HomeMy WebLinkAbout20061277 Ver 1_Monitoring Report_20140327Brock Stream Restoration Site EEP Project No. 92333 USACE 404 Certification (Action ID #SAW- 2007 - 199 -152) DWQ 401 Certification (2006 -1277) CLOSEOUT REPORT Project Type: Coastal Plain Stream, Riparian Buffer & Nutrient Offset Buffer Restoration February 2014 Table 1a. Project Setting and Classifications Brock Stream Restoration Site County: Jones General Location: Trenton, NC Basin: Tar - Pamlico Ph sio ra hic Region: Outer Coastal Plain Ecore ion: Carolina Flatwoods USGS Hydrological Unit: 03020204 - 010060 NCDWR Sub - basin: 03 -04 -11 Wetland Classification: n/a Thermal Regime: Warm Trout Water: No Project Performers Source Agency: EEP Provider: NCDENR EEP Designer: Stantec Consulting Services, Inc. Construction Contractor: Shamrock Environmental Corporation Planting Contractor(s): Natives & HARP Invasive Treatments: HARP Property Interest Holder: NCDOT, Conservation Easement Closeout Report — Brock Stream Restoration Site, Jones County NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 Table 1 b. Overall Project Activities and Timeline Brock Stream Restoration Site Milestone MonthNear Restoration Plan: May 2006 Permitted: January 2007 Final Design — Connt. Plans: Aril 2008 Construction: June 2009 Permanent Seeding: June 2009 Bare -Root Unknown Mitigation Plan /As -Built August 2009 Year 1 Monitoring January 2010 Warranty Planting February 2010 Year 2 Monitoring January 2011 Year 3 Monitoring September 2011 Year 4 Monitoring December 2012 Year 5 Monitoring December 2013 Supplemental Planting March 2013 Invasive treatment June & December 2013 Supplemental Planting March 2014 Invasive treatment June & October 2014 Page 1 1.0 PROJECT SETTING AND BACKGROUND SUMMARY The Project is located north of NC Highway 58 in Jones County, approximately six miles northwest of Trenton and ten miles southeast of Kinston (Figure 1). It is within US Geological Survey Hydrologic Unit 03020204010060 and NC Division of Water Resources ( NCDWR) Sub -basin 03 -04 -11 of the Neuse River Basin. It is situated in an area dominated by agricultural operations and was previously utilized for crop production. Although the Unnamed Tributary (UT) to Big Chinquapin Branch is in its natural valley, it had been somewhat straightened and routinely maintained for agricultural drainage. The DOT purchased a conservation easement on this stream to meet stream and buffer restoration needs. Project implementation included stream restoration by establishing floodplain connectivity and riparian buffer restoration with an average of 75' on either side of the UT. Project restoration efforts provided 1,233 Stream Mitigation Units (SMUs), 270,072 square feet (6.20 acres) of buffer. These amounts are provided in more detail in Section 3.0. 2.0 PROJECT GOALS AND OBJECTIVES Project specific goals at the Brock Site include: • Improvement of water quality by limiting bank erosion; • Enhance 1,850 linear feet of stable stream channel (Stream Enhancement category II); • Restoration of 6.2 acres of riparian buffer along the project reach (4.23 acres associated with the 50 -foot buffer and 1.97 acres associated with the buffer beyond 50 feet); • Improvement of aquatic and terrestrial habitat within the UT to Big Chinquapin Branch; and, • A 40 -foot wide floodplain bench on right stream side in order to dissipate channel flow, serve as a nutrient cycling area between the agricultural field and the stream, and to increase channel stability during moderate to high discharge events. Stream work was limited to right bank due to the location of a historic slave cemetery on the left stream bank. The system of measurement to determine successful implementation includes documentation and caparison of annual cross section surveys, stream hydrology via a crest gage and documentation of vegetation development through permanent 100- meter 2 plots. 