VICINITY MAP(N.T.S.)
ITE
GRADING / EROSION CONTROL NOTES
1 CONSTRUCTION ENTRANCE - SEE CDC DETAIL NO. 2.1001
2 SILT FENCE - SEE CDC DETAIL NO. 2.1204
3 SILT FENCE OUTLET - SEE CDC DETAIL NO. 2.1405
Q TEMPORARY DIVERSION BERM AND SWALE - SEE CDC DETAIL NO. 2.1202
e TEMPORARY SKIMMER BASIN -SEE CDC DETAIL NO 2.1610
ADDITIONAL NOTES
1. ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION (7 DAY GROUND COVER)
INDICATED ON COVER SHEET SHALL APPLY TO THIS PLAN ' %' ___ __�______
2. PURSUANT TO G.S. 1 13A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS ' \ l------------------
SHALL �;'
BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY ._-__-___-' � --- - \
VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR \ ------ ----- -
STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 or 14 \---�"-- - ;
CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED \ - �_;'. - -
OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND \ - - - I % \
COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION.
PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER
SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL \\ --------------------
DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS \ --------------
(WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR \ _ -
DEVELOPMENT. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS \ �`--------- ---_.Y �-
NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE \ ^`._- - - -fr, =' �' I\ ;%;'t J \ \
VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATION COVER. IF
ANY SEEDING FAILURE OCCURS, THOSE AREAS SHALL BE RE -SEEDED WITH \ /`., ;---
----
f ---- ,2�\''' f--!' t\ i \ f- �`�\`., \ \\
RYE GRAIN FOR TEMPORARY STABILIZATION AND PREPARED FOR PERMANENT
SEEDING. \ --- f, -r - -,--------
3. SEE DETAIL SHEETS FOR EROSION CONTROL MEASURES & MAINTENANCE.
4. CONTACT PERSON: KEVIN LINDSAY, PE, (910) 920-7661 \ f' `' i j j ; i J`.,'`•�`� \
5. PARCEL IDENTIFICATION NUMBER(S): 0419-50-3525
REID: 0419503525000 -------
6. CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES
ONLY AFTER REMOVAL HAS BE APPROVED BY DENR. -- __-__-_---r' \ 1 ?i 1� ; !� I i ;' \ \
7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING EROSION AND \ -`1, '4 ; DIVERSION BERM AND SWALE 2 \
-- 1 r 1 7 DAY GROUND COVER \ \
SEDIMENTATION CONTROL MONITORING ACCORDING TO NPDES PERMIT \ V '� ��0.�� ( ) \
REQUIREMENTS. A V `� ?j i 1 ! 1 3 v v
8. SEE DETAIL SHEETS FOR TEMPORARY & PERMANENT SEEDING REQUIREMENTS. \ \ -- -_ ---- -- -- _--- _
DWQ Construction General Permit Ground
Stabilization Requirements
Site Area
Stabilization
StabilizationTime
Description
Time Frame
Frame
Exceptions
Perimeter
dikes, swales,
7 days
None
ditches and
slopes
High Quality
Water (HQW)
7 days
None
Zones
If slopes are 10'
or less in length
Slopes steeper
7 days
and are not
than 3:1
steeper than
2:1, 14 days
are allowed
7-days for
Slopes 3:1 or
14 days
slopes greater
flatter
than 50 feet in
length
None (except
All other areas
for perimeters
with slopes
14 days
and HQW
flatter than 4:1
Zones)
* "Extensions of time may be approved by the permitting authority
based on weather or other site -specific condition that make
compliance impracticable." (Sectio 11.13(2)(b))
Construction sequence will be as follows:
1. Obtain all necessary permits and approvals and hold pre -construction conference.
2. Install Gravel Construction Entrance as shown on plans and details.
3. Install Sediment Fence on all downstream slopes as shown on plans and details.
4. Install Silt Fence Outlets as shown on plans as shown on plans and details .
5. Install Skimmer Basins as shown on plans as shown on plans and details.
6. Install Diversion Berms and Swales as shown on plans and details.
7. Establish ground cover on all remaining disturbed areas. Follow fertilizing, seeding,
and mulching listed in details.
8. Once the construction has been completed and the area stabilized and released by
NCDEQ, the temporary erosion control measures shall be removed
Swale Summary
Swale
Minimum
Depth
ft
Bottom
Width
ft
Side
Slope
Top
Width
ft
Channel
Slope
%
Channel
(Lining
1
0.34 ft
2.00 ft
2:1
3.36 ft
1.00%
Exc. SR-1
2
0.29 ft
2.00 ft
2:1
3.16 ft
1.67%
Exc. SR-1
3
0.25 ft
2.00 ft
2:1
3.00 ft
3.63%
Exc. SR-1
4
0.24 ft
2.00 ft
2:1
2.96 ft
3.76%
Exc. SR-1
Landscape Architecture " Fayetteville, NC
Civil Engineering " Southern Pines, NC
230C W. Pennsylvania Ave. - Southern Pines, NC 28387
Voice: 910-725-1107
w w w. c r a w f o r d d s n. c o m
,,�pT�T1,#11111111111NjI
I%,,DES I GN0010 1- S l G
C% ,,CI�OO,O O WVEER I��
i
',�q7 7
10 ci CERT. No. 6 � CERT. No.
C-136 a 2 C-2097 g
�I� n oRTH CARS ,�, I, T RTH CARD
LLE , ,���V4*5
�hI1111111/h�� I� ��
SEALS
REVISIONS
z
O
i
0
U
'C\A R
SEAL _
027502
LNG IN �P`\�1:
X_\X4
J
0
F-
Z
O
V
Z
O
O
W
Z
J
J
O
Z
O
U
Z
O
U)
O/
0.
LU
0
Z
�Q
V
Z_
�L.L
V
PROJECT DETAILS
Project Manager: KSL
CAD Technician: RFN/CER
Reviewed / Approved By: --- /---
Project Number: 20014
SCALE 0 100 200
Full Scale: Horiz.: 1" = 100'
Half Scale: Horiz.: 1" = 200'
ISSUE DATE
11 /2 3/2 02 0
SHEET NUMBER
C3,0