Loading...
HomeMy WebLinkAboutNCC220785_Site Plan or Location Map_20220224N O N O U, ED ED CD CD O U O O N / i U, / CD 0 / O O N / 0 Q U EE- a Q O U 0 O N O N N s� VICINITY MAP(N.T.S.) ITE GRADING / EROSION CONTROL NOTES 1 CONSTRUCTION ENTRANCE - SEE CDC DETAIL NO. 2.1001 2 SILT FENCE - SEE CDC DETAIL NO. 2.1204 3 SILT FENCE OUTLET - SEE CDC DETAIL NO. 2.1405 Q TEMPORARY DIVERSION BERM AND SWALE - SEE CDC DETAIL NO. 2.1202 e TEMPORARY SKIMMER BASIN -SEE CDC DETAIL NO 2.1610 ADDITIONAL NOTES 1. ALL GENERAL NOTES, ABBREVIATIONS, SYMBOLS, AND OTHER INFORMATION (7 DAY GROUND COVER) INDICATED ON COVER SHEET SHALL APPLY TO THIS PLAN ' %' ___ __�______ 2. PURSUANT TO G.S. 1 13A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS ' \ l------------------ SHALL �;' BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY ._-__-___-' � --- - \ VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR \ ------ ----- - STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 or 14 \---�"-- - ; CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED \ - �_;'. - - OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND \ - - - I % \ COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL \\ -------------------- DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS \ -------------- (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR \ _ - DEVELOPMENT. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS \ �`--------- ---_.Y �- NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE \ ^`._- - - -fr, =' �' I\ ;%;'t J \ \ VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATION COVER. IF ANY SEEDING FAILURE OCCURS, THOSE AREAS SHALL BE RE -SEEDED WITH \ /`., ;--- ---- f ---- ,2�\''' f--!' t\ i \ f- �`�\`., \ \\ RYE GRAIN FOR TEMPORARY STABILIZATION AND PREPARED FOR PERMANENT SEEDING. \ --- f, -r - -,-------- 3. SEE DETAIL SHEETS FOR EROSION CONTROL MEASURES & MAINTENANCE. 4. CONTACT PERSON: KEVIN LINDSAY, PE, (910) 920-7661 \ f' `' i j j ; i J`.,'`•�`� \ 5. PARCEL IDENTIFICATION NUMBER(S): 0419-50-3525 REID: 0419503525000 ------- 6. CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES ONLY AFTER REMOVAL HAS BE APPROVED BY DENR. -- __-__-_---r' \ 1 ?i 1� ; !� I i ;' \ \ 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING EROSION AND \ -`1, '4 ; DIVERSION BERM AND SWALE 2 \ -- 1 r 1 7 DAY GROUND COVER \ \ SEDIMENTATION CONTROL MONITORING ACCORDING TO NPDES PERMIT \ V '� ��0.�� ( ) \ REQUIREMENTS. A V `� ?j i 1 ! 1 3 v v 8. SEE DETAIL SHEETS FOR TEMPORARY & PERMANENT SEEDING REQUIREMENTS. \ \ -- -_ ---- -- -- _--- _ DWQ Construction General Permit Ground Stabilization Requirements Site Area Stabilization StabilizationTime Description Time Frame Frame Exceptions Perimeter dikes, swales, 7 days None ditches and slopes High Quality Water (HQW) 7 days None Zones If slopes are 10' or less in length Slopes steeper 7 days and are not than 3:1 steeper than 2:1, 14 days are allowed 7-days for Slopes 3:1 or 14 days slopes greater flatter than 50 feet in length None (except All other areas for perimeters with slopes 14 days and HQW flatter than 4:1 Zones) * "Extensions of time may be approved by the permitting authority based on weather or other site -specific condition that make compliance impracticable." (Sectio 11.13(2)(b)) Construction sequence will be as follows: 1. Obtain all necessary permits and approvals and hold pre -construction conference. 2. Install Gravel Construction Entrance as shown on plans and details. 3. Install Sediment Fence on all downstream slopes as shown on plans and details. 4. Install Silt Fence Outlets as shown on plans as shown on plans and details . 5. Install Skimmer Basins as shown on plans as shown on plans and details. 6. Install Diversion Berms and Swales as shown on plans and details. 7. Establish ground cover on all remaining disturbed areas. Follow fertilizing, seeding, and mulching listed in details. 8. Once the construction has been completed and the area stabilized and released by NCDEQ, the temporary erosion control measures shall be removed Swale Summary Swale Minimum Depth ft Bottom Width ft Side Slope Top Width ft Channel Slope % Channel (Lining 1 0.34 ft 2.00 ft 2:1 3.36 ft 1.00% Exc. SR-1 2 0.29 ft 2.00 ft 2:1 3.16 ft 1.67% Exc. SR-1 3 0.25 ft 2.00 ft 2:1 3.00 ft 3.63% Exc. SR-1 4 0.24 ft 2.00 ft 2:1 2.96 ft 3.76% Exc. SR-1 Landscape Architecture " Fayetteville, NC Civil Engineering " Southern Pines, NC 230C W. Pennsylvania Ave. - Southern Pines, NC 28387 Voice: 910-725-1107 w w w. c r a w f o r d d s n. c o m ,,�pT�T1,#11111111111NjI I%,,DES I GN0010 1- S l G C% ,,CI�OO,O O WVEER I�� i ',�q7 7 10 ci CERT. No. 6 � CERT. No. C-136 a 2 C-2097 g �I� n oRTH CARS ,�, I, T RTH CARD LLE , ,���V4*5 �hI1111111/h�� I� �� SEALS REVISIONS z O i 0 U 'C\A R SEAL _ 027502 LNG IN �P`\�1: X_\X4 J 0 F- Z O V Z O O W Z J J O Z O U Z O U) O/ 0. LU 0 Z �Q V Z_ �L.L V PROJECT DETAILS Project Manager: KSL CAD Technician: RFN/CER Reviewed / Approved By: --- /--- Project Number: 20014 SCALE 0 100 200 Full Scale: Horiz.: 1" = 100' Half Scale: Horiz.: 1" = 200' ISSUE DATE 11 /2 3/2 02 0 SHEET NUMBER C3,0