3.0 SUCCESS CRITERIA Table 2. Success Criteria Brock Stream Restoration Site Feature Stream Success Criteria Stable conditions at permanently placed cross - sections Condition Criteria Met Hydrology A minimum of two bankfull events documented in separate monitoring years Criteria Met Average of 260 planted woody stems /acre, as indicated by permanent vegetation plots Vegetation after five years of monitoring (SMU credit only). Criteria Met Average of 320 planted woody stems /acre, as indicated by permanent vegetation plots after five years of monitoring (BMU or Nutrient Offset Nitrogen Credit only). The following table denotes the restoration components and summations at the Project. Closeout Report - Brock Stream Restoration Site, Jones County Page 2 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 Ell = Enhancement II, R = Restoration, P3 = Priority Level III, Nutrient Offset calculations are per NCDWR recommendation. Table 4. Mitigation Unit Totals Brock Stream Restoration Site Offset Stream Buffer Buffer or Nutrient 1,233 SMUs 184,258.80 ft2 (4.23 ac) 85,813.20 ft2 (1.97 ac.) Closeout Report — Brock Stream Restoration Site, Jones County Page 3 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 Table 3. Project Restoration Components Brock Stream Restoration Site f r' Reach 1— UT to Big Chinquapin Branch 1,850 Ell P3 1.5:1 1,233 SMUs 0 +00 -28 +50.16 Riparian Buffer (Top of Bank to 50 feet) n/a R n/a 1:1 4.23 ac n/a Riparian Buffer or Nutrient Offset Buffer (50 feet to 200 feet) n/a R n/a 1:1 1.97 ac n/a Ell = Enhancement II, R = Restoration, P3 = Priority Level III, Nutrient Offset calculations are per NCDWR recommendation. Table 4. Mitigation Unit Totals Brock Stream Restoration Site Offset Stream Buffer Buffer or Nutrient 1,233 SMUs 184,258.80 ft2 (4.23 ac) 85,813.20 ft2 (1.97 ac.) Closeout Report — Brock Stream Restoration Site, Jones County Page 3 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 4.� �1 As -Built 8 Baseline Monitoring Plan Kinston April 2010 � - _ Local Roads Major Roads I Railroads vs 11 Site Boundary County Boundary a over Streams Municipality Jas Y MAP COURTESY OFSTANTEC Roy. CONSULTING SERVICES, INC., 2010 a T p U--1 � 2 Br�Pmx*,clt �Sd. S m "tea se m a t ar c' '1"M Rd aiR 1 Trenton N W 1 0 0.5 1 2 3 Miles Directions to the Brock Stream Restoration Site: From Raleigh, take HWY 70 East to Kinston, NC. S The Brock Restoration Site is located approximately 12 miles southeast of Kinston, North Carolina and lies } in northern Jones County. From US 70 East in Kinston turn right on NC 58 and travel approximately 12 miles. The site is located on the left approximately three miles past the beginning of the Pine Street loop (SR 1301). �a VICINITY MAP Brock Stream Restoration Site, Jones County, NC II7'1 01IICIIt E E P Project No. 92333 � November 19, 2013 Closeout Report - Brock Stream Restoration Site, Jones County NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 FIGURE 1 Page 4 PROJECT ASSET