Issue Date: April 9, 2014
Nit _ YfVi;ii: "< `.:+ \ i�r ? Comment Deadline: April 24, 2014
Corps Action ID Number: SAW- 2010 -01848
C NOTICE
The Wilmington District, Corps of Engineers (Corps) received an application from
Standard Pacific of the Carolinas, LLC seeking Department of the Army authorization to
modify an existing standard permit with additional impacts to 0.0318 acres of
jurisdictional riparian wetlands, and 137 linear feet of jurisdictional intermittent stream
channel, associated with phases 2, 2c, and 3 of the Salem Village subdivision located in
Wake County, North Carolina. Total impacts for the project are 643 linear feet of
permanent stream channel impacts, 69 linear feet of temporary stream channel impacts,
0.325 acres of permanent wetland impacts, and 0.057 acres of temporary wetland
impacts.
Specific plans and location information are described below and shown on the attached
plans. This Public Notice and all attached plans are also available on the Wilmington
District Web Site at
http: / /www.saw.usace.army.miI /Missions /Re ulatoryPermitProgram aspx
Applicant: Standard Pacific of the Carolinas, LLC
Attn: Grey Methven
1600 Perimeter Park, suite 125
Morrisville, NC 27560
AGENT: Soil and Environmental Consultants, PA
Attn: Bob Zarzecki
8412 Falls of Neuse Rd., suite 104
Raleigh, NC 27615
Authority
The Corps evaluates this application and decides whether to issue, conditionally issue, or
deny the proposed work pursuant to applicable procedures of the following Statutory
Authorities:
® Section 404 of the Clean Water Act (33 U.S.C. 1344)
❑ Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403)
❑ Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972
(33 U.S.C. 1413)
Location
Directions to Site: The project, Salem Village subdivision, is approximately 195 acres
and is bordered to the north and west by South Salem Street, and to the east by Tingen
Road, in the Town of Apex, Wake County, North Carolina. Coordinates (in decimal
degrees) for the site are 35.7136° North, - 78.86470 West. The site is located in the Cape
Fear River Basin (8 -Digit Cataloging Unit 03030004).
Project Area (acres): 195 Nearest Town: Apex
Nearest Waterway: Big Branch River Basin: Cape Fear
Latitude and Longitude: 35.7136N, - 78.8647W
Existing Site Conditions
The land use in the immediate area surrounding the project consists primarily of
agricultural fields, and forested tracts, and residential homes. The site itself is currently
under constriction as the Salem Village subdivision.
Applicant's Stated Purpose
As stated by the applicant, the purpose of the project is to complete the constriction of
the Salem Village subdivision, in order to provide residential housing for the area.
Project Description
The original permitted project includes fill associated with the constrictions of road
crossings for the Salem Village subdivision as follows. Previously approved
authorizations for the Salem Village subdivision included 121 linear of permanent stream
channel impacts, 7 linear feet of temporary stream channel impacts, 0.236 acres of
permanent wetland impacts, and 0.057 acres of temporary wetland impacts authorized on
November 12, 2010. Three bridges were also approved for the Apex Peakway stream
crossings in the 2010 authorization. One bridge was determined to be cost prohibitive
and the Corps indicated that a Department of the Army (DA) Individual Permit would be
required. On October 24, 2012 a DA Individual Permit was issued for permanent
placement of fill material into 385 linear feet (If) of stream channel fill (impact twelve -
148 If previously permitted but not completed, and impact fourteen - 2371f of proposed
new impacts) and temporarily impact 62 linear feet of unnamed tributaries to Big Branch
for the constriction of two road crossing, and utility line installation for the Salem
Village subdivision. The project would include a section of the Apex Peakway from
Tingen Rd. to Salem Street and permanently impact 0.057 acres of wetland from fill for
2
the constriction of road crossings. Total permanent impacts for the project to date are
506 linear feet of permanent stream channel impacts, 69 linear feet of temporary stream
channel impacts, 0.293 acres of permanent wetland impacts, and 0.057 acres of
temporary wetland impacts.
The applicant is now proposing an additional 137 linear feet of permanent stream channel
impacts, and an additional 0.0318 acres of riparian wetland impacts for two additional
roads crossing for the final phases 2, 2c, and 3 of the Salem Village subdivision.
Compensatory Mitigation
The applicant offered the following compensatory mitigation plan to offset unavoidable
functional loss to the aquatic environment: Compensatory mitigation requirements for
previously permitted impacts have been met. At this time no additional compensatory
mitigation has been proposed.
