Loading...
HomeMy WebLinkAboutNC0004774_Compliance Evaluation Inspection_20220221ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director Kristopher C. Eisenrieth General Manager 1385 Dukeville Road Salisbury, NC 28146 NORTH CAROLINA Environmental Quality February 21, 2022 SUBJECT: Compliance Evaluation Inspection Buck Combined Cycle Station NPDES Permit NC0004774 Rowan County, NC Mr. Eisenrieth: On February 15, 2022, Roberto Scheller of this Office conducted a compliance evaluation inspection (CEI) at the subject facility. This inspection was conducted to ensure compliance with permit requirements and conditions. The subject facility appeared to be well operated and maintained. We wish to thank the operating staff for their assistance regarding this inspection. The enclosed report should be self-explanatory; however, should you have any questions, please contact myself or Roberto Scheller at (704) 235-2204 or roberto.scheller@ncdenr.gov. Sincerely, DocuSigned by: 4+4414w H P4444 F161 FB69A2D84A3... for W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosure: Compliance Evaluation Inspection Report cc: Laserfiche Dap®rUnont of EnNrppnpr tal Ouant_NORTH CAROLINA North Carolina Department of Environmental Quality 1 Division of Water Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704.663.1699 United States Environmental Protection Agency E PA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code 1 IN I 2 IL 21IIIIII NPDES yr/mo/day Inspection I 3 I NC0004774 111 121 22/02/15 117 Type 1810I IIIIIIIIIII Inspector Fac Type 19I S I 2011 IIIIIIIIIII IIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 I 70I3 I 711 1 72 I N I 73I 1 74 71 I I I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES Dermit Number) Buck Steam Station 1555 Dukeville Rd Salisbury NC 28146 Entry Time/Date 09:53AM 22/02/15 Permit Effective Date 20/08/01 Exit Time/Date 12:12PM 22/02/15 Permit Expiration Date 23/10/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Dale Wooten/ORC/704-630-3086/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Bristol Grohol, /Engineer 1/980-373-2693/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran Facility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signa Roberto Scheller ure(s) of Inspector(s) Agency/Office/Phone and Fax Numbers DocuSigned by: (-444,tto. 5 4_, DWR/MRO WQ/707-235-2204/ Date 2/21/2022 "-91 C2A007838943E... Signature of Man teolawiewer Agency/Office/Phone and Fax Numbers Date :ark 4I HP 2.21.22 FlFlFgagn9nneoz EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 31 NPDES yr/mo/day N C 0004774 111 121 22/02/15 I17 Inspection Type 18 [j (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The current NPDES Permit # NC004774 became effective November 1, 2018 and expires on October 31, 2023. Please note that renewals shall be received at least 180 days prior to expiration of a permit. Review of compliance history, during 12 month period of 2021, found facility did not report any permit limit violations during the review period. Records review found information well kept and readily available. Laboratory review noted that permitted facility has a Laboratory Field Certification #5151 to perform onsite analysis for pH and Temperature. Meter calibration record for pH meter was current with thermometer on pH meter checked against NIST thermometer annually. Facility uses contract lab Duke Environmental, Pace Analytical Services, LLC, and ETS conducts toxicity testing. During the site inspection the following Outfalls were reviewed: Outfall #001A - Flow >15 gpm, effluent clear with no visible suspended solids. No foam or floating solids were noted at point of discharge. Outfall #007 - Discharge flow 0.5 MGD, effluent clear with no visible suspended solids. Slight amount of foam was being generated at discharge point but disipated 20-30 feet from discharge point. Outfall #111 (Seep)- No dischaged at time of inspection. Outfall #117 (Seep)- Flow <1 gpm, effluent clear with no visible suspended soilds. Stormwater Outfall #SW - 001 No Flow Stormwater Outfall #SW - 7 - No Flow Stormwater Outfall #SW - 8 - No Flow Discharge is to the Yadkin River (High Rock Lake) Stream Classification WS-V in the Yadkin -Pee Dee River Basin, Sub -Basin 03-07-06/03040102. Page# 2 Permit: NC0004774 Inspection Date: 02/15/2022 Owner - Facility: Buck Steam Station Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new MODE application? Is the facility as described in the permit? • ❑ ❑ ❑ # Are there any special conditions for the permit? • ❑ ❑ ❑ Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑ Comment: Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: Laboratory Are field parameters performed by certified personnel or laboratory? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE Page# 3 Permit: NC0004774 Inspection Date: 02/15/2022 Owner - Facility: Buck Steam Station Inspection Type: Compliance Evaluation Laboratory Yes No NA NE Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable DOME Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Flow Measurement - Influent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ Yes No NA NE • ❑ ❑ ❑ Page# 4