MAP Brock Stream Restoration Site, Jones County, NC FIGURE 2 { �4S 7� 1 te111 'Clll�'i E E P Project No. 92333 Ll 181 �� February 18, 2014 Closeout Report — Brock Stream Restoration Site, Jones County Page 5 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 a F33 • hinquap- Cem lag 10 Conservation Easement 5.0 ■ ■o ■ - F . r k a _ Map Source: Terrain Navigator, 2013 N Map Name: Phillips Crossroads, NC Map Type: 7.5-minute Quadrangle W E Map Scale: 1:24,000 t S USGS TOPOGRAPHIC MAP t�Ip Brock Stream Restoration Site, Jones County, NC 1' 1 ]tl] C]I1C11� EEP Project No. 92333 February 17, 2014 Closeout Report — Brock Stream Restoration Site, Jones County NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 to Brunc' l� F 0 e�w FIGURE 3 Page 6 Closeout Report — Brock Stream Restoration Site, Jones County Page 7 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 f R 5 fT y� F f Symbol Soil Map Unit Name Gt Grifton fine sandy loam GOA Goldsboro loamy 0 to 2% Mapping W E sand, slopes Mk Muckalee loam NOB Norfolk loamy sand, 1 to4 %slopes Not ToScale Map Source: S www. websoi[survey.sc.egov.usda.gov/ [� Soils Map k:0systel11 Brock Stream Restoration Site, Jones County, NC FIGURE 4 a EEP Project No. 92333 February 17, 2014 Closeout Report — Brock Stream Restoration Site, Jones County Page 7 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 Brock Site Cross Section Comparison Charts XSC #1 - Brock Site Sta.11 +00 42 39 41 - 38 r 40 37 39 36 c ° 35 38 d Bankfu112013 0 37 34 w Bankfu112013 33 OR --- - - - - -- - - -- - - - --- -. 36 _ - 1 32 �:\+ 35 a 31 34 30 0 10 20 30 40 50 60 70 Distance (ft) - t- AsBult 12009 — 2010 +2011 --w-2012 X201?: >i 33 32 Y 0 10 20 30 40 50 60 70 80 90 Oistanee (ft) - +- As -Built +2009 —2010 ♦2011 --.*-2012 X2013 XSC #2 - Brock Site Sta.15 +00 40 39 38 37 36 c ° 35 d Bankfu112013 34 u� rr 33 OR --- - - - - -- - - -- - - - --- -. _ - 32 �:\+ 31 30 0 10 20 30 40 50 60 70 Distance (ft) - t- AsBult 12009 — 2010 +2011 --w-2012 X201?: Closeout Report — Brock Stream Restoration Site, Jones County Page 8 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 Table 5. Verification of Bankfull Events Brock Stream Restoration Site XSC #3 - Brock Site Sta.23 +00 35 -, Method Calculated Bankfull Elevation 34 1) (if available) 10/24/2009 , Crest gage 14 inches 35 inches Not available 11/13/2010 7/4/10, 9/27/10 thru 10/1/10 Crest gage 14 inches 40 inches Not available 7/7/2011 4/27/11 thru 4/29/11 Crest gage 14 inches 15 inches Not available f 33 8/16/2012 7/21/12 thru 7/25/12 Crest gage 14 inches 30 inches Not available (assumed) 7/9/13 thru 7/14/13 32 1 8/2/13 through 8/4113 Crest gage 14 inches 18 inches Not available 8/11/13 through 8/18/13 c (assumed) 0 - i ` Bankfu112013 u' 31 30 +r. -- - - - - - -- ------ , 28 0 10 20 30 40 50 60 70 80 Distance ft -+ -As -Built 12009 (2010 —* -2011 — 2012 - -- 2013 Table 5. Verification of Bankfull Events Brock Stream Restoration Site Date of Data Collection •. Occurrence Method Calculated Bankfull Elevation Measured High Water Elevation 1) (if available) 10/24/2009 Unknown Crest gage 14 inches 35 inches Not available 11/13/2010 7/4/10, 9/27/10 thru 10/1/10 Crest gage 14 inches 40 inches Not available 7/7/2011 4/27/11 thru 4/29/11 Crest gage 14 inches 15 inches Not available (assumed) 8/16/2012 7/21/12 thru 7/25/12 Crest gage 14 inches 30 inches Not available (assumed) 7/9/13 thru 7/14/13 11/22/2013 8/2/13 through 8/4113 Crest gage 14 