Essential Fish Habitat
Pursuant to the Magnuson- Stevens Fishery Conservation and Management Act, this
Public Notice initiates the Essential Fish Habitat (EFH) consultation requirements. The
Corps' initial determination is that the proposed project
may affect, but not likely to adversely affect EFH or associated fisheries managed by the
South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine
Fisheries Service.
Cultural Resources
Pursuant to Section 106 of the National Historic Preservation Act of 1966, Appendix C of
33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C,
the District Engineer consulted district files and records and the latest published version
of the National Register of Historic Places and initially determines that:
❑ Should historic properties, or properties eligible for inclusion in the National
Register, be present within the Corps' permit area; the proposed activity requiring
the DA permit (the undertaking) is a type of activity that will have no potential to
cause an effect to an historic properties.
® No historic properties, nor properties eligible for inclusion in the National
Register, are present within the Corps' permit area; therefore, there will be no
historic properties affected. The Corps subsequently requests concurrence from
the SHPO (or THPO).
❑ Properties ineligible for inclusion in the National Register are present within the
Corps' permit area; there will be no historic properties affected by the proposed
work. The Corps subsequently requests concurrence from the SHPO (or THPO).
❑ Historic properties, or properties eligible for inclusion in the National Register,
are present within the Corps' permit area; however, the undertaking will have no
adverse effect on these historic properties. The Corps subsequently requests
concurrence from the SHPO (or THPO).
❑ Historic properties, or properties eligible for inclusion in the National Register,
are present within the Corps' permit area; moreover, the undertaking may have an
adverse effect on these historic properties. The Corps subsequently initiates
consultation with the SHPO (or THPO).
❑ The proposed work takes place in an area known to have the potential for the
presence of prehistoric and historic cultural resources; however, the area has not
been formally surveyed for the presence of cultural resources. No sites eligible
for inclusion in the National Register of Historic Places are known to be present
in the vicinity of the proposed work. Additional work may be necessary to
identify and assess any historic or prehistoric resources that may be present.
The District Engineer's final eligibility and effect determination will be based upon
coordination with the SHPO and /or THPO, as appropriate and required, and with full
consideration given to the proposed undertaking's potential direct and indirect effects on
historic properties within the Corps - indentified permit area.
Endangered Species
Pursuant to the Endangered Species Act of 1973, the Corps reviewed the project area,
examined all information provided by the applicant and consulted the latest North
Carolina Natural Heritage Database. Based on available information:
® The Corps determines that the proposed project would not affect federally listed
endangered or threatened species or their formally designated critical habitat.
❑ The Corps determines that the proposed project may affect federally listed
endangered or threatened species or their formally designated critical habitat.
The Corps initiates consultation under Section 7 of the ESA and will not
make a permit decision until the consultation process is complete.
❑ The Corps is not aware of the presence of species listed as threatened or
endangered or their critical habitat formally designated pursuant to the
Endangered Species Act of 1973 (ESA) within the project area. The Corps will
4
make a final determination on the effects of the proposed project upon additional
review of the project and completion of any necessary biological assessment
and /or consultation with the U.S. Fish and Wildlife Service and /or National
Marine Fisheries Service.
Other Required Authorizations
The Corps forwards this notice and all applicable application materials to the appropriate
State agencies for review.
North Carolina Division of Water Resources ( NCDWR): The Corps will generally not
make a final permit decision until the NCDWR issues, denies, or waives the state
Certification as required by Section 401 of the Clean Water Act (PL 92 -500). The receipt
of the application and this public notice, combined with the appropriate application fee, at
the NCDWR Central Office in Raleigh constitutes initial receipt of an application for a
401 Certification. A waiver will be deemed to occur if the NCDWR fails to act on this
request for certification within sixty days of receipt of a complete application. Additional
information regarding the 401 Certification may be reviewed at the NCDWR Central
Office, 401 and Buffer Permitting Unit, 512 North Salisbury Street, Raleigh, North
Carolina 27604 -2260. All persons desiring to make comments regarding the application
for a 401 Certification should do so, in writing, by April 30, 2014 to:
NCDWR Central Office
Attention: Ms. Karen Higgins, 401 and Buffer Permitting Unit
(USPS mailing address): 1650 Mail Service Center, Raleigh, NC 27699 -1650
Or,
(physical address): 512 North Salisbury Street, Raleigh, North Carolina 27604
North Carolina Division of Coastal Management (NCDCM):
❑ The application did not include a certification that the proposed work complies
with and would be conducted in a manner that is consistent with the approved
North Carolina Coastal Zone Management Program. Pursuant to 33 CFR 325.2
(b)(2) the Corps cannot issue a Department of Army (DA) permit for the
proposed work until the applicant submits such a certification to the Corps and
the NCDCM, and the NCDCM notifies the Corps that it concurs with the
applicant's consistency certification. As the application did not include the
consistency certification, the Corpswill request, upon receipt„ concurrence or
objection from the NCDCM.
