Loading...
HomeMy WebLinkAboutSW3211203_Supplement-EZ Form_20220223SUPPLEMENT-EZ COVER PAGE FORM5LOA044 PROJECT INFORMATION 1 Pro ed Name BG Stewart Solar Farts, L:LC 2 Project Area (tic)___^ 382 3 Coastal Wetland Area (ac) 0 4 Surtace Water Area Sac) 0 5 IS this 6 Does this project use an off -site SCM? No PLiANCE WITH 02H .1003(4j 7 Wivegetated setbacks_Qrovided (feet) __.._._.,.— 15 _ 8 WIII the 9 If BUA ieQro osed in the setback, does k meet NCAC 02H�1003(4 o d ? WA ... L 10 Is streambank stabilization proposed on this project? No NUMBERY1NO 7<YPE OF SC.w,_...•._....�...._. _..._._�_.�._..._.�._..�.�._,_•.�.....�..,._.,,_._,....�..,-�.�....-_.�._.....,..�. 11 Infiltration System 12 Bloretention Cell- 13 Wet Pond 14 StormwaterWetland "-'— --"-------- .�--•_.._,_.__.,�._..__._ _. 15 Permeable Pavement —16 Sand Fit------jM@0tj 17 RainwaHarves 18 Green Roof 19 Level Spreader -Filer Stri�LS•FS) 20 Disconnected Impervious Surfeoe (DIS) 21 Treatment Swale _ 22 Dry Pond ------• .__._.__.__�__.__ _...�_. �____.__._._. _..:___.__._.u___.._____._._ .—_,.._.__._ _._.4 - _23 Stomn liter 24 Silva Cell__.._...____...—.____....___.._______,....__�—�._..—_—.-- 26 FlRerra FORMSLOADEp 1(3NER CLrRTtftCAT10N 27 Name and Tige: ,tr... Marto T. Cartoon Civil Engineering Manager Renewables, LLC —29 Streat address: _ _ — 5310 S. Alston Ave Bldg 300 30 CiiZi State, Z�w _ — Durham, NC 277'13 31 _ _ Phone number(s): _. _ _._ _ _-- __ter ____............._._ ..__910) 90fr1540 32 Email �marb.carreonCocrenawcom^_�^.—� Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided In the forth Is, to the hest of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting Information are consistent with the information provided here. ,,�0�'tH CARO Qft-jpFESS%p9`�,9 SEAL = 045182Or Of i 10 .,, C Signature of /.;-7// -z-;, I ?-/ Date 111 DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? I No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 4 Type of SCM DIS DIS 5 Total drainage area (sq ft) 1707552 6 Onsite drainage area (sq ft) 1707552 7 Offsite drainage area (sq ft) 8 Total BUA in project (sq ft) 18319 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) 10 New BUA not on subdivided lots (subject to permitting) (so Offsite BUA (sq ft) 11 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 16947 sf 1571 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 1.07% 19 Design storm (inches) N/A 20 Design volume of SCM (cu ft) N/A 21 Calculation method for design volume N/A ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Inverter equipment pads and steel piles supporting fixed tilt Solr PV system. LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSI ROJECTS FROM 02 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (%) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? No 14 Are variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: Solar farm construction was completed in 2015 and all project disturbed areas are vegetated. There are no permanent SCMs for the project - all flow is considered dispersed sheet flow. Swale Drainage BUA Pervious Q Slope Vallow Vactual Flow depth # Are (ac) area C (cfs) (%) (fps) (fps) (ft) (ac1 39.20 0.42 38.78 0.40 2 3 4 5