inches 18 inches Not available 8/11/13 through 8/18/13 (assumed) A minimum of five bankfull events were documented over the five year monitoring period with at least one event occurring in each monitoring year. Closeout Report — Brock Stream Restoration Site, Jones County Page 9 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 Table 6. Cross Section Comparisons Brock Stream Restoration Site --T Cross Section #1 Cross Section #2 Cross Section #3 Attribute Station 11 ii ii ii Monitoring Year 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 Bankfull area (sq. feet) 7.2 4.6 5.7 6.4 6.2 6.9 6.4 7.7 7.5 6.7 7.2 4.6 3.7 3.7 3.3 Bankfull width (feet) 8.7 7.8 7.8 8.2 7.7 8.3 8.0 8.8 9.6 7.5 9.0 9.3 7.9 7.9 7.9 Bankfull mean depth 0.8 0.6 0.7 0.8 0.8 0.8 0.8 0.9 0.8 0.9 0.4 0.5 0.5 0.5 0.4 feet Bankfull max depth 1.4 0.9 1.0 1.1 1.1 1.4 1.4 1.5 1.6 1.5 0.7 0.9 0.8 0.7 0.7 feet Width -depth ratio 10.5 13.2 10.8 10.5 9.5 9.9 10.0 10.0 12.3 8.4 82.3 18.6 17.0 16.7 19.3 Flood prone area width 52.4 44.3 48.0 49.9 48.3 49.9 49.2 49.8 50.0 49.5 51.0 52.1 50.6 49.7 49.3 feet Entrenchment ratio 6.0 5.7 6.1 6.1 6.3 6.0 6.2 5.6 5.2 6.6 1.8 5.6 6.4 6.3 6.2 Low bank height ratio 1.0 1.0 1.4 1.3 1.0 1.1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Vegetation Data Summary Stem counts were conducted within four strategically placed 10 -meter by 10 -meter plots. The plots were located based on a representative sample of the entire area of disturbance. They are scattered throughout the Project Site in order to cover the majority of the habitat variations. Vegetation Plots #1, #2 and #4 are related to stream and buffer mitigation credit and occur within the 50 -foot buffer of the channel. Vegetation Plot #3 is outside of the 50 -foot zone and falls under either buffer mitigation credit or Nutrient Offset Nitrogen Reduction credit. A total of two supplemental plantings were conducted at the Brock site. In March 2013, an additional 840 containerized hardwood trees were installed due to low vigor. In March 2014, an additional 50 bareroot hardwood trees were installed due to a minor landowner encroachment. The chart below provides a summary of the vegetation counts within plots as of March 2014. All vegetation plots met the success criteria required for buffer mitigation or Nutrient Offset Nitrogen credit, as well as the success criteria for stream mitigation credit. Vegetation Total Stem Count/ Acre Planted Stem Planted, Hardwood Stem Count/ Acre Plot No. (SMU Credit) Count/ Acre (BMU or Nutrient Offset N Credit) 1 1,295 688 688 2 364 364 364 3 n/a 323 323 4 647 323 323 Note that the March 2014 planting took place after the MY5 vegetation counts, therefore, are not reflected in Table 9 on the following page. Closeout Report - Brock Stream Restoration Site, Jones County Page 10 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 APPENDIX A. Table 9. CVS Plot Summary Data EEP Project Code 92333. Project Name: Brock Stream Restoration Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% 92333 -ALC -0001 92333 -ALC -0002 92333 -ALC -0003 92333 -ALC -0004 MY5 (2013) MY4 (2012) MY3 (2011) MY2 (2010) MY1 (2009) MYO (2009) PnoLS P -all T PnoLS P -all T PnoLS P -all T Pnot-S P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T Acernegundo boxelder 1 1 1 Baccharis hatimifolia eastern baccharis 7Shrub 1 Clethra alnifolia coastal sweetpepperbush Shrub 2 2 2 Cornus foemina stiff dogwood 4 4 Fraxinus pennsylvanica