® Based upon all available information, the Corps determines that this application
for a Department of Army (DA) permit does not involve an activity which would
affect the coastal zone, which is defined by the Coastal Zone Management (CZM)
Act (16 U.S.C. § 1453).
Evaluation
The decision whether to issue a permit will be based on an evaluation of the probable
impacts including cumulative impacts of the proposed activity on the public interest.
That decision will reflect the national concern for both protection and utilization of
important resources. The benefit which reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative effects
thereof, among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain
values (in accordance with Executive Order 11988), land use, navigation, shoreline
erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property
ownership, and, in general, the needs and welfare of the people. For activities involving
the discharge of dredged or fill materials in waters of the United States, the evaluation of
the impact of the activity on the public interest will include application of the
Environmental Protection Agency's 404(b)(1) guidelines.
Commenting Information
The Corps of Engineers is soliciting comments from the public; Federal, State and local
agencies and officials, including any consolidated State Viewpoint or written position of
the Governor; Indian Tribes and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the
Corps of Engineers to determine whether to issue, modify, condition or deny a permit for
this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects and the other
public interest factors listed above. Comments are used in the preparation of an
Environmental Assessment (EA) and /or an Environmental Impact Statement (EIS)
pursuant to the National Environmental Policy Act (NEPA). Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider the application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. Requests for a
public hearing shall be granted, unless the District Engineer determines that the issues
raised are insubstantial or there is otherwise no valid interest to be served by a hearing.
The Corps of Engineers, Wilmington District will receive written comments pertinent to
the proposed work, as outlined above, until 5pm, April 24, 2014. Comments should be
submitted to James Lastinger, Regulatory Specialist,Raleigh Regulatory Field Office,
3331 Heritage Trade Drive, Suite 105 ,Wake Forest, North Carolina 27587, at (919) 554-
4884 ext 32.
6
--------------- - - -
Ejj7
jAtylS
o —um
EEi
--t J
77
-------- - - ------ ca
PFj
f F�—
WE
-7i
kz-
R
9V
mum
OEMyi
!z
FS
LP
aP'a 55
R
9V
mum
C>N/FFI,A,LL
z.
PA, 5
M -R
EE
9 iq 3
f 2N 1 A A 1:6
zw;
v L 0 z, 0 d c v
OEMyi
!z
LP
C>N/FFI,A,LL
z.
PA, 5
M -R
EE
9 iq 3
f 2N 1 A A 1:6
zw;
v L 0 z, 0 d c v
LEGEND
STREAM IMPACT
/ '/ / / / / 3'q
4y,
wx
10 2014,
N
54" RCP
CULVERT
INTERMITENT
.4"
9REAM
7
IMPACT #1
lk sr
RIP-RAP ENERGY
DISSIPATER 41
zR
OK
BLIP #1
Action Id: SAW-2010 01848
Applicant: Standard Pacific
O
z" N of the Carolinas, LLC LO
Project Name- Salem Village Subdivision U-) I
Sheet 2 of 4
PERMANENT IMPACTS
WITHERS &— RAVENEL
ENGINEERS I PLANNERS I SURVEYORS
E
8
0
IMPACT #12
PERMANENT WETLAND IMPACT
1,706 SF ( 0.0247 AC)
SALEM VILLAGE
PHASE 2C
• r" a;
r;
III'
III'.
11'
-
11 4'
11
•
11
�
_
X11
•
III
f
'BI
■ ■ t�
II
H
f • �
11
11
11
rrl
1f
11
II
11
11
11
- 11
11
IMPACT #12
PERMANENT WETLAND IMPACT
1,706 SF ( 0.0247 AC)
SALEM VILLAGE
PHASE 2C
IMPACT #13
PERMANENT WETLAND IMPACT
1,385 SF (0.0318 AC)
SALEM VILLAGE 11 IMPACT #13 �11 WITHERS & VENEL
PHASE 2C eacinaeas s PLeexnaas i suavavoas