in 24a above,also submit one copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,a c.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test: air pressure 24c..For Water Supply&Injection Wells: In addition to sending the form to 13 the address(es) above, also submit one copy of this form within 30 days of 13b.Disinfection typ kUra� Amount: completion of well construction to the county health department of the county where constructed. I Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016