green ash Tree 14 14 14 2 2 2 16 16 16 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 Linodendron tulipifera tuliptree Tree 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 Morella cerifera wax myrtle shrub 2 2 Platanus occidentatis American sycamore Tree 3 3 3 4 4 4 1 1 1 4 4 4 12 12 12 12 12 12 11 11 11 11 11 11 9 9 9 14 14 14 Quercus oak Tree 1 1 1 1 1 1 Quercus michauxii swamp chestnut oak Tree 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 6 6 6 7 7 7 7 7 7 Quercus nigra water oak Tree 1 1 1 4 4 4 4 4 4 4 4 4 4 4 4 Quercus pagoda cherrybark oak Tree 2 2 2 2 2 2 3 3 3 5 5 5 4 4 4 1 1 1 1 1 1 Quercus phellos willow oak Tree 3 3 3 1 1 1 4 4 4 9 10 10 8 9 9 6 7 7 6 7 7 9 10 10 Salix nigra black willow Tree 13 1 2 7 1 2 20 1 2 48 1 2 26 1 2 20 4 Ulmus elm Tree 1 Ulmus americana American elm Tree 2 2 Unknown Shrub or Tree 3 3 Stem count size (ares) size (ACRES) Species count Stems per ACRE 17 17 32 9 9 9 6 6 6 8 9 16 40 41 63 46 48 95 50 52 78 48 50 70 45 46 50 55 63 63 1 1 1 1 4 4 4 4 4 4 0.02 0.02 0.02 0.02 0.10 0.10 0.10 0.10 0.10 0.10 2 2 4 3 3 3 4 4 4 4 4 5 7 1 7 9 8 8 1 9 8 8 10 8 8 10 8 8 9 9 11 11 687.966 687.966 1294.99 364.217 364,2171 364.2171242.8111 242.8111 242.811 323.749 364.217 647.497 404.686 414.803 637.38 465.3881 485.623 961 . 1281505.8571 526.091 789.137 485.623 1505.8571 708.2 455.271 465.388 505.857 556.4431 637.38 637.38 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Table 8. Monthly Rainfall Data in Inches Brock Stream Restoration Site Month January ii i 2.77 2010 i 3.38 i i 1.98 i i 3.3 i i 2.29 February 1.19 5 2.57 2.46 6.42 March 5.11 3.14 3.98 4.32 1.1 April 1.92 0.72 4.89 3.1 3.27 May 4.84 2.43 0.52 8.85 3.1 June 7.27 6.15 2.83 2.09 8.39 July 4.36 5.63 2.2 11.43 6.07 August 6.66 3.98 17.65 7.44 8.54 September 3.15 11.91 5.03 2.22 3.64 October 1.09 4.57 6.34 3.77 2.49 November 1 8.35 1 1.12 1 3.54 1 0.59 1 2.83 December 1 9.08 1 2.9 1 0.41 1 4.66 1 4.47 Precipitation Data Comparison 20 18 16 14 12 10 Q 8 6 4 2 0 A 4.0 EEP RECOMMENDATIONS AND CONCLUSIONS Monthly Data 2013 i Monthly Data 2012 Monthly Data 2011 Monthly Data 2010 Monthly Data 2009 -70% 30% E Date a N O z The Brock Stream Restoration Site has demonstrated success in stream and vegetation restoration. All four vegetation plots exceed the buffer mitigation success criteria of 320 planted stems per acre in year five. All three cross sections exhibited continuous stability through all monitoring years and greater than five bankfull occurrences were reported in separate monitoring years. The enhancement of Ut to Big Chinquapin Branch effectively improved water quality through stabilizing stream banks, revegetating a buffer zone greater than 50 feet along the entire stream reach, and promoting nutrient removal by restoring access to a floodplain. EEP recommends closing out this Site with 1,233 proposed Stream Mitigation Units and 270,072 square feet of buffer restoration. 5.0 CONTINGENCIES EEP recommends closing the Brock Stream Restoration Site out with no contingencies Closeout Report - Brock Stream Restoration Site, Jones County Page 10 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 ANNUAL MONITORING PHOTOGRAPH SUMMARY Photostation Number and Year 0 Baseline - Taken July 2009 Year 1 - Taken November 2009 Year 2 - Taken July 2010 Year 3 - Taken July 2011 Year 4 - Taken July 2012 Year 5 - Taken August 2013 Location Closeout Report — Brock Stream Restoration Site, Jones County Paae 13 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 ANNUAL MONITORING PHOTOGRAPH SUMMARY CONTINUED Photostation Number and Year 0 Baseline - Taken July 2009 Year 1 - Taken November 2009 Year 2 - Taken July 2010 Year 3 - Taken July 2011 Year 4 - Taken July 2012 Year 5 - Taken August 2013 Location #11 Facing northeast along the _,,... •. eastern axis of _ Vegetation Plot #4 v 1 x {{ x #12 Facing :. northwest across Vegetation Plot #4 Ago #13 Facing southwest (upstream) along the tributary from Station 28 +25 �p #14 Facing northeast along buffer area associated with tributary from ; 5 Station 28 +25 #15 Facing - southwest from Chinquapin Branch 'e 1 1. Closeout Report — Brock Stream Restoration Site, Jones County Page 15 NCDENR Ecosystem Enhancement Program Prepared by Ecological Engineering, LLP, February 2014 Legend - Vegetation Maintenance Plan Staging Area Brock Site EEP #92333 Supplemental Planting Zones Invasives Mgmt Zone - Jones County Brock CE December 2012 +� Brock—Cemetery 0 87.5 175 350 Feet �# L r L I r ,( L L I L L L L I L IJ L LJJ L L LJ L L LJ L L 6 �J f r I LJ r I L Site access is via dirt farm road off of Highway 58. L f' L - L r -err r.rr�J'��F err', —rrrF rFr ^rrr_� —rrr rt NOTES: Vehicle access to staging area at upper end of project through farm road off of Highway. Vehicle access to both sides of easement area along edge of farm fields. APPENDIX A- Watershed Planning Summary The Brock Stream Restoration Site is not within a watershed planning area. Appendix B. Land Ownership and Protection SITE PROTECTION INSTRUMENT The land required for the construction, management, and stewardship of this mitigation project includes following parcel: Grantor County Site Protection Instrument Deed Book & Page Number Acreage protected Clare Brock Jones Fee simple 291/714 8.066 The conservation easement was recorded at the register of deeds office and is available at the link below: http: / /www.nceep.net /GIS DATA / Brock %20Site %20 %2392333 %20(DOT) /92333 Brock.pdf LONG -TERM MANAGEMENT PLAN Upon approval for close -out by the Interagency Review Team (IRT), the NC Department of Transportation will be responsible for periodic inspection of the site to ensure that restrictions required in the conservation easement are upheld. APPENDIX - C Jurisdictional Determination & Permits U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT ORM ID: SAW- 2007 - 199 -152 County: Jones USGS Quad: Phillips Crossroads GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner / Authorized Agent: NC Ecosystem Enhancement Program Address: 1652 Mail Service Center Raleigh, NC 27699 -1652 Telephone No.: (919) 715 -7571 Size and location of property (water body, road name /number, town, etc.): The Brock restoration site contains 1,850 linear feet of channelized stream through agricultural fields connecting to Big Chinquapin Branch. The site is located off NC 58 approximately 12 miles southeast of Kinston in Jones County, North Carolina. Description of projects area and activity: A new floodplain will be created on one side of the channel by excavating a new floodplain bench The area of excavation will be approximately 100 feet wide by 1,850 feet long. The proposed project will have 6.88 acres of riparian buffer restoration and 0.52 acres of riparian buffer preservation. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 27 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the pennittee to a stop work order, a restoration order and/or appropriate legal action. This verification is valid until the NWP is modified, reissued, or revoked. All of the existing NWPs are scheduled to be modified, reissued, or revoked prior to March 18, 2007. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant nationwide permit is modified or revoked, you will have twelve (12) months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this nationwide permit. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and /or modified, this verification will remain valid until the expiration date identified below, provided it complies with all new and/or modified terms and conditions. The District Engineer may, at any time, exercise his discretionary authority to modify, suspend, or revoke a case specific activity's authorization under any NWP. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733 -1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals /permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact William Wescott at 252- 975 -1616 ext. 31. Corps Regulatory Official , WS Date: 01/23/2007 Expiration Date of Verification: 03/18/2007 Cc: Page 1 of 3 APPENDIX D - Debit Ledger Mitigation Project Name Brock EEP IMS ID 92333 River Basin NEUSE Cataloging Unit 03020204 Annlied Credit Ratins- 1.1 15.1 9.5.1 5.1 1.1 3.1 2.1 5.1 1 1 31 9.1 5.1 1 1 31 9.1 5�1 1 1 311 19.163261 1l1 1 1 Information from EEP Debit Ledger dated 3/12/2014 G NE m ~ O m d E E N m t c C c W Lu Ir C E O v a a° O C A w W E K K p z 0 o O U z E O C z O O z O C .m w . o m N v .E o . °c O 1 N z U CO ' Z Q z i O o t t a a 2 Beginning Balance (feet and acres) 1,850.00 , . 85,813.20 Beginning Balance (mitigation credits) 1,233.33 84,258.80 4,478.01 NCDOT Pre -EEP Debits (feet and acres): NCDOT TIP R -2539 1,453.50 EEP Debits feet and acres): DWQ Permits USACE Action IDs Impact Project Name 2008 -0984 2008 - 02206 -02 5 NCDOT TIP R -2301A - New Bern Bypass 396.50 Riparian Buffer ILF Credit Purchase 184,258.80 Remaining Balance (feet and acres) 0.00 1 0.00 85,813.20 Remaining Balance (mitigation credits) 0.001 1 0.00 4,478.01 Information from EEP Debit Ledger dated 3/12/2014 Mitigation Project Name Brock (Intra- program Purchase) EEP IMS ID 92333 River Basin NEUSE Cataloging Unit 03020204 Comment: This ledger shows the debits for the amount of mitigation that the Riparian Buffer ILF Program purchased from the NCDOT ILF Program. The beginning balance represents the amount purchased and not the total mitigation credits available on the site. Aoolied Credit Ratios: 1:1 1.5:1 2.5:1 5:1 1:1 3:1 2:1 5:1 1:1 3:1 2:1 5:1 1:1 3:1 2:1 5:1 1:1 3:1 1:1 1:1 Information from EEP Debit Ledger dated 3/12/2014 E q N y C E E M N L W £ E N N W c ° E U) ` a K y Er C` o: U c - _6 L R- L W c n W D: ` y ` a o o d Z0' o oR y o U Z `E n m au c o L Z W c o A n d o d Zy L m. c o m`o N N A d o� o. m p mm 41 A U U t m E mu Vl A q L U W L ` o c mi h N ,p ` o o m R Y ` N� uy N IC ._. d L N c m 1 ZO y y N �0 m O y c c Z 0 n t p m L o- Z Beginning Balance (feet and acres) 184,258.80 Beginning Balance (mitigation credits) 184,258.80 NCDOT Pre -EEP Debits (feet and acres): Not Applicable EEP Debits (feet and acres): DWQ Permits USACE Action IDs Impact Project Name 2004 -1055 NCDOT TIP U -3101C Widening of US 1/64 184,258.80 Remaining Balance (feet and acres) 1 0.001 1 Remaining Balance (mitigation credits) 1 0.00 Information from EEP Debit Ledger dated 3/12/2014